Width of Unit Hydrograph at 75 percent Peak Discharge Solution

STEP 0: Pre-Calculation Summary
Formula Used
Width of Unit Hydrograph at 75% Peak Discharge = Width of Unit Hydrograph at 50% Peak Discharge/1.75
W75 = W50/1.75
This formula uses 2 Variables
Variables Used
Width of Unit Hydrograph at 75% Peak Discharge - (Measured in Meter) - Width of Unit Hydrograph at 75% Peak Discharge of unit hydrograph in hydrology is to provide an estimate of direct runoff hydrograph resulting from given excess rainfall hyetograph.
Width of Unit Hydrograph at 50% Peak Discharge - (Measured in Meter) - Width of Unit Hydrograph at 50% Peak Discharge. The role of unit hydrograph in hydrology is to provide an estimate of direct runoff hydrograph resulting from given excess rainfall hyetograph.
STEP 1: Convert Input(s) to Base Unit
Width of Unit Hydrograph at 50% Peak Discharge: 1.8 Millimeter --> 0.0018 Meter (Check conversion ​here)
STEP 2: Evaluate Formula
Substituting Input Values in Formula
W75 = W50/1.75 --> 0.0018/1.75
Evaluating ... ...
W75 = 0.00102857142857143
STEP 3: Convert Result to Output's Unit
0.00102857142857143 Meter -->1.02857142857143 Millimeter (Check conversion ​here)
FINAL ANSWER
1.02857142857143 1.028571 Millimeter <-- Width of Unit Hydrograph at 75% Peak Discharge
(Calculation completed in 00.004 seconds)

Credits

Creator Image
Created by Mithila Muthamma PA
Coorg Institute of Technology (CIT), Coorg
Mithila Muthamma PA has created this Calculator and 2000+ more calculators!
Verifier Image
Verified by Chandana P Dev
NSS College of Engineering (NSSCE), Palakkad
Chandana P Dev has verified this Calculator and 1700+ more calculators!

Synder's Synthetic Unit Hydrograph Calculators

Regional Constant given Peak Discharge for Nonstandard Effective Rainfall
​ LaTeX ​ Go Regional Constant (Snyder) = Peak Discharge*Modified Basin Lag/(2.78*Area of Catchment)
Peak Discharge for Nonstandard Effective Rainfall
​ LaTeX ​ Go Peak Discharge = 2.78*Regional Constant (Snyder)*Area of Catchment/Modified Basin Lag
Catchment Area given Peak Discharge for Nonstandard Effective Rainfall
​ LaTeX ​ Go Area of Catchment = Peak Discharge*Modified Basin Lag/(2.78*Regional Constant)
Modified Basin Lag given Peak Discharge for Nonstandard Effective Rainfall
​ LaTeX ​ Go Modified Basin Lag = 2.78*Regional Constant*Area of Catchment/Peak Discharge

Width of Unit Hydrograph at 75 percent Peak Discharge Formula

​LaTeX ​Go
Width of Unit Hydrograph at 75% Peak Discharge = Width of Unit Hydrograph at 50% Peak Discharge/1.75
W75 = W50/1.75

What is difference between Synthetic Unit Hydrograph & Unit Hydrograph?

A Synthetic Unit Hydrograph retains all the features of the unit hydrograph but does not require rainfall-runoff data. A synthetic unit hydrograph is derived from theory and experience, and its purpose is to simulate basin diffusion by estimating the basin lag based on a certain formula or procedure.
A Unit Hydrograph shows the temporal change in flow, or discharge, per unit of runoff. In other words, how the flow of a stream will be affected over time by the addition of one unit of runoff. The unit hydrograph is a useful tool in the process of predicting the impact of precipitation on streamflow.

What is Basin Lag?

Basin lag time, defined as the elapsed time between the occurrences of the centroids of the effective rainfall and the storm runoff hydrograph, is an important factor in determining the time to peak of the unit hydrograph and the intensity of peak discharge.

How to Calculate Width of Unit Hydrograph at 75 percent Peak Discharge?

Width of Unit Hydrograph at 75 percent Peak Discharge calculator uses Width of Unit Hydrograph at 75% Peak Discharge = Width of Unit Hydrograph at 50% Peak Discharge/1.75 to calculate the Width of Unit Hydrograph at 75% Peak Discharge, The Width of Unit Hydrograph at 75 percent Peak Discharge formula is defined as the geometric parameter of the unit hydrograph correlated to the peak discharge intensity, found to assist in the sketching of unit hydrographs. Width of Unit Hydrograph at 75% Peak Discharge is denoted by W75 symbol.

How to calculate Width of Unit Hydrograph at 75 percent Peak Discharge using this online calculator? To use this online calculator for Width of Unit Hydrograph at 75 percent Peak Discharge, enter Width of Unit Hydrograph at 50% Peak Discharge (W50) and hit the calculate button. Here is how the Width of Unit Hydrograph at 75 percent Peak Discharge calculation can be explained with given input values -> 1028.571 = 0.0018/1.75.

FAQ

What is Width of Unit Hydrograph at 75 percent Peak Discharge?
The Width of Unit Hydrograph at 75 percent Peak Discharge formula is defined as the geometric parameter of the unit hydrograph correlated to the peak discharge intensity, found to assist in the sketching of unit hydrographs and is represented as W75 = W50/1.75 or Width of Unit Hydrograph at 75% Peak Discharge = Width of Unit Hydrograph at 50% Peak Discharge/1.75. Width of Unit Hydrograph at 50% Peak Discharge. The role of unit hydrograph in hydrology is to provide an estimate of direct runoff hydrograph resulting from given excess rainfall hyetograph.
How to calculate Width of Unit Hydrograph at 75 percent Peak Discharge?
The Width of Unit Hydrograph at 75 percent Peak Discharge formula is defined as the geometric parameter of the unit hydrograph correlated to the peak discharge intensity, found to assist in the sketching of unit hydrographs is calculated using Width of Unit Hydrograph at 75% Peak Discharge = Width of Unit Hydrograph at 50% Peak Discharge/1.75. To calculate Width of Unit Hydrograph at 75 percent Peak Discharge, you need Width of Unit Hydrograph at 50% Peak Discharge (W50). With our tool, you need to enter the respective value for Width of Unit Hydrograph at 50% Peak Discharge and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!