Utilisation Factor of Plant Solution

STEP 0: Pre-Calculation Summary
Formula Used
Utilisation Factor = Maximum Demand/Plant Capacity
UF = Max Demand/Plant Capacity
This formula uses 3 Variables
Variables Used
Utilisation Factor - Utilisation Factor is the ratio of the actual output from a solar plant over the year to the maximum possible output from it for a year under ideal conditions.
Maximum Demand - (Measured in Watt) - Maximum Demand is defined as the peak power consumption of the load connected.
Plant Capacity - (Measured in Watt) - Plant Capacity is the total capacity of the energy which is produced in the plant or can provide energy to system.
STEP 1: Convert Input(s) to Base Unit
Maximum Demand: 1700 Kilowatt --> 1700000 Watt (Check conversion ​here)
Plant Capacity: 2875 Kilowatt --> 2875000 Watt (Check conversion ​here)
STEP 2: Evaluate Formula
Substituting Input Values in Formula
UF = Max Demand/Plant Capacity --> 1700000/2875000
Evaluating ... ...
UF = 0.591304347826087
STEP 3: Convert Result to Output's Unit
0.591304347826087 --> No Conversion Required
FINAL ANSWER
0.591304347826087 0.591304 <-- Utilisation Factor
(Calculation completed in 00.004 seconds)

Credits

Creator Image
Created by Parminder Singh
Chandigarh University (CU), Punjab
Parminder Singh has created this Calculator and 100+ more calculators!
Verifier Image
Verified by Aman Dhussawat
GURU TEGH BAHADUR INSTITUTE OF TECHNOLOGY (GTBIT), NEW DELHI
Aman Dhussawat has verified this Calculator and 100+ more calculators!

Power Plant Operational Factors Calculators

Unit Generated per Annum
​ LaTeX ​ Go Units Generated = Maximum Demand*Load Factor*8760
Demand Factor
​ LaTeX ​ Go Demand Factor = Maximum Demand/Connected Load
Load Factor given Average Load and Maximum Demand
​ LaTeX ​ Go Load Factor = Average Load/Maximum Demand
Average Load for Load Curve
​ LaTeX ​ Go Average Load = Load Curve Area/24

Utilisation Factor of Plant Formula

​LaTeX ​Go
Utilisation Factor = Maximum Demand/Plant Capacity
UF = Max Demand/Plant Capacity

What is responsibility factor?

Responsibility factor is often used in guiding demand side management. Utilities often get charged for its contribution to the peak of independent system operator. To avoid a high charge, a utility has to reduce the responsibility factor. This can be done by implementing various programs that help shift the peak. Similarly, responsibility factor is also used in rate making. A customer with high peak demand may not get high demand charge if the peak occurs during off-peak period of the utility system load.

How to Calculate Utilisation Factor of Plant?

Utilisation Factor of Plant calculator uses Utilisation Factor = Maximum Demand/Plant Capacity to calculate the Utilisation Factor, The Utilisation Factor of Plant formula is defined as the ratio of the actual output from a solar plant over the year to the maximum possible output from it for a year under ideal conditions. Utilisation Factor is denoted by UF symbol.

How to calculate Utilisation Factor of Plant using this online calculator? To use this online calculator for Utilisation Factor of Plant, enter Maximum Demand (Max Demand) & Plant Capacity (Plant Capacity) and hit the calculate button. Here is how the Utilisation Factor of Plant calculation can be explained with given input values -> 0.591304 = 1700000/2875000.

FAQ

What is Utilisation Factor of Plant?
The Utilisation Factor of Plant formula is defined as the ratio of the actual output from a solar plant over the year to the maximum possible output from it for a year under ideal conditions and is represented as UF = Max Demand/Plant Capacity or Utilisation Factor = Maximum Demand/Plant Capacity. Maximum Demand is defined as the peak power consumption of the load connected & Plant Capacity is the total capacity of the energy which is produced in the plant or can provide energy to system.
How to calculate Utilisation Factor of Plant?
The Utilisation Factor of Plant formula is defined as the ratio of the actual output from a solar plant over the year to the maximum possible output from it for a year under ideal conditions is calculated using Utilisation Factor = Maximum Demand/Plant Capacity. To calculate Utilisation Factor of Plant, you need Maximum Demand (Max Demand) & Plant Capacity (Plant Capacity). With our tool, you need to enter the respective value for Maximum Demand & Plant Capacity and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!