Trips per Hour given Production of Scrap by Machines Solution

STEP 0: Pre-Calculation Summary
Formula Used
Trips per Hour = (Production Required in Scraper Production/Load in Scraper Production)
f = (Ps/L)
This formula uses 3 Variables
Variables Used
Trips per Hour - (Measured in Hertz) - Trips per Hour means the total transfer occured in a hour.
Production Required in Scraper Production - (Measured in Cubic Meter per Second) - Production Required in Scraper Production is the amount of scrap produced.
Load in Scraper Production - (Measured in Cubic Meter) - Load in Scraper Production is the volume of scrap produced in every trip.
STEP 1: Convert Input(s) to Base Unit
Production Required in Scraper Production: 75 Cubic Meter per Hour --> 0.0208333333333333 Cubic Meter per Second (Check conversion ​here)
Load in Scraper Production: 18.2 Cubic Meter --> 18.2 Cubic Meter No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
f = (Ps/L) --> (0.0208333333333333/18.2)
Evaluating ... ...
f = 0.00114468864468864
STEP 3: Convert Result to Output's Unit
0.00114468864468864 Hertz -->4.12087912087912 Revolution per Hour (Check conversion ​here)
FINAL ANSWER
4.12087912087912 4.120879 Revolution per Hour <-- Trips per Hour
(Calculation completed in 00.004 seconds)

Credits

Creator Image
Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2100+ more calculators!
Verifier Image
Verified by Rithik Agrawal
National Institute of Technology Karnataka (NITK), Surathkal
Rithik Agrawal has verified this Calculator and 400+ more calculators!

Scraper Production Calculators

Trips per Hour given Production of Scrap by Machines
​ LaTeX ​ Go Trips per Hour = (Production Required in Scraper Production/Load in Scraper Production)
Load Given Production of Scrap by Machines
​ LaTeX ​ Go Load in Scraper Production = (Production Required in Scraper Production/Trips per Hour)
Production of Scrap by Machines
​ LaTeX ​ Go Production Required in Scraper Production = (Load in Scraper Production*Trips per Hour)
Trips per Hour for Excavating Scrap
​ LaTeX ​ Go Trips per Hour = (Working Time in Scraper Production/Cycle Time)

Trips per Hour given Production of Scrap by Machines Formula

​LaTeX ​Go
Trips per Hour = (Production Required in Scraper Production/Load in Scraper Production)
f = (Ps/L)

What is Scrap?

Scrap means waste that either has no economic value or only the value of its basic material content recoverable through recycling. In ERPNext, at the end of manufacturing process, scrap items are accounted in the scrap warehouses.

How to Calculate Trips per Hour given Production of Scrap by Machines?

Trips per Hour given Production of Scrap by Machines calculator uses Trips per Hour = (Production Required in Scraper Production/Load in Scraper Production) to calculate the Trips per Hour, The Trips per Hour given Production of Scrap by Machines is defined as the number of trips which will be needed for production of scrap. Trips per Hour is denoted by f symbol.

How to calculate Trips per Hour given Production of Scrap by Machines using this online calculator? To use this online calculator for Trips per Hour given Production of Scrap by Machines, enter Production Required in Scraper Production (Ps) & Load in Scraper Production (L) and hit the calculate button. Here is how the Trips per Hour given Production of Scrap by Machines calculation can be explained with given input values -> 14835.16 = (0.0208333333333333/18.2).

FAQ

What is Trips per Hour given Production of Scrap by Machines?
The Trips per Hour given Production of Scrap by Machines is defined as the number of trips which will be needed for production of scrap and is represented as f = (Ps/L) or Trips per Hour = (Production Required in Scraper Production/Load in Scraper Production). Production Required in Scraper Production is the amount of scrap produced & Load in Scraper Production is the volume of scrap produced in every trip.
How to calculate Trips per Hour given Production of Scrap by Machines?
The Trips per Hour given Production of Scrap by Machines is defined as the number of trips which will be needed for production of scrap is calculated using Trips per Hour = (Production Required in Scraper Production/Load in Scraper Production). To calculate Trips per Hour given Production of Scrap by Machines, you need Production Required in Scraper Production (Ps) & Load in Scraper Production (L). With our tool, you need to enter the respective value for Production Required in Scraper Production & Load in Scraper Production and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
How many ways are there to calculate Trips per Hour?
In this formula, Trips per Hour uses Production Required in Scraper Production & Load in Scraper Production. We can use 1 other way(s) to calculate the same, which is/are as follows -
  • Trips per Hour = (Working Time in Scraper Production/Cycle Time)
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!