Transverse Shrinkage in First Pass given Total Shrinkage Solution

STEP 0: Pre-Calculation Summary
Formula Used
Transverse Shrinkage in First Pass = Total Transverse Shrinkage-Constant For Multi Pass Shrinkage*(log10(Total Weight of Weld Metal Deposited/Weld Metal Deposited in First Pass))
S0 = St-b*(log10(w/w0))
This formula uses 1 Functions, 5 Variables
Functions Used
log10 - The common logarithm, also known as the base-10 logarithm or the decimal logarithm, is a mathematical function that is the inverse of the exponential function., log10(Number)
Variables Used
Transverse Shrinkage in First Pass - (Measured in Meter) - Transverse Shrinkage in First Pass is the shrinkage occur on weld joint surface after the first welding.
Total Transverse Shrinkage - (Measured in Meter) - Total Transverse Shrinkage is the amount by which weldment shrinks due to multiple passes.
Constant For Multi Pass Shrinkage - Constant For Multi Pass Shrinkage is total transverse shrinkage due to multi-pass welding.
Total Weight of Weld Metal Deposited - (Measured in Kilogram) - Total Weight of Weld Metal Deposited is the amount of metal deposited during welding.
Weld Metal Deposited in First Pass - (Measured in Kilogram) - Weld Metal Deposited in First Pass is just metal deposited in single pass of welding.
STEP 1: Convert Input(s) to Base Unit
Total Transverse Shrinkage: 5.3 Millimeter --> 0.0053 Meter (Check conversion ​here)
Constant For Multi Pass Shrinkage: 0.24 --> No Conversion Required
Total Weight of Weld Metal Deposited: 5.14064 Gram --> 0.00514064 Kilogram (Check conversion ​here)
Weld Metal Deposited in First Pass: 4.99 Gram --> 0.00499 Kilogram (Check conversion ​here)
STEP 2: Evaluate Formula
Substituting Input Values in Formula
S0 = St-b*(log10(w/w0)) --> 0.0053-0.24*(log10(0.00514064/0.00499))
Evaluating ... ...
S0 = 0.00220000506005465
STEP 3: Convert Result to Output's Unit
0.00220000506005465 Meter -->2.20000506005465 Millimeter (Check conversion ​here)
FINAL ANSWER
2.20000506005465 2.200005 Millimeter <-- Transverse Shrinkage in First Pass
(Calculation completed in 00.004 seconds)

Credits

Creator Image
Created by Rajat Vishwakarma
University Institute of Technology RGPV (UIT - RGPV), Bhopal
Rajat Vishwakarma has created this Calculator and 400+ more calculators!
Verifier Image
Verified by Nishan Poojary
Shri Madhwa Vadiraja Institute of Technology and Management (SMVITM), Udupi
Nishan Poojary has verified this Calculator and 400+ more calculators!

Butt Joints Calculators

Total Transverse Shrinkage during Multi-Pass Welding of Butt Joint
​ LaTeX ​ Go Total Transverse Shrinkage = Transverse Shrinkage in First Pass+Constant For Multi Pass Shrinkage*(log10(Total Weight of Weld Metal Deposited/Weld Metal Deposited in First Pass))
Plate Thickness for given Transverse Shrinkage in Butt Joints
​ LaTeX ​ Go Plate Thickness in Butt Joint = (5.08*Cross Sectional Area of Weld)/(Transverse Shrinkage of Butt Joint-(1.27*Root Opening))
Transverse Shrinkage in Butt Joints
​ LaTeX ​ Go Transverse Shrinkage of Butt Joint = (5.08*(Cross Sectional Area of Weld/Plate Thickness in Butt Joint))+(1.27*Root Opening)
Cross-sectional area of weld for given transverse shrinkage in butt joints
​ LaTeX ​ Go Cross Sectional Area of Weld = (Plate Thickness in Butt Joint*(Transverse Shrinkage of Butt Joint-1.27*Root Opening))/5.08

Transverse Shrinkage in First Pass given Total Shrinkage Formula

​LaTeX ​Go
Transverse Shrinkage in First Pass = Total Transverse Shrinkage-Constant For Multi Pass Shrinkage*(log10(Total Weight of Weld Metal Deposited/Weld Metal Deposited in First Pass))
S0 = St-b*(log10(w/w0))

What is called Distortion in welding terms ?

One of the major problems found with weldments is the distortion. Distortion is caused mainly because of the shrinkage that take place in weldments. The shrinkage taking place in a weldment depends upon the geometry and type of the weld. There are three types of distortions possible in weldments.

(a) Transverse shrinkage occurring perpendicular to the weld line.
(b) Longitudinal shrinkage occurring parallel to the weld line, which is very small of the order of about 0.1% of the weld length and hence can be neglected.
(c) Angular change as a rotation about the weld line.

How to Calculate Transverse Shrinkage in First Pass given Total Shrinkage?

Transverse Shrinkage in First Pass given Total Shrinkage calculator uses Transverse Shrinkage in First Pass = Total Transverse Shrinkage-Constant For Multi Pass Shrinkage*(log10(Total Weight of Weld Metal Deposited/Weld Metal Deposited in First Pass)) to calculate the Transverse Shrinkage in First Pass, The Transverse Shrinkage in First Pass given Total Shrinkage formula is defined as the shrinkage occurring perpendicular to the weld line. Transverse Shrinkage in First Pass is denoted by S0 symbol.

How to calculate Transverse Shrinkage in First Pass given Total Shrinkage using this online calculator? To use this online calculator for Transverse Shrinkage in First Pass given Total Shrinkage, enter Total Transverse Shrinkage (St), Constant For Multi Pass Shrinkage (b), Total Weight of Weld Metal Deposited (w) & Weld Metal Deposited in First Pass (w0) and hit the calculate button. Here is how the Transverse Shrinkage in First Pass given Total Shrinkage calculation can be explained with given input values -> 2010.396 = 0.0053-0.24*(log10(0.00514064/0.00499)).

FAQ

What is Transverse Shrinkage in First Pass given Total Shrinkage?
The Transverse Shrinkage in First Pass given Total Shrinkage formula is defined as the shrinkage occurring perpendicular to the weld line and is represented as S0 = St-b*(log10(w/w0)) or Transverse Shrinkage in First Pass = Total Transverse Shrinkage-Constant For Multi Pass Shrinkage*(log10(Total Weight of Weld Metal Deposited/Weld Metal Deposited in First Pass)). Total Transverse Shrinkage is the amount by which weldment shrinks due to multiple passes, Constant For Multi Pass Shrinkage is total transverse shrinkage due to multi-pass welding, Total Weight of Weld Metal Deposited is the amount of metal deposited during welding & Weld Metal Deposited in First Pass is just metal deposited in single pass of welding.
How to calculate Transverse Shrinkage in First Pass given Total Shrinkage?
The Transverse Shrinkage in First Pass given Total Shrinkage formula is defined as the shrinkage occurring perpendicular to the weld line is calculated using Transverse Shrinkage in First Pass = Total Transverse Shrinkage-Constant For Multi Pass Shrinkage*(log10(Total Weight of Weld Metal Deposited/Weld Metal Deposited in First Pass)). To calculate Transverse Shrinkage in First Pass given Total Shrinkage, you need Total Transverse Shrinkage (St), Constant For Multi Pass Shrinkage (b), Total Weight of Weld Metal Deposited (w) & Weld Metal Deposited in First Pass (w0). With our tool, you need to enter the respective value for Total Transverse Shrinkage, Constant For Multi Pass Shrinkage, Total Weight of Weld Metal Deposited & Weld Metal Deposited in First Pass and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!