How to Calculate Total Tool Changing Time using Average Production Cost?
Total Tool Changing Time using Average Production Cost calculator uses Total Tool Changing Time = (Batch Size*(Production Cost of Each Component-Cost of a Tool*(Setup Time+Machining Time))-Number of Tools Used*Cost of a Tool)/(Cost of a Tool) to calculate the Total Tool Changing Time, The Total Tool Changing Time using Average Production Cost refers to the duration required to replace a tool in a machine during the manufacturing process. This includes the time taken to stop the machine, remove the old tool, install the new tool, calibrate or set up the machine for the new tool, and perform any necessary quality checks to ensure the machine is ready for production. Total Tool Changing Time is denoted by Tct symbol.
How to calculate Total Tool Changing Time using Average Production Cost using this online calculator? To use this online calculator for Total Tool Changing Time using Average Production Cost, enter Batch Size (Nb), Production Cost of Each Component (Cpr), Cost of a Tool (Ct), Setup Time (ts), Machining Time (tm) & Number of Tools Used (Nt) and hit the calculate button. Here is how the Total Tool Changing Time using Average Production Cost calculation can be explained with given input values -> 0.025 = (2*(11400-80*(27+69))-3*80)/(80).