Total Production Time Solution

STEP 0: Pre-Calculation Summary
Formula Used
Total Production Time = (Total Machining Time+Non Productive Time+Total Tool Changing Time)
TPT = (TMT+NPT+TCT)
This formula uses 4 Variables
Variables Used
Total Production Time - (Measured in Second) - Total Production Time is the net time taken to produce a complete match of products, including overheads.
Total Machining Time - (Measured in Second) - Total Machining Time is the total processing time required on one or more machines to produce a batch of products.
Non Productive Time - (Measured in Second) - Non Productive Time is the total time wasted in setting up the machine or workpiece for a particular process.
Total Tool Changing Time - (Measured in Second) - Total Tool Changing Time is the average time required by the operator or automation system to change the tool.
STEP 1: Convert Input(s) to Base Unit
Total Machining Time: 92 Second --> 92 Second No Conversion Required
Non Productive Time: 108 Second --> 108 Second No Conversion Required
Total Tool Changing Time: 900 Second --> 900 Second No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
TPT = (TMT+NPT+TCT) --> (92+108+900)
Evaluating ... ...
TPT = 1100
STEP 3: Convert Result to Output's Unit
1100 Second --> No Conversion Required
FINAL ANSWER
1100 Second <-- Total Production Time
(Calculation completed in 00.004 seconds)

Credits

Creator Image
Created by Kumar Siddhant
Indian Institute of Information Technology, Design and Manufacturing (IIITDM), Jabalpur
Kumar Siddhant has created this Calculator and 400+ more calculators!
Verifier Image
Verified by Parul Keshav
National Institute of Technology (NIT), Srinagar
Parul Keshav has verified this Calculator and 400+ more calculators!

Total Production Time Calculators

Total Machining Time or Total Machine Time
​ LaTeX ​ Go Total Machining Time = Batch Size*Machining Time
Load or Unload or Setup Time given Total Non-Productive Time
​ LaTeX ​ Go Setup Time = Non Productive Time/Batch Size
Size of Batch using Total Non-Productive Time
​ LaTeX ​ Go Batch Size = Non Productive Time/Setup Time
Total Non-Productive Time
​ LaTeX ​ Go Non Productive Time = Batch Size*Setup Time

Total Production Time Formula

​LaTeX ​Go
Total Production Time = (Total Machining Time+Non Productive Time+Total Tool Changing Time)
TPT = (TMT+NPT+TCT)

What is Batch Production ?

Batch production is a method of manufacturing where the products are made as specified groups or amounts, within a time frame. A batch can go through a series of steps in a large manufacturing process to make the final desired product.

How to Calculate Total Production Time?

Total Production Time calculator uses Total Production Time = (Total Machining Time+Non Productive Time+Total Tool Changing Time) to calculate the Total Production Time, The Total Production Time is defined as the total time it takes to produce a complete batch of components from scratch. Total Production Time is denoted by TPT symbol.

How to calculate Total Production Time using this online calculator? To use this online calculator for Total Production Time, enter Total Machining Time (TMT), Non Productive Time (NPT) & Total Tool Changing Time (TCT) and hit the calculate button. Here is how the Total Production Time calculation can be explained with given input values -> 470 = (92+108+900).

FAQ

What is Total Production Time?
The Total Production Time is defined as the total time it takes to produce a complete batch of components from scratch and is represented as TPT = (TMT+NPT+TCT) or Total Production Time = (Total Machining Time+Non Productive Time+Total Tool Changing Time). Total Machining Time is the total processing time required on one or more machines to produce a batch of products, Non Productive Time is the total time wasted in setting up the machine or workpiece for a particular process & Total Tool Changing Time is the average time required by the operator or automation system to change the tool.
How to calculate Total Production Time?
The Total Production Time is defined as the total time it takes to produce a complete batch of components from scratch is calculated using Total Production Time = (Total Machining Time+Non Productive Time+Total Tool Changing Time). To calculate Total Production Time, you need Total Machining Time (TMT), Non Productive Time (NPT) & Total Tool Changing Time (TCT). With our tool, you need to enter the respective value for Total Machining Time, Non Productive Time & Total Tool Changing Time and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
How many ways are there to calculate Total Production Time?
In this formula, Total Production Time uses Total Machining Time, Non Productive Time & Total Tool Changing Time. We can use 2 other way(s) to calculate the same, which is/are as follows -
  • Total Production Time = (Batch Size*Setup Time+Batch Size*Machining Time+Number of Tools Used*Time to Change One Tool)
  • Total Production Time = Total Machining And Operating Cost/Machining And Operating Rate