Total Non-Productive Time using Average Production Cost Solution

STEP 0: Pre-Calculation Summary
Formula Used
Non Productive Time = (Batch Size*(Production Cost of Each Component-Cost of a Tool*Machining Time)-(Cost of a Tool*Number of Tools Used*Time to Change One Tool)-(Number of Tools Used*Cost of a Tool))/Cost of a Tool
Tnp = (Nb*(Cpr-Ct*tm)-(Ct*Nt*tc)-(Nt*Ct))/Ct
This formula uses 7 Variables
Variables Used
Non Productive Time - (Measured in Second) - Non Productive Time refers to the periods during the manufacturing process when the machine or operator is not engaged in active cutting or material removal.
Batch Size - Batch size refers to the number of identical parts produced in a single production run or cycle.
Production Cost of Each Component - Production cost of each component involves accounting for various factors, including material costs, labor, machine operating costs, tool costs, overhead, and other related expenses.
Cost of a Tool - Cost of a tool is a multifaceted consideration that includes the initial purchase price, maintenance costs, tool life, and the impact on overall production costs.
Machining Time - (Measured in Second) - Machining time refers to the total time required to complete a specific machining operation on a workpiece.
Number of Tools Used - The Number of Tools Used is the total number of tools used for manufacturing a batch of products.
Time to Change One Tool - (Measured in Second) - Time to change one tool often referred to as tool change time, includes the duration taken to remove the used tool and install a new one.
STEP 1: Convert Input(s) to Base Unit
Batch Size: 2 --> No Conversion Required
Production Cost of Each Component: 11400 --> No Conversion Required
Cost of a Tool: 80 --> No Conversion Required
Machining Time: 1.15 Minute --> 69 Second (Check conversion ​here)
Number of Tools Used: 3 --> No Conversion Required
Time to Change One Tool: 0.5 Minute --> 30 Second (Check conversion ​here)
STEP 2: Evaluate Formula
Substituting Input Values in Formula
Tnp = (Nb*(Cpr-Ct*tm)-(Ct*Nt*tc)-(Nt*Ct))/Ct --> (2*(11400-80*69)-(80*3*30)-(3*80))/80
Evaluating ... ...
Tnp = 54
STEP 3: Convert Result to Output's Unit
54 Second -->0.9 Minute (Check conversion ​here)
FINAL ANSWER
0.9 Minute <-- Non Productive Time
(Calculation completed in 00.020 seconds)

Credits

Creator Image
Created by Kumar Siddhant
Indian Institute of Information Technology, Design and Manufacturing (IIITDM), Jabalpur
Kumar Siddhant has created this Calculator and 400+ more calculators!
Verifier Image
Verified by Parul Keshav
National Institute of Technology (NIT), Srinagar
Parul Keshav has verified this Calculator and 400+ more calculators!

Average Production Cost Calculators

Total Non-Productive Time using Average Production Cost
​ LaTeX ​ Go Non Productive Time = (Batch Size*(Production Cost of Each Component-Cost of a Tool*Machining Time)-(Cost of a Tool*Number of Tools Used*Time to Change One Tool)-(Number of Tools Used*Cost of a Tool))/Cost of a Tool
Setup Time for Each Product given Average Production Cost
​ LaTeX ​ Go Setup Time = (Production Cost of Each Component-Cost of a Tool*Machining Time-(Number of Tools Used/Batch Size)*(Cost of a Tool*Time to Change One Tool+Cost of a Tool))/Cost of a Tool
Number of Tools used given Average Production Cost
​ LaTeX ​ Go Number of Tools Used = Batch Size*(Production Cost of Each Component-Cost of a Tool*(Setup Time+Machining Time))/(Cost of a Tool*Time to Change One Tool+Cost of a Tool)
Number of Tools used given Average Production Time
​ LaTeX ​ Go Number of Tools Used = Batch Size*(Average Production Time-(Setup Time+Machining Time))/Time to Change One Tool

Total Non-Productive Time using Average Production Cost Formula

​LaTeX ​Go
Non Productive Time = (Batch Size*(Production Cost of Each Component-Cost of a Tool*Machining Time)-(Cost of a Tool*Number of Tools Used*Time to Change One Tool)-(Number of Tools Used*Cost of a Tool))/Cost of a Tool
Tnp = (Nb*(Cpr-Ct*tm)-(Ct*Nt*tc)-(Nt*Ct))/Ct

Components of Non-Productive Time

1) Setup Time: Time required to prepare the machine, tools, and workpiece for production.
2) Tool Change Time: Time spent on changing worn-out or broken tools.
3) Machine Downtime: Periods when the machine is not operational due to maintenance, repairs, or adjustments.
4) Material Handling Time: Time spent on loading and unloading materials and components.
5) Waiting Time: Time spent waiting for materials, tools, or instructions.
6) Maintenance Time: Time allocated for preventive or corrective maintenance activities on machines and equipment.

Significance

1) Cost Management: Helps in identifying and reducing non-value-added activities, thereby minimizing associated costs.
2) Production Planning: Allows for more accurate scheduling of production runs and resource allocation.
3) Efficiency Improvement: Enables the identification of bottlenecks and inefficiencies in the production process for targeted improvements.
4) Capacity Utilization: Optimizes machine and labor utilization by minimizing downtime and idle time.

How to Calculate Total Non-Productive Time using Average Production Cost?

Total Non-Productive Time using Average Production Cost calculator uses Non Productive Time = (Batch Size*(Production Cost of Each Component-Cost of a Tool*Machining Time)-(Cost of a Tool*Number of Tools Used*Time to Change One Tool)-(Number of Tools Used*Cost of a Tool))/Cost of a Tool to calculate the Non Productive Time, The Total Non-Productive Time using Average Production Cost refers to the cumulative duration during which the manufacturing process is not actively producing parts. This includes any downtime, setup time, tool changes, maintenance, and other activities that do not directly contribute to the production of components. Understanding and minimizing non-productive time is essential for optimizing production efficiency and reducing overall manufacturing costs. Non Productive Time is denoted by Tnp symbol.

How to calculate Total Non-Productive Time using Average Production Cost using this online calculator? To use this online calculator for Total Non-Productive Time using Average Production Cost, enter Batch Size (Nb), Production Cost of Each Component (Cpr), Cost of a Tool (Ct), Machining Time (tm), Number of Tools Used (Nt) & Time to Change One Tool (tc) and hit the calculate button. Here is how the Total Non-Productive Time using Average Production Cost calculation can be explained with given input values -> 0.015 = (2*(11400-80*69)-(80*3*30)-(3*80))/80.

FAQ

What is Total Non-Productive Time using Average Production Cost?
The Total Non-Productive Time using Average Production Cost refers to the cumulative duration during which the manufacturing process is not actively producing parts. This includes any downtime, setup time, tool changes, maintenance, and other activities that do not directly contribute to the production of components. Understanding and minimizing non-productive time is essential for optimizing production efficiency and reducing overall manufacturing costs and is represented as Tnp = (Nb*(Cpr-Ct*tm)-(Ct*Nt*tc)-(Nt*Ct))/Ct or Non Productive Time = (Batch Size*(Production Cost of Each Component-Cost of a Tool*Machining Time)-(Cost of a Tool*Number of Tools Used*Time to Change One Tool)-(Number of Tools Used*Cost of a Tool))/Cost of a Tool. Batch size refers to the number of identical parts produced in a single production run or cycle, Production cost of each component involves accounting for various factors, including material costs, labor, machine operating costs, tool costs, overhead, and other related expenses, Cost of a tool is a multifaceted consideration that includes the initial purchase price, maintenance costs, tool life, and the impact on overall production costs, Machining time refers to the total time required to complete a specific machining operation on a workpiece, The Number of Tools Used is the total number of tools used for manufacturing a batch of products & Time to change one tool often referred to as tool change time, includes the duration taken to remove the used tool and install a new one.
How to calculate Total Non-Productive Time using Average Production Cost?
The Total Non-Productive Time using Average Production Cost refers to the cumulative duration during which the manufacturing process is not actively producing parts. This includes any downtime, setup time, tool changes, maintenance, and other activities that do not directly contribute to the production of components. Understanding and minimizing non-productive time is essential for optimizing production efficiency and reducing overall manufacturing costs is calculated using Non Productive Time = (Batch Size*(Production Cost of Each Component-Cost of a Tool*Machining Time)-(Cost of a Tool*Number of Tools Used*Time to Change One Tool)-(Number of Tools Used*Cost of a Tool))/Cost of a Tool. To calculate Total Non-Productive Time using Average Production Cost, you need Batch Size (Nb), Production Cost of Each Component (Cpr), Cost of a Tool (Ct), Machining Time (tm), Number of Tools Used (Nt) & Time to Change One Tool (tc). With our tool, you need to enter the respective value for Batch Size, Production Cost of Each Component, Cost of a Tool, Machining Time, Number of Tools Used & Time to Change One Tool and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!