Components Affecting Machining Time
1) Cutting Time: The time required for cutting operations, including roughing, semi-finishing, and finishing cuts.
2) Tool Change Time: The time spent on tool changes, including stopping the machine, changing tools, and calibrating.
3) Setup Time: The duration needed to set up the machine, fixtures, and tooling for each job.
4) Material Handling Time: Time spent loading and unloading workpieces onto the machine.
5) Idle Time: Non-productive time, such as machine warm-up, cool-down, and maintenance.
How to Calculate Total Machining Time using Average Production Cost?
Total Machining Time using Average Production Cost calculator uses Total Machining Time = (Batch Size*(Production Cost of Each Component-Cost of a Tool*Setup Time)-Number of Tools Used*(Cost of a Tool*Time to Change One Tool+Cost of a Tool))/(Cost of a Tool) to calculate the Total Machining Time, The Total Machining Time using Average Production Cost refers to the cumulative duration required to process all components during the manufacturing process. This time encompasses various machining operations, such as cutting, shaping, drilling, and finishing, necessary to transform raw materials into finished products. Total machining time is a crucial parameter in production planning, resource allocation, and cost estimation. Total Machining Time is denoted by Tm symbol.
How to calculate Total Machining Time using Average Production Cost using this online calculator? To use this online calculator for Total Machining Time using Average Production Cost, enter Batch Size (Nb), Production Cost of Each Component (Cpr), Cost of a Tool (Ct), Setup Time (ts), Number of Tools Used (Nt) & Time to Change One Tool (tc) and hit the calculate button. Here is how the Total Machining Time using Average Production Cost calculation can be explained with given input values -> 0.038333 = (2*(11400-80*27)-3*(80*30+80))/(80).