Total Cost of Tools used given Average Production Cost Solution

STEP 0: Pre-Calculation Summary
Formula Used
Total Tool Cost = (Batch Size*(Production Cost of Each Component-Cost of a Tool*(Setup Time+Machining Time))-Cost of a Tool*Number of Tools Used*Time to Change One Tool)
t = (Nb*(Cpr-Ct*(ts+tm))-Ct*Nt*tc)
This formula uses 8 Variables
Variables Used
Total Tool Cost - Total tool cost involves accounting for the purchase price of the tools, their usage rates, and any costs associated with their maintenance and replacement.
Batch Size - Batch size refers to the number of identical parts produced in a single production run or cycle.
Production Cost of Each Component - Production cost of each component involves accounting for various factors, including material costs, labor, machine operating costs, tool costs, overhead, and other related expenses.
Cost of a Tool - Cost of a tool is a multifaceted consideration that includes the initial purchase price, maintenance costs, tool life, and the impact on overall production costs.
Setup Time - (Measured in Second) - Setup Time of each component is the time required to load/unload the workpiece and position the tool for production for one component.
Machining Time - (Measured in Second) - Machining time refers to the total time required to complete a specific machining operation on a workpiece.
Number of Tools Used - The Number of Tools Used is the total number of tools used for manufacturing a batch of products.
Time to Change One Tool - (Measured in Second) - Time to change one tool often referred to as tool change time, includes the duration taken to remove the used tool and install a new one.
STEP 1: Convert Input(s) to Base Unit
Batch Size: 2 --> No Conversion Required
Production Cost of Each Component: 11400 --> No Conversion Required
Cost of a Tool: 80 --> No Conversion Required
Setup Time: 0.45 Minute --> 27 Second (Check conversion ​here)
Machining Time: 1.15 Minute --> 69 Second (Check conversion ​here)
Number of Tools Used: 3 --> No Conversion Required
Time to Change One Tool: 0.5 Minute --> 30 Second (Check conversion ​here)
STEP 2: Evaluate Formula
Substituting Input Values in Formula
t = (Nb*(Cpr-Ct*(ts+tm))-Ct*Nt*tc) --> (2*(11400-80*(27+69))-80*3*30)
Evaluating ... ...
t = 240
STEP 3: Convert Result to Output's Unit
240 --> No Conversion Required
FINAL ANSWER
240 <-- Total Tool Cost
(Calculation completed in 00.004 seconds)

Credits

Creator Image
Created by Kumar Siddhant
Indian Institute of Information Technology, Design and Manufacturing (IIITDM), Jabalpur
Kumar Siddhant has created this Calculator and 400+ more calculators!
Verifier Image
Verified by Parul Keshav
National Institute of Technology (NIT), Srinagar
Parul Keshav has verified this Calculator and 400+ more calculators!

18 Average Production Cost Calculators

Total Non-Productive Time using Average Production Cost
​ Go Non Productive Time = (Batch Size*(Production Cost of Each Component-Cost of a Tool*Machining Time)-(Cost of a Tool*Number of Tools Used*Time to Change One Tool)-(Number of Tools Used*Cost of a Tool))/Cost of a Tool
Machining and Operating Rate given Average Production Cost of each Component
​ Go Machining and Operating Rate = (Production Cost of Each Component-(Number of Tools Used*Cost of a Tool/Batch Size))/(Setup Time+Machining Time+(Number of Tools Used*Tool Changing Time/Batch Size))
Tool Changing Time for Each Tool given Average Production Cost
​ Go Time to Change One Tool = (Batch Size*(Production Cost of Each Component-Cost of a Tool*(Setup Time+Machining Time))-Number of Tools Used*Cost of a Tool)/(Cost of a Tool*Number of Tools Used)
Total Machining Time using Average Production Cost
​ Go Total Machining Time = (Batch Size*(Production Cost of Each Component-Cost of a Tool*Setup Time)-Number of Tools Used*(Cost of a Tool*Time to Change One Tool+Cost of a Tool))/(Cost of a Tool)
Tool Changing Cost of Each Product using Average Production Cost
​ Go Cost of Changing Each Tool = (Batch Size*Production Cost of Each Component-Batch Size*Cost of a Tool*(Setup Time+Machining Time)-Number of Tools Used*Cost of a Tool)/(Number of Tools Used)
Machining Time for Each Product given Average Production Cost
​ Go Machining Time = (Production Cost of Each Component-Cost of a Tool*Setup Time-(Number of Tools Used/Batch Size)*(Cost of a Tool*Time to Change One Tool+Cost of a Tool))/Cost of a Tool
Setup Time for Each Product given Average Production Cost
​ Go Setup Time = (Production Cost of Each Component-Cost of a Tool*Machining Time-(Number of Tools Used/Batch Size)*(Cost of a Tool*Time to Change One Tool+Cost of a Tool))/Cost of a Tool
Total Non-Productive Cost given Average Production Cost
​ Go Total Non Productive Cost = Batch Size*(Production Cost of Each Component-(Cost of a Tool*Machining Time))-(Number of Tools Used*((Cost of a Tool*Tool Changing Time)+Cost of a Tool))
Non-Productive Cost of Component given Average Production Cost
​ Go Non Average Production Cost = Production Cost of Each Component-(Cost of a Tool*Machining Time+(Number of Tools Used/Batch Size)*(Cost of a Tool*Tool Changing Time+Cost of a Tool))
Total Tool Changing Time using Average Production Cost
​ Go Total Tool Changing Time = (Batch Size*(Production Cost of Each Component-Cost of a Tool*(Setup Time+Machining Time))-Number of Tools Used*Cost of a Tool)/(Cost of a Tool)
Total Cost of Tools used given Average Production Cost
​ Go Total Tool Cost = (Batch Size*(Production Cost of Each Component-Cost of a Tool*(Setup Time+Machining Time))-Cost of a Tool*Number of Tools Used*Time to Change One Tool)
Number of Tools used given Average Production Cost
​ Go Number of Tools Used = Batch Size*(Production Cost of Each Component-Cost of a Tool*(Setup Time+Machining Time))/(Cost of a Tool*Time to Change One Tool+Cost of a Tool)
Batch Size given Average Production Cost
​ Go Batch Size = Number of Tools Used*(Cost of a Tool*Time to Change One Tool+Cost of a Tool)/(Production Cost of Each Component-Cost of a Tool*(Setup Time+Machining Time))
Average Production Cost of each component
​ Go Average Production Cost = Cost of a Tool*(Setup Time+Machining Time)+(Number of Tools Used/Batch Size)*((Cost of a Tool*Tool Changing Time)+Cost of a Tool)
Total Tool Changing Cost using Average Production Cost
​ Go Total Tool Changing Cost = Batch Size*(Production Cost of Each Component-Cost of a Tool*(Setup Time+Machining Time))-Number of Tools Used*Cost of a Tool
Average Production Cost of Each Component using Individual Costs
​ Go Production Cost of Each Component = (Total Non Productive Cost+Total Machining And Operating Cost+Total Tool Changing Cost+Total Tool Cost)/Batch Size
Number of Tools used given Average Production Time
​ Go Number of Tools Used = Batch Size*(Average Production Time-(Setup Time+Machining Time))/Time to Change One Tool
Average Production Cost of Each Component Given Total Production Cost
​ Go Production Cost of Each Component = Total Production Cost/Batch Size

Total Cost of Tools used given Average Production Cost Formula

Total Tool Cost = (Batch Size*(Production Cost of Each Component-Cost of a Tool*(Setup Time+Machining Time))-Cost of a Tool*Number of Tools Used*Time to Change One Tool)
t = (Nb*(Cpr-Ct*(ts+tm))-Ct*Nt*tc)

Components of Tool Cost

1) Initial Purchase Cost: The cost to acquire new tools.
2) Tool Wear and Replacement: The cost associated with replacing worn-out tools.
3) Maintenance and Sharpening: Costs for maintaining and sharpening tools to ensure optimal performance.
4)Tool Management: Costs related to the storage, handling, and inventory management of tools.

How to Calculate Total Cost of Tools used given Average Production Cost?

Total Cost of Tools used given Average Production Cost calculator uses Total Tool Cost = (Batch Size*(Production Cost of Each Component-Cost of a Tool*(Setup Time+Machining Time))-Cost of a Tool*Number of Tools Used*Time to Change One Tool) to calculate the Total Tool Cost, The Total Cost of Tools used given Average Production Cost refers to the cumulative expense incurred for all tools required throughout the production process. This cost is a component of the overall manufacturing costs and directly impacts the average production cost per component. Total Tool Cost is denoted by t symbol.

How to calculate Total Cost of Tools used given Average Production Cost using this online calculator? To use this online calculator for Total Cost of Tools used given Average Production Cost, enter Batch Size (Nb), Production Cost of Each Component (Cpr), Cost of a Tool (Ct), Setup Time (ts), Machining Time (tm), Number of Tools Used (Nt) & Time to Change One Tool (tc) and hit the calculate button. Here is how the Total Cost of Tools used given Average Production Cost calculation can be explained with given input values -> 240 = (2*(11400-80*(27+69))-80*3*30).

FAQ

What is Total Cost of Tools used given Average Production Cost?
The Total Cost of Tools used given Average Production Cost refers to the cumulative expense incurred for all tools required throughout the production process. This cost is a component of the overall manufacturing costs and directly impacts the average production cost per component and is represented as t = (Nb*(Cpr-Ct*(ts+tm))-Ct*Nt*tc) or Total Tool Cost = (Batch Size*(Production Cost of Each Component-Cost of a Tool*(Setup Time+Machining Time))-Cost of a Tool*Number of Tools Used*Time to Change One Tool). Batch size refers to the number of identical parts produced in a single production run or cycle, Production cost of each component involves accounting for various factors, including material costs, labor, machine operating costs, tool costs, overhead, and other related expenses, Cost of a tool is a multifaceted consideration that includes the initial purchase price, maintenance costs, tool life, and the impact on overall production costs, Setup Time of each component is the time required to load/unload the workpiece and position the tool for production for one component, Machining time refers to the total time required to complete a specific machining operation on a workpiece, The Number of Tools Used is the total number of tools used for manufacturing a batch of products & Time to change one tool often referred to as tool change time, includes the duration taken to remove the used tool and install a new one.
How to calculate Total Cost of Tools used given Average Production Cost?
The Total Cost of Tools used given Average Production Cost refers to the cumulative expense incurred for all tools required throughout the production process. This cost is a component of the overall manufacturing costs and directly impacts the average production cost per component is calculated using Total Tool Cost = (Batch Size*(Production Cost of Each Component-Cost of a Tool*(Setup Time+Machining Time))-Cost of a Tool*Number of Tools Used*Time to Change One Tool). To calculate Total Cost of Tools used given Average Production Cost, you need Batch Size (Nb), Production Cost of Each Component (Cpr), Cost of a Tool (Ct), Setup Time (ts), Machining Time (tm), Number of Tools Used (Nt) & Time to Change One Tool (tc). With our tool, you need to enter the respective value for Batch Size, Production Cost of Each Component, Cost of a Tool, Setup Time, Machining Time, Number of Tools Used & Time to Change One Tool and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!