Total Applied Hydraulic Loading Rate Solution

STEP 0: Pre-Calculation Summary
Formula Used
Total Applied Hydraulic Loading Rate = (Influent Wastewater Hydraulic Loading Rate+Recycle Flow Hydraulic Loading Rate)
QT = (Q+QR)
This formula uses 3 Variables
Variables Used
Total Applied Hydraulic Loading Rate - (Measured in Meter per Second) - The Total Applied Hydraulic Loading Rate refers to the rate at which water is applied to a treatment system or filtration area, typically measured in cubic meters per square meter per day.
Influent Wastewater Hydraulic Loading Rate - (Measured in Meter per Second) - The Influent Wastewater Hydraulic Loading Rate refers to the volume of wastewater applied per unit area of a treatment system per day, typically measured in m²/day).
Recycle Flow Hydraulic Loading Rate - (Measured in Meter per Second) - The Recycle Flow Hydraulic Loading Rate refers to the volume of recycled water applied per unit area of a system per day, typically measured in m³/m²/day.
STEP 1: Convert Input(s) to Base Unit
Influent Wastewater Hydraulic Loading Rate: 6.5 Meter per Second --> 6.5 Meter per Second No Conversion Required
Recycle Flow Hydraulic Loading Rate: 5.5 Meter per Second --> 5.5 Meter per Second No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
QT = (Q+QR) --> (6.5+5.5)
Evaluating ... ...
QT = 12
STEP 3: Convert Result to Output's Unit
12 Meter per Second --> No Conversion Required
FINAL ANSWER
12 Meter per Second <-- Total Applied Hydraulic Loading Rate
(Calculation completed in 00.004 seconds)

Credits

Creator Image
Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2100+ more calculators!
Verifier Image
Verified by Ishita Goyal
Meerut Institute of Engineering and Technology (MIET), Meerut
Ishita Goyal has verified this Calculator and 2600+ more calculators!

Hydraulic Loading Rate Calculators

Influent Wastewater Hydraulic Loading Rate given Total Hydraulic Loading Rate
​ LaTeX ​ Go Influent Wastewater Hydraulic Loading Rate = (Total Applied Hydraulic Loading Rate-Recycle Flow Hydraulic Loading Rate)
Recycle Flow Hydraulic Loading Rate given Total Hydraulic Loading Rate
​ LaTeX ​ Go Recycle Flow Hydraulic Loading Rate = (Total Applied Hydraulic Loading Rate-Influent Wastewater Hydraulic Loading Rate)
Total Applied Hydraulic Loading Rate
​ LaTeX ​ Go Total Applied Hydraulic Loading Rate = (Influent Wastewater Hydraulic Loading Rate+Recycle Flow Hydraulic Loading Rate)
Hydraulic Loading of Filter
​ LaTeX ​ Go Hydraulic Loading = Volumetric Flow Rate/Area of Filter

Total Applied Hydraulic Loading Rate Formula

​LaTeX ​Go
Total Applied Hydraulic Loading Rate = (Influent Wastewater Hydraulic Loading Rate+Recycle Flow Hydraulic Loading Rate)
QT = (Q+QR)

What is Hydraulic Loading ?

Hydraulic loading is defined in a wastewater treatment process unit as the volume of wastewater applied to the surface of the process unit per time period. It is often expressed in gallons per day per square foot (gpd/ft2).

How to Calculate Total Applied Hydraulic Loading Rate?

Total Applied Hydraulic Loading Rate calculator uses Total Applied Hydraulic Loading Rate = (Influent Wastewater Hydraulic Loading Rate+Recycle Flow Hydraulic Loading Rate) to calculate the Total Applied Hydraulic Loading Rate, The Total Applied Hydraulic Loading Rate is defined as the combined volume of fluid applied to a treatment system per unit area per unit time, in m³/m²/day. Total Applied Hydraulic Loading Rate is denoted by QT symbol.

How to calculate Total Applied Hydraulic Loading Rate using this online calculator? To use this online calculator for Total Applied Hydraulic Loading Rate, enter Influent Wastewater Hydraulic Loading Rate (Q) & Recycle Flow Hydraulic Loading Rate (QR) and hit the calculate button. Here is how the Total Applied Hydraulic Loading Rate calculation can be explained with given input values -> 9.5 = (6.5+recycle_flow_hydraulic_loading_rate).

FAQ

What is Total Applied Hydraulic Loading Rate?
The Total Applied Hydraulic Loading Rate is defined as the combined volume of fluid applied to a treatment system per unit area per unit time, in m³/m²/day and is represented as QT = (Q+QR) or Total Applied Hydraulic Loading Rate = (Influent Wastewater Hydraulic Loading Rate+Recycle Flow Hydraulic Loading Rate). The Influent Wastewater Hydraulic Loading Rate refers to the volume of wastewater applied per unit area of a treatment system per day, typically measured in m²/day) & The Recycle Flow Hydraulic Loading Rate refers to the volume of recycled water applied per unit area of a system per day, typically measured in m³/m²/day.
How to calculate Total Applied Hydraulic Loading Rate?
The Total Applied Hydraulic Loading Rate is defined as the combined volume of fluid applied to a treatment system per unit area per unit time, in m³/m²/day is calculated using Total Applied Hydraulic Loading Rate = (Influent Wastewater Hydraulic Loading Rate+Recycle Flow Hydraulic Loading Rate). To calculate Total Applied Hydraulic Loading Rate, you need Influent Wastewater Hydraulic Loading Rate (Q) & Recycle Flow Hydraulic Loading Rate (QR). With our tool, you need to enter the respective value for Influent Wastewater Hydraulic Loading Rate & Recycle Flow Hydraulic Loading Rate and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!