Tool Changing Time for Each Tool given Average Production Cost Solution

STEP 0: Pre-Calculation Summary
Formula Used
Time to Change One Tool = (Batch Size*(Production Cost of Each Component-Cost of a Tool*(Setup Time+Machining Time))-Number of Tools Used*Cost of a Tool)/(Cost of a Tool*Number of Tools Used)
tc = (Nb*(Cpr-Ct*(ts+tm))-Nt*Ct)/(Ct*Nt)
This formula uses 7 Variables
Variables Used
Time to Change One Tool - (Measured in Second) - Time to change one tool often referred to as tool change time, includes the duration taken to remove the used tool and install a new one.
Batch Size - Batch size refers to the number of identical parts produced in a single production run or cycle.
Production Cost of Each Component - Production cost of each component involves accounting for various factors, including material costs, labor, machine operating costs, tool costs, overhead, and other related expenses.
Cost of a Tool - Cost of a tool is a multifaceted consideration that includes the initial purchase price, maintenance costs, tool life, and the impact on overall production costs.
Setup Time - (Measured in Second) - Setup Time of each component is the time required to load/unload the workpiece and position the tool for production for one component.
Machining Time - (Measured in Second) - Machining time refers to the total time required to complete a specific machining operation on a workpiece.
Number of Tools Used - The Number of Tools Used is the total number of tools used for manufacturing a batch of products.
STEP 1: Convert Input(s) to Base Unit
Batch Size: 2 --> No Conversion Required
Production Cost of Each Component: 11400 --> No Conversion Required
Cost of a Tool: 80 --> No Conversion Required
Setup Time: 0.45 Minute --> 27 Second (Check conversion ​here)
Machining Time: 1.15 Minute --> 69 Second (Check conversion ​here)
Number of Tools Used: 3 --> No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
tc = (Nb*(Cpr-Ct*(ts+tm))-Nt*Ct)/(Ct*Nt) --> (2*(11400-80*(27+69))-3*80)/(80*3)
Evaluating ... ...
tc = 30
STEP 3: Convert Result to Output's Unit
30 Second -->0.5 Minute (Check conversion ​here)
FINAL ANSWER
0.5 Minute <-- Time to Change One Tool
(Calculation completed in 00.004 seconds)

Credits

Creator Image
Created by Kumar Siddhant
Indian Institute of Information Technology, Design and Manufacturing (IIITDM), Jabalpur
Kumar Siddhant has created this Calculator and 400+ more calculators!
Verifier Image
Verified by Parul Keshav
National Institute of Technology (NIT), Srinagar
Parul Keshav has verified this Calculator and 400+ more calculators!

Average Production Cost Calculators

Total Non-Productive Time using Average Production Cost
​ LaTeX ​ Go Non Productive Time = (Batch Size*(Production Cost of Each Component-Cost of a Tool*Machining Time)-(Cost of a Tool*Number of Tools Used*Time to Change One Tool)-(Number of Tools Used*Cost of a Tool))/Cost of a Tool
Setup Time for Each Product given Average Production Cost
​ LaTeX ​ Go Setup Time = (Production Cost of Each Component-Cost of a Tool*Machining Time-(Number of Tools Used/Batch Size)*(Cost of a Tool*Time to Change One Tool+Cost of a Tool))/Cost of a Tool
Number of Tools used given Average Production Cost
​ LaTeX ​ Go Number of Tools Used = Batch Size*(Production Cost of Each Component-Cost of a Tool*(Setup Time+Machining Time))/(Cost of a Tool*Time to Change One Tool+Cost of a Tool)
Number of Tools used given Average Production Time
​ LaTeX ​ Go Number of Tools Used = Batch Size*(Average Production Time-(Setup Time+Machining Time))/Time to Change One Tool

Tool Changing Time for Each Tool given Average Production Cost Formula

​LaTeX ​Go
Time to Change One Tool = (Batch Size*(Production Cost of Each Component-Cost of a Tool*(Setup Time+Machining Time))-Number of Tools Used*Cost of a Tool)/(Cost of a Tool*Number of Tools Used)
tc = (Nb*(Cpr-Ct*(ts+tm))-Nt*Ct)/(Ct*Nt)

Components of Tool Changing Time

1) Stopping the Machine: Time taken to safely stop the machine and prepare it for tool change.
2) Removing the Old Tool: Time required to remove the worn-out or used tool.
3) Installing the New Tool: Time taken to install the new tool into the machine.
4) Calibration and Setup: Time for calibrating the machine and setting it up for the new tool.
5) Quality Checks: Time for performing quality checks to ensure the new tool is correctly installed and producing parts within specifications.

How to Calculate Tool Changing Time for Each Tool given Average Production Cost?

Tool Changing Time for Each Tool given Average Production Cost calculator uses Time to Change One Tool = (Batch Size*(Production Cost of Each Component-Cost of a Tool*(Setup Time+Machining Time))-Number of Tools Used*Cost of a Tool)/(Cost of a Tool*Number of Tools Used) to calculate the Time to Change One Tool, Tool Changing Time for Each Tool given Average Production Cost refers to the duration required to replace a tool in a machine during the manufacturing process. This includes the time taken to stop the machine, remove the old tool, install the new tool, calibrate or set up the machine for the new tool, and perform any necessary quality checks to ensure the machine is ready for production. Time to Change One Tool is denoted by tc symbol.

How to calculate Tool Changing Time for Each Tool given Average Production Cost using this online calculator? To use this online calculator for Tool Changing Time for Each Tool given Average Production Cost, enter Batch Size (Nb), Production Cost of Each Component (Cpr), Cost of a Tool (Ct), Setup Time (ts), Machining Time (tm) & Number of Tools Used (Nt) and hit the calculate button. Here is how the Tool Changing Time for Each Tool given Average Production Cost calculation can be explained with given input values -> 0.008333 = (2*(11400-80*(27+69))-3*80)/(80*3).

FAQ

What is Tool Changing Time for Each Tool given Average Production Cost?
Tool Changing Time for Each Tool given Average Production Cost refers to the duration required to replace a tool in a machine during the manufacturing process. This includes the time taken to stop the machine, remove the old tool, install the new tool, calibrate or set up the machine for the new tool, and perform any necessary quality checks to ensure the machine is ready for production and is represented as tc = (Nb*(Cpr-Ct*(ts+tm))-Nt*Ct)/(Ct*Nt) or Time to Change One Tool = (Batch Size*(Production Cost of Each Component-Cost of a Tool*(Setup Time+Machining Time))-Number of Tools Used*Cost of a Tool)/(Cost of a Tool*Number of Tools Used). Batch size refers to the number of identical parts produced in a single production run or cycle, Production cost of each component involves accounting for various factors, including material costs, labor, machine operating costs, tool costs, overhead, and other related expenses, Cost of a tool is a multifaceted consideration that includes the initial purchase price, maintenance costs, tool life, and the impact on overall production costs, Setup Time of each component is the time required to load/unload the workpiece and position the tool for production for one component, Machining time refers to the total time required to complete a specific machining operation on a workpiece & The Number of Tools Used is the total number of tools used for manufacturing a batch of products.
How to calculate Tool Changing Time for Each Tool given Average Production Cost?
Tool Changing Time for Each Tool given Average Production Cost refers to the duration required to replace a tool in a machine during the manufacturing process. This includes the time taken to stop the machine, remove the old tool, install the new tool, calibrate or set up the machine for the new tool, and perform any necessary quality checks to ensure the machine is ready for production is calculated using Time to Change One Tool = (Batch Size*(Production Cost of Each Component-Cost of a Tool*(Setup Time+Machining Time))-Number of Tools Used*Cost of a Tool)/(Cost of a Tool*Number of Tools Used). To calculate Tool Changing Time for Each Tool given Average Production Cost, you need Batch Size (Nb), Production Cost of Each Component (Cpr), Cost of a Tool (Ct), Setup Time (ts), Machining Time (tm) & Number of Tools Used (Nt). With our tool, you need to enter the respective value for Batch Size, Production Cost of Each Component, Cost of a Tool, Setup Time, Machining Time & Number of Tools Used and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!