Standard Effective Duration given Modified Basin Lag Solution

STEP 0: Pre-Calculation Summary
Formula Used
Standard Duration of Effective Rainfall = -(4*(Modified Basin Lag-Basin Lag)-Non-standard rainfall duration)
tr = -(4*(t'p-tp)-tR)
This formula uses 4 Variables
Variables Used
Standard Duration of Effective Rainfall - (Measured in Second) - Standard Duration of Effective Rainfall as adopted by Snyder.
Modified Basin Lag - (Measured in Second) - Modified Basin Lag for an effective duration rainfall.
Basin Lag - (Measured in Second) - Basin Lag is the elapsed time between the occurrences of the centroids of the effective rainfall.
Non-standard rainfall duration - (Measured in Second) - Non-standard rainfall duration to derive modified basin lag.
STEP 1: Convert Input(s) to Base Unit
Modified Basin Lag: 6.22 Hour --> 22392 Second (Check conversion ​here)
Basin Lag: 6 Hour --> 21600 Second (Check conversion ​here)
Non-standard rainfall duration: 2 Hour --> 7200 Second (Check conversion ​here)
STEP 2: Evaluate Formula
Substituting Input Values in Formula
tr = -(4*(t'p-tp)-tR) --> -(4*(22392-21600)-7200)
Evaluating ... ...
tr = 4032
STEP 3: Convert Result to Output's Unit
4032 Second -->1.12 Hour (Check conversion ​here)
FINAL ANSWER
1.12 Hour <-- Standard Duration of Effective Rainfall
(Calculation completed in 00.004 seconds)

Credits

Creator Image
Created by Mithila Muthamma PA
Coorg Institute of Technology (CIT), Coorg
Mithila Muthamma PA has created this Calculator and 2000+ more calculators!
Verifier Image
Verified by Chandana P Dev
NSS College of Engineering (NSSCE), Palakkad
Chandana P Dev has verified this Calculator and 1700+ more calculators!

Synder's Synthetic Unit Hydrograph Calculators

Regional Constant given Peak Discharge for Nonstandard Effective Rainfall
​ LaTeX ​ Go Regional Constant (Snyder) = Peak Discharge*Modified Basin Lag/(2.78*Area of Catchment)
Peak Discharge for Nonstandard Effective Rainfall
​ LaTeX ​ Go Peak Discharge = 2.78*Regional Constant (Snyder)*Area of Catchment/Modified Basin Lag
Catchment Area given Peak Discharge for Nonstandard Effective Rainfall
​ LaTeX ​ Go Area of Catchment = Peak Discharge*Modified Basin Lag/(2.78*Regional Constant)
Modified Basin Lag given Peak Discharge for Nonstandard Effective Rainfall
​ LaTeX ​ Go Modified Basin Lag = 2.78*Regional Constant*Area of Catchment/Peak Discharge

Standard Effective Duration given Modified Basin Lag Formula

​LaTeX ​Go
Standard Duration of Effective Rainfall = -(4*(Modified Basin Lag-Basin Lag)-Non-standard rainfall duration)
tr = -(4*(t'p-tp)-tR)

What is Lag Time in hydrology?

The lag time is the delay between the maximum rainfall amount and the peak discharge. The shape of a hydrograph varies in each river basin and each storm event. This increases lag time. The peak discharge is also lower as it takes water longer to reach the river channel.

What is Baseflow?

Baseflow is a portion of streamflow that is not directly generated from the excess rainfall during a storm event. In other words, this is the flow that would exist in the stream without the contribution of direct runoff from the rainfall.

How to Calculate Standard Effective Duration given Modified Basin Lag?

Standard Effective Duration given Modified Basin Lag calculator uses Standard Duration of Effective Rainfall = -(4*(Modified Basin Lag-Basin Lag)-Non-standard rainfall duration) to calculate the Standard Duration of Effective Rainfall, The Standard Effective Duration given Modified Basin Lag formula is defined as the time interval of precipitation to be equal to the difference between total rainfall and actual evapotranspiration. Standard Duration of Effective Rainfall is denoted by tr symbol.

How to calculate Standard Effective Duration given Modified Basin Lag using this online calculator? To use this online calculator for Standard Effective Duration given Modified Basin Lag, enter Modified Basin Lag (t'p), Basin Lag (tp) & Non-standard rainfall duration (tR) and hit the calculate button. Here is how the Standard Effective Duration given Modified Basin Lag calculation can be explained with given input values -> 0.000311 = -(4*(22392-21600)-7200).

FAQ

What is Standard Effective Duration given Modified Basin Lag?
The Standard Effective Duration given Modified Basin Lag formula is defined as the time interval of precipitation to be equal to the difference between total rainfall and actual evapotranspiration and is represented as tr = -(4*(t'p-tp)-tR) or Standard Duration of Effective Rainfall = -(4*(Modified Basin Lag-Basin Lag)-Non-standard rainfall duration). Modified Basin Lag for an effective duration rainfall, Basin Lag is the elapsed time between the occurrences of the centroids of the effective rainfall & Non-standard rainfall duration to derive modified basin lag.
How to calculate Standard Effective Duration given Modified Basin Lag?
The Standard Effective Duration given Modified Basin Lag formula is defined as the time interval of precipitation to be equal to the difference between total rainfall and actual evapotranspiration is calculated using Standard Duration of Effective Rainfall = -(4*(Modified Basin Lag-Basin Lag)-Non-standard rainfall duration). To calculate Standard Effective Duration given Modified Basin Lag, you need Modified Basin Lag (t'p), Basin Lag (tp) & Non-standard rainfall duration (tR). With our tool, you need to enter the respective value for Modified Basin Lag, Basin Lag & Non-standard rainfall duration and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
How many ways are there to calculate Standard Duration of Effective Rainfall?
In this formula, Standard Duration of Effective Rainfall uses Modified Basin Lag, Basin Lag & Non-standard rainfall duration. We can use 2 other way(s) to calculate the same, which is/are as follows -
  • Standard Duration of Effective Rainfall = Basin Lag/5.5
  • Standard Duration of Effective Rainfall = Non-standard rainfall duration-4*(Modified Basin Lag-Basin Lag)
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!