Sludge Feed Rate using Dewatered Sludge Discharge Rate Solution

STEP 0: Pre-Calculation Summary
Formula Used
Sludge Feed Rate = Cake Discharge Rate/Solid Recovery in Decimal
Sf = Cd/R
This formula uses 3 Variables
Variables Used
Sludge Feed Rate - (Measured in Kilogram per Second) - Sludge Feed Rate refers to the rate at which sludge is introduced into a treatment process.
Cake Discharge Rate - (Measured in Kilogram per Second) - Cake Discharge Rate is a measure of the quantity of dry solid flow over unit time.
Solid Recovery in Decimal - Solid Recovery in Decimal refers to the percentage of solid material that is recovered from a process or system designed to separate solids from a mixture.
STEP 1: Convert Input(s) to Base Unit
Cake Discharge Rate: 27 Pound per Hour --> 0.00340194277507527 Kilogram per Second (Check conversion ​here)
Solid Recovery in Decimal: 0.6 --> No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
Sf = Cd/R --> 0.00340194277507527/0.6
Evaluating ... ...
Sf = 0.00566990462512545
STEP 3: Convert Result to Output's Unit
0.00566990462512545 Kilogram per Second -->45.0000000000001 Pound per Hour (Check conversion ​here)
FINAL ANSWER
45.0000000000001 45 Pound per Hour <-- Sludge Feed Rate
(Calculation completed in 00.007 seconds)

Credits

Creator Image
Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2100+ more calculators!
Verifier Image
Verified by Ishita Goyal
Meerut Institute of Engineering and Technology (MIET), Meerut
Ishita Goyal has verified this Calculator and 2600+ more calculators!

Sludge Volume and Feed Rate Calculators

Digested Sludge using Sludge Feed Rate for Dewatering Facility
​ LaTeX ​ Go Digested Sludge = (Volumetric Sludge Feed Rate*Operation Time)
Sludge Feed Rate for Dewatering Facility
​ LaTeX ​ Go Volumetric Sludge Feed Rate = (Digested Sludge/Operation Time)
Sludge Volume-in given Percent Reduction in Sludge Volume
​ LaTeX ​ Go Sludge Volume in = (Sludge Volume Out/(1-Volume Reduction))
Sludge Volume-out given Percent Reduction in Sludge Volume
​ LaTeX ​ Go Sludge Volume Out = Sludge Volume in*(1-Volume Reduction)

Sludge Feed Rate using Dewatered Sludge Discharge Rate Formula

​LaTeX ​Go
Sludge Feed Rate = Cake Discharge Rate/Solid Recovery in Decimal
Sf = Cd/R

What is Sludge Feed Rate ?

The Sludge Feed Rate relates to the daily wastewater load (kg BOD / d) and the available sludge mass. The sludge loading rate is, in addition to the sludge retention time, the main design variable of an activated sludge plant.

How to Calculate Sludge Feed Rate using Dewatered Sludge Discharge Rate?

Sludge Feed Rate using Dewatered Sludge Discharge Rate calculator uses Sludge Feed Rate = Cake Discharge Rate/Solid Recovery in Decimal to calculate the Sludge Feed Rate, The Sludge Feed Rate using Dewatered Sludge Discharge Rate is defined as the daily wastewater load and the available sludge mass, calculated using dewatered sludge rate. Sludge Feed Rate is denoted by Sf symbol.

How to calculate Sludge Feed Rate using Dewatered Sludge Discharge Rate using this online calculator? To use this online calculator for Sludge Feed Rate using Dewatered Sludge Discharge Rate, enter Cake Discharge Rate (Cd) & Solid Recovery in Decimal (R) and hit the calculate button. Here is how the Sludge Feed Rate using Dewatered Sludge Discharge Rate calculation can be explained with given input values -> 357148.9 = 0.00340194277507527/0.6.

FAQ

What is Sludge Feed Rate using Dewatered Sludge Discharge Rate?
The Sludge Feed Rate using Dewatered Sludge Discharge Rate is defined as the daily wastewater load and the available sludge mass, calculated using dewatered sludge rate and is represented as Sf = Cd/R or Sludge Feed Rate = Cake Discharge Rate/Solid Recovery in Decimal. Cake Discharge Rate is a measure of the quantity of dry solid flow over unit time & Solid Recovery in Decimal refers to the percentage of solid material that is recovered from a process or system designed to separate solids from a mixture.
How to calculate Sludge Feed Rate using Dewatered Sludge Discharge Rate?
The Sludge Feed Rate using Dewatered Sludge Discharge Rate is defined as the daily wastewater load and the available sludge mass, calculated using dewatered sludge rate is calculated using Sludge Feed Rate = Cake Discharge Rate/Solid Recovery in Decimal. To calculate Sludge Feed Rate using Dewatered Sludge Discharge Rate, you need Cake Discharge Rate (Cd) & Solid Recovery in Decimal (R). With our tool, you need to enter the respective value for Cake Discharge Rate & Solid Recovery in Decimal and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!