How to Calculate Setup Time for Each Product given Total Production Cost?
Setup Time for Each Product given Total Production Cost calculator uses Setup Time = (Total Production Cost-Cost of a Tool*Batch Size*Machining Time-Number of Tools Used*(Cost of a Tool*Time to Change One Tool+Cost of a Tool))/(Cost of a Tool*Batch Size) to calculate the Setup Time, The Setup Time for Each Product given Total Production Cost is a method to determine the maximum time that can be spent to load/unload the workpiece and reposition the tool for the manufacturing of a single product based on the total production cost. Setup Time is denoted by ts symbol.
How to calculate Setup Time for Each Product given Total Production Cost using this online calculator? To use this online calculator for Setup Time for Each Product given Total Production Cost, enter Total Production Cost (Ctp), Cost of a Tool (C), Batch Size (N), Machining Time (t), Number of Tools Used (Nt) & Time to Change One Tool (tc) and hit the calculate button. Here is how the Setup Time for Each Product given Total Production Cost calculation can be explained with given input values -> 54 = (30000-80*2*87-3*(80*30+80))/(80*2).