S-Curve Addition Solution

STEP 0: Pre-Calculation Summary
Formula Used
S-Curve Addition = S-Curve at Time 't'-Ordinates of Unit Hydrograph
StD = St-Ut
This formula uses 3 Variables
Variables Used
S-Curve Addition - (Measured in Hour) - S-Curve Addition is a method or concept related to the analysis and interpretation of pumping test data and used for the construction of S-curve.
S-Curve at Time 't' - (Measured in Hour) - S-Curve at Time 't' is the cumulative drawdown or recovery of groundwater levels over a period, typically due to pumping from wells or injection activities.
Ordinates of Unit Hydrograph - (Measured in Hour) - Ordinates of Unit Hydrograph is the runoff discharge values over time after a unit input of effective rainfall. These values typically show how runoff responds and peaks after a storm event.
STEP 1: Convert Input(s) to Base Unit
S-Curve at Time 't': 28 Hour --> 28 Hour No Conversion Required
Ordinates of Unit Hydrograph: 4 Hour --> 4 Hour No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
StD = St-Ut --> 28-4
Evaluating ... ...
StD = 24
STEP 3: Convert Result to Output's Unit
86400 Second -->24 Hour (Check conversion ​here)
FINAL ANSWER
24 Hour <-- S-Curve Addition
(Calculation completed in 00.020 seconds)

Credits

Creator Image
Created by Mithila Muthamma PA
Coorg Institute of Technology (CIT), Coorg
Mithila Muthamma PA has created this Calculator and 2000+ more calculators!
Verifier Image
Verified by Chandana P Dev
NSS College of Engineering (NSSCE), Palakkad
Chandana P Dev has verified this Calculator and 1700+ more calculators!

The S Curve Calculators

Equilibrium Discharge from S Curve
​ LaTeX ​ Go Equilibrium Discharge = (Area of Catchment/Excess Rainfall Time)*10^4
Ordinates of Unit Hydrograph for S-Curve at Certain Time
​ LaTeX ​ Go Ordinates of Unit Hydrograph = S-Curve at Time 't'-S-Curve Addition
S Curve at any time
​ LaTeX ​ Go S-Curve at Time 't' = Ordinates of Unit Hydrograph+S-Curve Addition
S-Curve Addition
​ LaTeX ​ Go S-Curve Addition = S-Curve at Time 't'-Ordinates of Unit Hydrograph

S-Curve Addition Formula

​LaTeX ​Go
S-Curve Addition = S-Curve at Time 't'-Ordinates of Unit Hydrograph
StD = St-Ut

What is S-curve method in Hydrograph?

The S-curve is a method of deriving a unit hydrograph for a desired duration from one or another duration through the use of an S-curve. It is a graph showing the summation of the ordinates of a series of unit hydrographs spaced at unit-rainfall duration intervals. It represents the hydrograph of the unit rate of rainfall excess continued indefinitely.

What is meant by Unit Hydrograph?

A unit hydrograph is a direct runoff hydrograph resulting from one unit (one inch or one cm) of constant intensity uniform rainfall occurring over the entire watershed. The role of unit hydrograph in hydrology is to provide an estimate of direct runoff hydrograph resulting from a given excess rainfall hyetograph.

How to Calculate S-Curve Addition?

S-Curve Addition calculator uses S-Curve Addition = S-Curve at Time 't'-Ordinates of Unit Hydrograph to calculate the S-Curve Addition, The S-Curve Addition formula is defined as the summation of the ordinate of the D-h Unit hydrograph at time 't' equalizes the ordinate of the S-curve at any time t. S-Curve Addition is denoted by StD symbol.

How to calculate S-Curve Addition using this online calculator? To use this online calculator for S-Curve Addition, enter S-Curve at Time 't' (St) & Ordinates of Unit Hydrograph (Ut) and hit the calculate button. Here is how the S-Curve Addition calculation can be explained with given input values -> 0.006667 = 100800-14400.

FAQ

What is S-Curve Addition?
The S-Curve Addition formula is defined as the summation of the ordinate of the D-h Unit hydrograph at time 't' equalizes the ordinate of the S-curve at any time t and is represented as StD = St-Ut or S-Curve Addition = S-Curve at Time 't'-Ordinates of Unit Hydrograph. S-Curve at Time 't' is the cumulative drawdown or recovery of groundwater levels over a period, typically due to pumping from wells or injection activities & Ordinates of Unit Hydrograph is the runoff discharge values over time after a unit input of effective rainfall. These values typically show how runoff responds and peaks after a storm event.
How to calculate S-Curve Addition?
The S-Curve Addition formula is defined as the summation of the ordinate of the D-h Unit hydrograph at time 't' equalizes the ordinate of the S-curve at any time t is calculated using S-Curve Addition = S-Curve at Time 't'-Ordinates of Unit Hydrograph. To calculate S-Curve Addition, you need S-Curve at Time 't' (St) & Ordinates of Unit Hydrograph (Ut). With our tool, you need to enter the respective value for S-Curve at Time 't' & Ordinates of Unit Hydrograph and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!