Runoff Coefficient for Peak Rate of Runoff Solution

STEP 0: Pre-Calculation Summary
Formula Used
Runoff Coefficient for Burkli Zeigler = (455*Peak Rate of Runoff for Burkli Zeigler)/(Intensity of Rainfall in Burkli Zeigler*sqrt(Slope of the ground*Drainage Area))
K' = (455*QBZ)/(IBZ*sqrt(So*AD))
This formula uses 1 Functions, 5 Variables
Functions Used
sqrt - A square root function is a function that takes a non-negative number as an input and returns the square root of the given input number., sqrt(Number)
Variables Used
Runoff Coefficient for Burkli Zeigler - Runoff Coefficient for Burkli Zeigler is a dimensionless coefficient relating the amount of runoff to the amount of precipitation received.
Peak Rate of Runoff for Burkli Zeigler - (Measured in Cubic Meter per Second) - Peak Rate of Runoff for Burkli Zeigler is the maximum rate of discharge during the period of runoff caused by a storm.
Intensity of Rainfall in Burkli Zeigler - (Measured in Meter per Second) - Intensity of Rainfall in Burkli Zeigler refers to the amount of rain that falls over a specific period, usually measured in millimeters per hour (mm/hr) or inches per hour.
Slope of the ground - Slope of the ground is defined in terms of meter per unit thousands of meter.
Drainage Area - (Measured in Square Meter) - Drainage Area is the total surface area, where the water from rain which is not absorbed into the ground flows over the ground surface, back into streams, to finally reach that point.
STEP 1: Convert Input(s) to Base Unit
Peak Rate of Runoff for Burkli Zeigler: 1.34 Cubic Meter per Second --> 1.34 Cubic Meter per Second No Conversion Required
Intensity of Rainfall in Burkli Zeigler: 7.5 Centimeter per Hour --> 2.08333333333333E-05 Meter per Second (Check conversion ​here)
Slope of the ground: 0.045 --> No Conversion Required
Drainage Area: 30 Hectare --> 300000 Square Meter (Check conversion ​here)
STEP 2: Evaluate Formula
Substituting Input Values in Formula
K' = (455*QBZ)/(IBZ*sqrt(So*AD)) --> (455*1.34)/(2.08333333333333E-05*sqrt(0.045*300000))
Evaluating ... ...
K' = 251878.180926151
STEP 3: Convert Result to Output's Unit
251878.180926151 --> No Conversion Required
FINAL ANSWER
251878.180926151 251878.2 <-- Runoff Coefficient for Burkli Zeigler
(Calculation completed in 00.004 seconds)

Credits

Creator Image
Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2100+ more calculators!
Verifier Image
Verified by Ishita Goyal
Meerut Institute of Engineering and Technology (MIET), Meerut
Ishita Goyal has verified this Calculator and 2600+ more calculators!

Burkli Ziegler Formula Calculators

Peak Rate of Runoff from Burkli-Ziegler Formula
​ LaTeX ​ Go Peak Rate of Runoff for Burkli Zeigler = ((Runoff Coefficient for Burkli Zeigler*Intensity of Rainfall in Burkli Zeigler*Drainage Area)/455)*sqrt(Slope of the ground/Drainage Area)
Drainage Area for Peak Rate of Runoff
​ LaTeX ​ Go Drainage Area = ((Peak Rate of Runoff for Burkli Zeigler*455)/(Runoff Coefficient for Burkli Zeigler*Intensity of Rainfall in Burkli Zeigler*sqrt(Slope of the ground)))^2
Runoff Coefficient for Peak Rate of Runoff
​ LaTeX ​ Go Runoff Coefficient for Burkli Zeigler = (455*Peak Rate of Runoff for Burkli Zeigler)/(Intensity of Rainfall in Burkli Zeigler*sqrt(Slope of the ground*Drainage Area))
Maximum Rainfall Intensity given Peak Rate of Runoff
​ LaTeX ​ Go Intensity of Rainfall in Burkli Zeigler = 455*Peak Rate of Runoff for Burkli Zeigler/(Runoff Coefficient for Burkli Zeigler*sqrt(Slope of the ground*Drainage Area))

Runoff Coefficient for Peak Rate of Runoff Formula

​LaTeX ​Go
Runoff Coefficient for Burkli Zeigler = (455*Peak Rate of Runoff for Burkli Zeigler)/(Intensity of Rainfall in Burkli Zeigler*sqrt(Slope of the ground*Drainage Area))
K' = (455*QBZ)/(IBZ*sqrt(So*AD))

What is Runoff Coefficient ?

The Runoff Coefficient K is a dimension less coefficient relating the amount of runoff to the amount of precipitation received. It is a larger value for areas with low infiltration and high runoff (pavement, steep gradient), and lower for permeable, well vegetated areas (forest, flat land).

How to Calculate Runoff Coefficient for Peak Rate of Runoff?

Runoff Coefficient for Peak Rate of Runoff calculator uses Runoff Coefficient for Burkli Zeigler = (455*Peak Rate of Runoff for Burkli Zeigler)/(Intensity of Rainfall in Burkli Zeigler*sqrt(Slope of the ground*Drainage Area)) to calculate the Runoff Coefficient for Burkli Zeigler, The Runoff Coefficient for Peak Rate of Runoff formula is defined as the dimension less coefficient relating the amount of runoff to the amount of precipitation received. Runoff Coefficient for Burkli Zeigler is denoted by K' symbol.

How to calculate Runoff Coefficient for Peak Rate of Runoff using this online calculator? To use this online calculator for Runoff Coefficient for Peak Rate of Runoff, enter Peak Rate of Runoff for Burkli Zeigler (QBZ), Intensity of Rainfall in Burkli Zeigler (IBZ), Slope of the ground (So) & Drainage Area (AD) and hit the calculate button. Here is how the Runoff Coefficient for Peak Rate of Runoff calculation can be explained with given input values -> 251878.2 = (455*1.34)/(2.08333333333333E-05*sqrt(0.045*300000)).

FAQ

What is Runoff Coefficient for Peak Rate of Runoff?
The Runoff Coefficient for Peak Rate of Runoff formula is defined as the dimension less coefficient relating the amount of runoff to the amount of precipitation received and is represented as K' = (455*QBZ)/(IBZ*sqrt(So*AD)) or Runoff Coefficient for Burkli Zeigler = (455*Peak Rate of Runoff for Burkli Zeigler)/(Intensity of Rainfall in Burkli Zeigler*sqrt(Slope of the ground*Drainage Area)). Peak Rate of Runoff for Burkli Zeigler is the maximum rate of discharge during the period of runoff caused by a storm, Intensity of Rainfall in Burkli Zeigler refers to the amount of rain that falls over a specific period, usually measured in millimeters per hour (mm/hr) or inches per hour, Slope of the ground is defined in terms of meter per unit thousands of meter & Drainage Area is the total surface area, where the water from rain which is not absorbed into the ground flows over the ground surface, back into streams, to finally reach that point.
How to calculate Runoff Coefficient for Peak Rate of Runoff?
The Runoff Coefficient for Peak Rate of Runoff formula is defined as the dimension less coefficient relating the amount of runoff to the amount of precipitation received is calculated using Runoff Coefficient for Burkli Zeigler = (455*Peak Rate of Runoff for Burkli Zeigler)/(Intensity of Rainfall in Burkli Zeigler*sqrt(Slope of the ground*Drainage Area)). To calculate Runoff Coefficient for Peak Rate of Runoff, you need Peak Rate of Runoff for Burkli Zeigler (QBZ), Intensity of Rainfall in Burkli Zeigler (IBZ), Slope of the ground (So) & Drainage Area (AD). With our tool, you need to enter the respective value for Peak Rate of Runoff for Burkli Zeigler, Intensity of Rainfall in Burkli Zeigler, Slope of the ground & Drainage Area and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.