Raw Sludge Added Per Day given Digestion is Parabolic Solution

STEP 0: Pre-Calculation Summary
Formula Used
Raw Sludge Added Per Day = ((3*Volume of Digester)/Digestion Period)+(2*Equivalent Digested Sludge)
V1' = ((3*V)/t)+(2*V2)
This formula uses 4 Variables
Variables Used
Raw Sludge Added Per Day - (Measured in Cubic Meter per Day) - Raw Sludge Added Per Day is the quantity of untreated or minimally processed sludge that is introduced into a treatment process or facility daily.
Volume of Digester - (Measured in Cubic Meter) - Volume of Digester is defined as the total capacity of the digester.
Digestion Period - (Measured in Second) - Digestion Period is the time required to complete the digestion.
Equivalent Digested Sludge - (Measured in Cubic Meter per Day) - Equivalent Digested Sludge is the volume of sludge produced per day.
STEP 1: Convert Input(s) to Base Unit
Volume of Digester: 20 Cubic Meter --> 20 Cubic Meter No Conversion Required
Digestion Period: 5 Second --> 5 Second No Conversion Required
Equivalent Digested Sludge: 1.99 Cubic Meter per Day --> 1.99 Cubic Meter per Day No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
V1' = ((3*V)/t)+(2*V2) --> ((3*20)/5)+(2*1.99)
Evaluating ... ...
V1' = 15.98
STEP 3: Convert Result to Output's Unit
0.000184953703703704 Cubic Meter per Second -->15.98 Cubic Meter per Day (Check conversion ​here)
FINAL ANSWER
15.98 Cubic Meter per Day <-- Raw Sludge Added Per Day
(Calculation completed in 00.020 seconds)

Credits

Creator Image
Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2100+ more calculators!
Verifier Image
Verified by Ishita Goyal
Meerut Institute of Engineering and Technology (MIET), Meerut
Ishita Goyal has verified this Calculator and 2600+ more calculators!

Sludge Digestion Tank or Digesters Calculators

Volume of Digester given Number of Days for which Digested Sludge is Stored
​ LaTeX ​ Go Volume of Digester = (((Raw Sludge+Equivalent Digested Sludge)/2)*Digestion Period)+(Equivalent Digested Sludge*Digestion Time in Days)
Number of Days for which Digested Sludge is Stored
​ LaTeX ​ Go Digestion Time in Days = (Volume of Digester-(((Raw Sludge+Equivalent Digested Sludge)/2)*Digestion Period))/Equivalent Digested Sludge
Equivalent Digested Sludge Produced Per Day given Digestion Period
​ LaTeX ​ Go Equivalent Digested Sludge = (Volume of Digester-((Raw Sludge*Digestion Period)/2))/((0.5*Digestion Period)+Digestion Time in Days)
Volume of Digester
​ LaTeX ​ Go Volume of Digester = ((Raw Sludge+Equivalent Digested Sludge)/2)*Digestion Time in Days

Raw Sludge Added Per Day given Digestion is Parabolic Formula

​LaTeX ​Go
Raw Sludge Added Per Day = ((3*Volume of Digester)/Digestion Period)+(2*Equivalent Digested Sludge)
V1' = ((3*V)/t)+(2*V2)

What is the Raw Sludge?

Raw sludge is untreated non-stabilized sludge, which can be taken from wastewater treatment plants. It tends to acidify digestion and produces odour.

How to Calculate Raw Sludge Added Per Day given Digestion is Parabolic?

Raw Sludge Added Per Day given Digestion is Parabolic calculator uses Raw Sludge Added Per Day = ((3*Volume of Digester)/Digestion Period)+(2*Equivalent Digested Sludge) to calculate the Raw Sludge Added Per Day, The Raw Sludge Added Per Day given Digestion is Parabolic formula is defined as the calculation of raw sludge when we have given digestion is parabolic. Raw Sludge Added Per Day is denoted by V1' symbol.

How to calculate Raw Sludge Added Per Day given Digestion is Parabolic using this online calculator? To use this online calculator for Raw Sludge Added Per Day given Digestion is Parabolic, enter Volume of Digester (V), Digestion Period (t) & Equivalent Digested Sludge (V2) and hit the calculate button. Here is how the Raw Sludge Added Per Day given Digestion is Parabolic calculation can be explained with given input values -> 1.4E+6 = ((3*20)/5)+(2*2.30324074074074E-05).

FAQ

What is Raw Sludge Added Per Day given Digestion is Parabolic?
The Raw Sludge Added Per Day given Digestion is Parabolic formula is defined as the calculation of raw sludge when we have given digestion is parabolic and is represented as V1' = ((3*V)/t)+(2*V2) or Raw Sludge Added Per Day = ((3*Volume of Digester)/Digestion Period)+(2*Equivalent Digested Sludge). Volume of Digester is defined as the total capacity of the digester, Digestion Period is the time required to complete the digestion & Equivalent Digested Sludge is the volume of sludge produced per day.
How to calculate Raw Sludge Added Per Day given Digestion is Parabolic?
The Raw Sludge Added Per Day given Digestion is Parabolic formula is defined as the calculation of raw sludge when we have given digestion is parabolic is calculated using Raw Sludge Added Per Day = ((3*Volume of Digester)/Digestion Period)+(2*Equivalent Digested Sludge). To calculate Raw Sludge Added Per Day given Digestion is Parabolic, you need Volume of Digester (V), Digestion Period (t) & Equivalent Digested Sludge (V2). With our tool, you need to enter the respective value for Volume of Digester, Digestion Period & Equivalent Digested Sludge and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!