Ratio of Pay to Loose using Compaction Production by Compaction Equipment Solution

STEP 0: Pre-Calculation Summary
Formula Used
Pay Ratio = (Production due to Compaction*Number of Passes)/(16*Width of Roller*Roller Speed*Lift Thickness*Efficiency Factor)
PR = (y*P)/(16*W*S*L*E)
This formula uses 7 Variables
Variables Used
Pay Ratio - (Measured in Cubic Meter) - Pay Ratio is the ratio between the effective stress and the total stress in soil mechanics.
Production due to Compaction - (Measured in Cubic Meter per Second) - Production due to Compaction is the exertion of force on something so that it becomes denser.
Number of Passes - Number of Passes is the number of times a compactor (such as a vibratory roller or a plate compactor) passes over a specific area of soil or aggregate during compaction.
Width of Roller - (Measured in Meter) - Width of Roller is the physical width of the roller used in compaction processes, such as those employed in soil and pavement construction.
Roller Speed - (Measured in Meter per Second) - Roller Speed is the velocity at which a compaction roller moves over soil or other materials during the compaction process.
Lift Thickness - (Measured in Meter) - Lift Thickness is the depth of a compacted layer of fill material placed during construction. This term is important in the compaction process, where fill material is often placed in layers.
Efficiency Factor - The Efficiency Factor is a dimensionless parameter used to relate the strength or stiffness of improved soil (after treatment) to its original, untreated state.
STEP 1: Convert Input(s) to Base Unit
Production due to Compaction: 297.59 Cubic Meter per Hour --> 0.0826638888888889 Cubic Meter per Second (Check conversion ​here)
Number of Passes: 5 --> No Conversion Required
Width of Roller: 2.89 Meter --> 2.89 Meter No Conversion Required
Roller Speed: 3 Kilometer per Hour --> 0.833333333333333 Meter per Second (Check conversion ​here)
Lift Thickness: 7.175 Millimeter --> 0.007175 Meter (Check conversion ​here)
Efficiency Factor: 0.5 --> No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
PR = (y*P)/(16*W*S*L*E) --> (0.0826638888888889*5)/(16*2.89*0.833333333333333*0.007175*0.5)
Evaluating ... ...
PR = 2.98990471367887
STEP 3: Convert Result to Output's Unit
2.98990471367887 Cubic Meter --> No Conversion Required
FINAL ANSWER
2.98990471367887 2.989905 Cubic Meter <-- Pay Ratio
(Calculation completed in 00.004 seconds)

Credits

Creator Image
Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2100+ more calculators!
Verifier Image
Verified by Ishita Goyal
Meerut Institute of Engineering and Technology (MIET), Meerut
Ishita Goyal has verified this Calculator and 2600+ more calculators!

Compaction Equipment Calculators

Thickness of Lift given Compaction Production by Compaction Equipment
​ LaTeX ​ Go Lift Thickness = (Production due to Compaction*Number of Passes)/(16*Width of Roller*Roller Speed*Efficiency Factor*Pay Ratio)
Width of Roller given Compaction Production by Compaction Equipment
​ LaTeX ​ Go Width of Roller = (Production due to Compaction*Number of Passes)/(16*Roller Speed*Lift Thickness*Pay Ratio*Efficiency Factor)
Speed of Roller given Compaction Production by Compaction Equipment
​ LaTeX ​ Go Roller Speed = (Production due to Compaction*Number of Passes)/(16*Width of Roller*Lift Thickness*Pay Ratio*Efficiency Factor)
Compaction Production by Compaction Equipment
​ LaTeX ​ Go Production due to Compaction = (16*Width of Roller*Roller Speed*Lift Thickness*Efficiency Factor*Pay Ratio)/Number of Passes

Ratio of Pay to Loose using Compaction Production by Compaction Equipment Formula

​LaTeX ​Go
Pay Ratio = (Production due to Compaction*Number of Passes)/(16*Width of Roller*Roller Speed*Lift Thickness*Efficiency Factor)
PR = (y*P)/(16*W*S*L*E)

What is Compaction Equipment?

Compaction Equipment refers to machinery used to compress soil, asphalt, or other materials to reduce air voids and increase density. This process is essential in construction to ensure stable and durable foundations, pavements, and other structures. Different types of compaction equipment are used depending on the material being compacted and the desired compaction level.

How to Calculate Ratio of Pay to Loose using Compaction Production by Compaction Equipment?

Ratio of Pay to Loose using Compaction Production by Compaction Equipment calculator uses Pay Ratio = (Production due to Compaction*Number of Passes)/(16*Width of Roller*Roller Speed*Lift Thickness*Efficiency Factor) to calculate the Pay Ratio, The Ratio of Pay to Loose using Compaction Production by Compaction Equipment formula is defined as a measure used to quantify the volume change of soil or aggregate materials from their loose state (uncompacted) to their compacted state. This ratio is important in determining the amount of material required and the expected final volume after compaction. Pay Ratio is denoted by PR symbol.

How to calculate Ratio of Pay to Loose using Compaction Production by Compaction Equipment using this online calculator? To use this online calculator for Ratio of Pay to Loose using Compaction Production by Compaction Equipment, enter Production due to Compaction (y), Number of Passes (P), Width of Roller (W), Roller Speed (S), Lift Thickness (L) & Efficiency Factor (E) and hit the calculate button. Here is how the Ratio of Pay to Loose using Compaction Production by Compaction Equipment calculation can be explained with given input values -> 2.809058 = (0.0826638888888889*5)/(16*2.89*0.833333333333333*0.007175*0.5).

FAQ

What is Ratio of Pay to Loose using Compaction Production by Compaction Equipment?
The Ratio of Pay to Loose using Compaction Production by Compaction Equipment formula is defined as a measure used to quantify the volume change of soil or aggregate materials from their loose state (uncompacted) to their compacted state. This ratio is important in determining the amount of material required and the expected final volume after compaction and is represented as PR = (y*P)/(16*W*S*L*E) or Pay Ratio = (Production due to Compaction*Number of Passes)/(16*Width of Roller*Roller Speed*Lift Thickness*Efficiency Factor). Production due to Compaction is the exertion of force on something so that it becomes denser, Number of Passes is the number of times a compactor (such as a vibratory roller or a plate compactor) passes over a specific area of soil or aggregate during compaction, Width of Roller is the physical width of the roller used in compaction processes, such as those employed in soil and pavement construction, Roller Speed is the velocity at which a compaction roller moves over soil or other materials during the compaction process, Lift Thickness is the depth of a compacted layer of fill material placed during construction. This term is important in the compaction process, where fill material is often placed in layers & The Efficiency Factor is a dimensionless parameter used to relate the strength or stiffness of improved soil (after treatment) to its original, untreated state.
How to calculate Ratio of Pay to Loose using Compaction Production by Compaction Equipment?
The Ratio of Pay to Loose using Compaction Production by Compaction Equipment formula is defined as a measure used to quantify the volume change of soil or aggregate materials from their loose state (uncompacted) to their compacted state. This ratio is important in determining the amount of material required and the expected final volume after compaction is calculated using Pay Ratio = (Production due to Compaction*Number of Passes)/(16*Width of Roller*Roller Speed*Lift Thickness*Efficiency Factor). To calculate Ratio of Pay to Loose using Compaction Production by Compaction Equipment, you need Production due to Compaction (y), Number of Passes (P), Width of Roller (W), Roller Speed (S), Lift Thickness (L) & Efficiency Factor (E). With our tool, you need to enter the respective value for Production due to Compaction, Number of Passes, Width of Roller, Roller Speed, Lift Thickness & Efficiency Factor and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!