Quantity of Earthwork for Hilly Road Partially in Banking Solution

STEP 0: Pre-Calculation Summary
Formula Used
Volume of Earthwork = Length of Road Section*((Half Width of Formation Level-Transverse Slope*Depth of Cutting at Centre)^2)/(2*(Transverse Slope-Side Slope of Banking))
Vearthwork = Lsection*((bhalf-r*dcenter)^2)/(2*(r-Sbanking))
This formula uses 6 Variables
Variables Used
Volume of Earthwork - (Measured in Cubic Meter) - Volume of Earthwork is measured in cubic meters without any allowance for an increase in bulk.
Length of Road Section - (Measured in Meter) - Length of Road Section is the total extent /stretch of the road.
Half Width of Formation Level - (Measured in Meter) - Half Width of Formation Level is defined as the value which we get after dividing the total formation level width by 2.
Transverse Slope - Transverse slope is defined as cross slope of ground.
Depth of Cutting at Centre - (Measured in Meter) - Depth of Cutting at Centre is the height of the bank at the center point of the cross-section of the road.
Side Slope of Banking - Side Slope of Banking is the value of the slope of the banked portion of embankment on a hilly road which is partially in cutting and banking.
STEP 1: Convert Input(s) to Base Unit
Length of Road Section: 20000 Millimeter --> 20 Meter (Check conversion ​here)
Half Width of Formation Level: 6000 Millimeter --> 6 Meter (Check conversion ​here)
Transverse Slope: 2.5 --> No Conversion Required
Depth of Cutting at Centre: 3600 Millimeter --> 3.6 Meter (Check conversion ​here)
Side Slope of Banking: 2.25 --> No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
Vearthwork = Lsection*((bhalf-r*dcenter)^2)/(2*(r-Sbanking)) --> 20*((6-2.5*3.6)^2)/(2*(2.5-2.25))
Evaluating ... ...
Vearthwork = 360
STEP 3: Convert Result to Output's Unit
360 Cubic Meter --> No Conversion Required
FINAL ANSWER
360 Cubic Meter <-- Volume of Earthwork
(Calculation completed in 00.004 seconds)

Credits

Creator Image
Created by Smriti Singh
MIT Academy of engineering, Pune (MITAOE), Alandi, Pune
Smriti Singh has created this Calculator and 25+ more calculators!
Verifier Image
Verified by Ayush Singh
Gautam Buddha University (GBU), Greater Noida
Ayush Singh has verified this Calculator and 100+ more calculators!

Quantity of Earthwork in Hill Road Calculators

Quantity of Earthwork for Hilly Road Fully in Cutting or Banking
​ LaTeX ​ Go Volume of Earthwork = Length of Road Section*(Side Slope*Half Width of Formation Level^2+Transverse Slope^2*(2*Half Width of Formation Level*Depth of Cutting at Centre+Side Slope*Depth of Cutting at Centre^2))/(Transverse Slope^2-Side Slope^2)
Quantity of Earthwork for Hilly Road Partially in Banking
​ LaTeX ​ Go Volume of Earthwork = Length of Road Section*((Half Width of Formation Level-Transverse Slope*Depth of Cutting at Centre)^2)/(2*(Transverse Slope-Side Slope of Banking))
Quantity of Earthwork for Hilly Road Partially in Cutting
​ LaTeX ​ Go Volume of Earthwork = Length of Road Section*((Half Width of Formation Level+Transverse Slope*Depth of Cutting at Centre)^2)/(2*(Transverse Slope-Side Slope of Cutting))

Quantity of Earthwork for Hilly Road Partially in Banking Formula

​LaTeX ​Go
Volume of Earthwork = Length of Road Section*((Half Width of Formation Level-Transverse Slope*Depth of Cutting at Centre)^2)/(2*(Transverse Slope-Side Slope of Banking))
Vearthwork = Lsection*((bhalf-r*dcenter)^2)/(2*(r-Sbanking))

How is the Estimate of Earthwork made?

The estimate of earthwork is made by taking cross-sections at regular intervals along the alignment, the ground is supposed to be uniform in between each of the two cross-sections. The quantities of earthwork are calculated between each of the successive cross sections and added together to get the total quantity.

How to Calculate Quantity of Earthwork for Hilly Road Partially in Banking?

Quantity of Earthwork for Hilly Road Partially in Banking calculator uses Volume of Earthwork = Length of Road Section*((Half Width of Formation Level-Transverse Slope*Depth of Cutting at Centre)^2)/(2*(Transverse Slope-Side Slope of Banking)) to calculate the Volume of Earthwork, The Quantity of Earthwork for Hilly Road Partially in Banking formula is defined as calculating the quantity of earthwork needed for the banking portion of a road, where some part is in banking and some part is in cutting. Volume of Earthwork is denoted by Vearthwork symbol.

How to calculate Quantity of Earthwork for Hilly Road Partially in Banking using this online calculator? To use this online calculator for Quantity of Earthwork for Hilly Road Partially in Banking, enter Length of Road Section (Lsection), Half Width of Formation Level (bhalf), Transverse Slope (r), Depth of Cutting at Centre (dcenter) & Side Slope of Banking (Sbanking) and hit the calculate button. Here is how the Quantity of Earthwork for Hilly Road Partially in Banking calculation can be explained with given input values -> 360 = 20*((6-2.5*3.6)^2)/(2*(2.5-2.25)).

FAQ

What is Quantity of Earthwork for Hilly Road Partially in Banking?
The Quantity of Earthwork for Hilly Road Partially in Banking formula is defined as calculating the quantity of earthwork needed for the banking portion of a road, where some part is in banking and some part is in cutting and is represented as Vearthwork = Lsection*((bhalf-r*dcenter)^2)/(2*(r-Sbanking)) or Volume of Earthwork = Length of Road Section*((Half Width of Formation Level-Transverse Slope*Depth of Cutting at Centre)^2)/(2*(Transverse Slope-Side Slope of Banking)). Length of Road Section is the total extent /stretch of the road, Half Width of Formation Level is defined as the value which we get after dividing the total formation level width by 2, Transverse slope is defined as cross slope of ground, Depth of Cutting at Centre is the height of the bank at the center point of the cross-section of the road & Side Slope of Banking is the value of the slope of the banked portion of embankment on a hilly road which is partially in cutting and banking.
How to calculate Quantity of Earthwork for Hilly Road Partially in Banking?
The Quantity of Earthwork for Hilly Road Partially in Banking formula is defined as calculating the quantity of earthwork needed for the banking portion of a road, where some part is in banking and some part is in cutting is calculated using Volume of Earthwork = Length of Road Section*((Half Width of Formation Level-Transverse Slope*Depth of Cutting at Centre)^2)/(2*(Transverse Slope-Side Slope of Banking)). To calculate Quantity of Earthwork for Hilly Road Partially in Banking, you need Length of Road Section (Lsection), Half Width of Formation Level (bhalf), Transverse Slope (r), Depth of Cutting at Centre (dcenter) & Side Slope of Banking (Sbanking). With our tool, you need to enter the respective value for Length of Road Section, Half Width of Formation Level, Transverse Slope, Depth of Cutting at Centre & Side Slope of Banking and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
How many ways are there to calculate Volume of Earthwork?
In this formula, Volume of Earthwork uses Length of Road Section, Half Width of Formation Level, Transverse Slope, Depth of Cutting at Centre & Side Slope of Banking. We can use 2 other way(s) to calculate the same, which is/are as follows -
  • Volume of Earthwork = Length of Road Section*(Side Slope*Half Width of Formation Level^2+Transverse Slope^2*(2*Half Width of Formation Level*Depth of Cutting at Centre+Side Slope*Depth of Cutting at Centre^2))/(Transverse Slope^2-Side Slope^2)
  • Volume of Earthwork = Length of Road Section*((Half Width of Formation Level+Transverse Slope*Depth of Cutting at Centre)^2)/(2*(Transverse Slope-Side Slope of Cutting))
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!