Production of Scrap by Machines Solution

STEP 0: Pre-Calculation Summary
Formula Used
Production Required in Scraper Production = (Load in Scraper Production*Trips per Hour)
Ps = (L*f)
This formula uses 3 Variables
Variables Used
Production Required in Scraper Production - (Measured in Cubic Meter per Second) - Production Required in Scraper Production is the amount of scrap produced.
Load in Scraper Production - (Measured in Cubic Meter) - Load in Scraper Production is the volume of scrap produced in every trip.
Trips per Hour - (Measured in Hertz) - Trips per Hour means the total transfer occured in a hour.
STEP 1: Convert Input(s) to Base Unit
Load in Scraper Production: 18.2 Cubic Meter --> 18.2 Cubic Meter No Conversion Required
Trips per Hour: 4 Revolution per Hour --> 0.00111111111111111 Hertz (Check conversion ​here)
STEP 2: Evaluate Formula
Substituting Input Values in Formula
Ps = (L*f) --> (18.2*0.00111111111111111)
Evaluating ... ...
Ps = 0.0202222222222222
STEP 3: Convert Result to Output's Unit
0.0202222222222222 Cubic Meter per Second -->72.7999999999999 Cubic Meter per Hour (Check conversion ​here)
FINAL ANSWER
72.7999999999999 72.8 Cubic Meter per Hour <-- Production Required in Scraper Production
(Calculation completed in 00.004 seconds)

Credits

Creator Image
Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2100+ more calculators!
Verifier Image
Verified by Ishita Goyal
Meerut Institute of Engineering and Technology (MIET), Meerut
Ishita Goyal has verified this Calculator and 2600+ more calculators!

Scraper Production Calculators

Trips per Hour given Production of Scrap by Machines
​ LaTeX ​ Go Trips per Hour = (Production Required in Scraper Production/Load in Scraper Production)
Load Given Production of Scrap by Machines
​ LaTeX ​ Go Load in Scraper Production = (Production Required in Scraper Production/Trips per Hour)
Production of Scrap by Machines
​ LaTeX ​ Go Production Required in Scraper Production = (Load in Scraper Production*Trips per Hour)
Trips per Hour for Excavating Scrap
​ LaTeX ​ Go Trips per Hour = (Working Time in Scraper Production/Cycle Time)

Production of Scrap by Machines Formula

​LaTeX ​Go
Production Required in Scraper Production = (Load in Scraper Production*Trips per Hour)
Ps = (L*f)

What is Scrap?

Scrap means waste that either has no economic value or only the value of its basic material content recoverable through recycling. In ERPNext, at the end of manufacturing process, scrap items are accounted in the scrap warehouses.

How to Calculate Production of Scrap by Machines?

Production of Scrap by Machines calculator uses Production Required in Scraper Production = (Load in Scraper Production*Trips per Hour) to calculate the Production Required in Scraper Production, The Production of Scrap by Machines is defined as the value of production of scrap when load and trips is known. Production Required in Scraper Production is denoted by Ps symbol.

How to calculate Production of Scrap by Machines using this online calculator? To use this online calculator for Production of Scrap by Machines, enter Load in Scraper Production (L) & Trips per Hour (f) and hit the calculate button. Here is how the Production of Scrap by Machines calculation can be explained with given input values -> 262080 = (18.2*0.00111111111111111).

FAQ

What is Production of Scrap by Machines?
The Production of Scrap by Machines is defined as the value of production of scrap when load and trips is known and is represented as Ps = (L*f) or Production Required in Scraper Production = (Load in Scraper Production*Trips per Hour). Load in Scraper Production is the volume of scrap produced in every trip & Trips per Hour means the total transfer occured in a hour.
How to calculate Production of Scrap by Machines?
The Production of Scrap by Machines is defined as the value of production of scrap when load and trips is known is calculated using Production Required in Scraper Production = (Load in Scraper Production*Trips per Hour). To calculate Production of Scrap by Machines, you need Load in Scraper Production (L) & Trips per Hour (f). With our tool, you need to enter the respective value for Load in Scraper Production & Trips per Hour and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
How many ways are there to calculate Production Required in Scraper Production?
In this formula, Production Required in Scraper Production uses Load in Scraper Production & Trips per Hour. We can use 2 other way(s) to calculate the same, which is/are as follows -
  • Production Required in Scraper Production = (Bank in Scraper Production/Time in Scraper Production in Hour)
  • Production Required in Scraper Production = Number of Scraper in Scraper Production*Production per Unit
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!