Formula Used
Polymer Feed Rate = (Polymer Dosage*Dry Sludge Feed)/2000
P = (Dp*S)/2000
This formula uses 3 Variables
Variables Used
Polymer Feed Rate - (Measured in Kilogram per Second) - Polymer Feed Rate is defined in terms of weight of polymer per unit time.
Polymer Dosage - Polymer Dosage refers to the amount of polymer added to a solution or system to achieve a desired result, typically related to water or wastewater treatment processes.
Dry Sludge Feed - (Measured in Kilogram per Second) - Dry Sludge Feed is defined as semi-solid material that is produced as a by-product during sewage treatment.
STEP 1: Convert Input(s) to Base Unit
Polymer Dosage: 20 --> No Conversion Required
Dry Sludge Feed: 76.5 Pound per Hour --> 0.00963883786271325 Kilogram per Second (Check conversion ​here)
STEP 2: Evaluate Formula
Substituting Input Values in Formula
P = (Dp*S)/2000 --> (20*0.00963883786271325)/2000
Evaluating ... ...
P = 9.63883786271325E-05
STEP 3: Convert Result to Output's Unit
9.63883786271325E-05 Kilogram per Second -->0.765 Pound per Hour (Check conversion ​here)
FINAL ANSWER
0.765 Pound per Hour <-- Polymer Feed Rate
(Calculation completed in 00.004 seconds)

Credits

Creator Image
Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2100+ more calculators!
Verifier Image
Verified by Ishita Goyal
Meerut Institute of Engineering and Technology (MIET), Meerut
Ishita Goyal has verified this Calculator and 2600+ more calculators!

Polymer Feed Rate Calculators

Polymer Feed Rate as Volumetric Flow Rate
​ LaTeX ​ Go Volumetric Polymer Feed Rate = (Polymer Feed Rate/(8.34*Specific Gravity of Polymer*Percent Polymer Concentration))
Dry Sludge Feed given Polymer Feed Rate of Dry Polymer
​ LaTeX ​ Go Dry Sludge Feed = (2000*Polymer Feed Rate)/Polymer Dosage
Polymer Dosage when Polymer Feed Rate of Dry Polymer
​ LaTeX ​ Go Polymer Dosage = (2000*Polymer Feed Rate)/Dry Sludge Feed
Polymer Feed Rate of Dry Polymer
​ LaTeX ​ Go Polymer Feed Rate = (Polymer Dosage*Dry Sludge Feed)/2000

Polymer Feed Rate of Dry Polymer Formula

​LaTeX ​Go
Polymer Feed Rate = (Polymer Dosage*Dry Sludge Feed)/2000
P = (Dp*S)/2000

What is Polymer Dosing ?

The Polymer Dosing System is the mixing equipment which used for the preparation of working solutions or stock solutions of chemicals (both dry and liquid polymer), the whole process is automatic, safety and continuously

How to Calculate Polymer Feed Rate of Dry Polymer?

Polymer Feed Rate of Dry Polymer calculator uses Polymer Feed Rate = (Polymer Dosage*Dry Sludge Feed)/2000 to calculate the Polymer Feed Rate, The Polymer Feed Rate of Dry Polymer is defined as the weight of polymer per unit time, when we have prior information of polymer dosage and dry sludge feed. Polymer Feed Rate is denoted by P symbol.

How to calculate Polymer Feed Rate of Dry Polymer using this online calculator? To use this online calculator for Polymer Feed Rate of Dry Polymer, enter Polymer Dosage (Dp) & Dry Sludge Feed (S) and hit the calculate button. Here is how the Polymer Feed Rate of Dry Polymer calculation can be explained with given input values -> 6071.531 = (20*0.00963883786271325)/2000.

FAQ

What is Polymer Feed Rate of Dry Polymer?
The Polymer Feed Rate of Dry Polymer is defined as the weight of polymer per unit time, when we have prior information of polymer dosage and dry sludge feed and is represented as P = (Dp*S)/2000 or Polymer Feed Rate = (Polymer Dosage*Dry Sludge Feed)/2000. Polymer Dosage refers to the amount of polymer added to a solution or system to achieve a desired result, typically related to water or wastewater treatment processes & Dry Sludge Feed is defined as semi-solid material that is produced as a by-product during sewage treatment.
How to calculate Polymer Feed Rate of Dry Polymer?
The Polymer Feed Rate of Dry Polymer is defined as the weight of polymer per unit time, when we have prior information of polymer dosage and dry sludge feed is calculated using Polymer Feed Rate = (Polymer Dosage*Dry Sludge Feed)/2000. To calculate Polymer Feed Rate of Dry Polymer, you need Polymer Dosage (Dp) & Dry Sludge Feed (S). With our tool, you need to enter the respective value for Polymer Dosage & Dry Sludge Feed and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
How many ways are there to calculate Polymer Feed Rate?
In this formula, Polymer Feed Rate uses Polymer Dosage & Dry Sludge Feed. We can use 1 other way(s) to calculate the same, which is/are as follows -
  • Polymer Feed Rate = (Volumetric Polymer Feed Rate*8.34*Specific Gravity of Polymer*Percent Polymer Concentration)
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!