How to Calculate Peak Rate of Runoff from Nawab Jung Bahadur Formula?
Peak Rate of Runoff from Nawab Jung Bahadur Formula calculator uses Peak Rate of Runoff for Nawab Jung Bahadur = Coefficient*(Catchment Area in KM)^(0.93-(1/14)*log10(Catchment Area in KM)) to calculate the Peak Rate of Runoff for Nawab Jung Bahadur, The Peak Rate of Runoff from Nawab Jung Bahadur Formula is defined as the maximum rate of flow during a storm event. It is a critical factor in designing storm water management systems, such as culverts, storm sewers, and detention basins. Peak Rate of Runoff for Nawab Jung Bahadur is denoted by QNJB symbol.
How to calculate Peak Rate of Runoff from Nawab Jung Bahadur Formula using this online calculator? To use this online calculator for Peak Rate of Runoff from Nawab Jung Bahadur Formula, enter Coefficient (C2) & Catchment Area in KM (Akm) and hit the calculate button. Here is how the Peak Rate of Runoff from Nawab Jung Bahadur Formula calculation can be explained with given input values -> 125.6423 = 55*(2500000)^(0.93-(1/14)*log10(2500000)).