How to Calculate Peak Load given Load Factor for Turbo-Generators?
Peak Load given Load Factor for Turbo-Generators calculator uses Peak Load = Average Load/Load Factor to calculate the Peak Load, The Peak Load given Load Factor for Turbo-Generators is defined as the period of time when electrical power is needed sustained period based on demand. Also known as peak demand. Peak Load is denoted by PL symbol.
How to calculate Peak Load given Load Factor for Turbo-Generators using this online calculator? To use this online calculator for Peak Load given Load Factor for Turbo-Generators, enter Average Load (LAvg) & Load Factor (LF) and hit the calculate button. Here is how the Peak Load given Load Factor for Turbo-Generators calculation can be explained with given input values -> 0.004 = 400/0.1.