Operation Time given Sludge Feed Rate for Dewatering Facility Solution

STEP 0: Pre-Calculation Summary
Formula Used
Operation Time = (Digested Sludge/Volumetric Sludge Feed Rate)
T = (Ds/Sv)
This formula uses 3 Variables
Variables Used
Operation Time - (Measured in Second) - Operation Time refers to the duration during which a particular environmental engineering system or process is actively functioning to achieve its intended purpose.
Digested Sludge - (Measured in Cubic Meter per Second) - Digested Sludge is the product of either aerobic or anaerobic digestion and is a well-stabilized material capable of being dewatered.
Volumetric Sludge Feed Rate - (Measured in Cubic Meter per Second) - Volumetric Sludge Feed Rate relates the daily wastewater load and the available sludge mass.
STEP 1: Convert Input(s) to Base Unit
Digested Sludge: 24 Cubic Meter per Second --> 24 Cubic Meter per Second No Conversion Required
Volumetric Sludge Feed Rate: 2.4 Cubic Meter per Second --> 2.4 Cubic Meter per Second No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
T = (Ds/Sv) --> (24/2.4)
Evaluating ... ...
T = 10
STEP 3: Convert Result to Output's Unit
10 Second --> No Conversion Required
FINAL ANSWER
10 Second <-- Operation Time
(Calculation completed in 00.020 seconds)

Credits

Creator Image
Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2100+ more calculators!
Verifier Image
Verified by Ishita Goyal
Meerut Institute of Engineering and Technology (MIET), Meerut
Ishita Goyal has verified this Calculator and 2600+ more calculators!

Sludge Volume and Feed Rate Calculators

Digested Sludge using Sludge Feed Rate for Dewatering Facility
​ LaTeX ​ Go Digested Sludge = (Volumetric Sludge Feed Rate*Operation Time)
Sludge Feed Rate for Dewatering Facility
​ LaTeX ​ Go Volumetric Sludge Feed Rate = (Digested Sludge/Operation Time)
Sludge Volume-in given Percent Reduction in Sludge Volume
​ LaTeX ​ Go Sludge Volume in = (Sludge Volume Out/(1-Volume Reduction))
Sludge Volume-out given Percent Reduction in Sludge Volume
​ LaTeX ​ Go Sludge Volume Out = Sludge Volume in*(1-Volume Reduction)

Operation Time given Sludge Feed Rate for Dewatering Facility Formula

​LaTeX ​Go
Operation Time = (Digested Sludge/Volumetric Sludge Feed Rate)
T = (Ds/Sv)

What is Digested Sludge?

Digested sludge is the product of either aerobic or anaerobic digestion and is a well-stabilized material capable of being dewatered on open drying beds without severe odor problems.

How to Calculate Operation Time given Sludge Feed Rate for Dewatering Facility?

Operation Time given Sludge Feed Rate for Dewatering Facility calculator uses Operation Time = (Digested Sludge/Volumetric Sludge Feed Rate) to calculate the Operation Time, The Operation Time given Sludge Feed Rate for Dewatering Facility is defined as the duration during which a particular environmental engineering system or process is actively functioning to achieve its intended purpose, when we have prior information of digested sludge and sludge feed rate. Operation Time is denoted by T symbol.

How to calculate Operation Time given Sludge Feed Rate for Dewatering Facility using this online calculator? To use this online calculator for Operation Time given Sludge Feed Rate for Dewatering Facility, enter Digested Sludge (Ds) & Volumetric Sludge Feed Rate (Sv) and hit the calculate button. Here is how the Operation Time given Sludge Feed Rate for Dewatering Facility calculation can be explained with given input values -> 10 = (24/2.4).

FAQ

What is Operation Time given Sludge Feed Rate for Dewatering Facility?
The Operation Time given Sludge Feed Rate for Dewatering Facility is defined as the duration during which a particular environmental engineering system or process is actively functioning to achieve its intended purpose, when we have prior information of digested sludge and sludge feed rate and is represented as T = (Ds/Sv) or Operation Time = (Digested Sludge/Volumetric Sludge Feed Rate). Digested Sludge is the product of either aerobic or anaerobic digestion and is a well-stabilized material capable of being dewatered & Volumetric Sludge Feed Rate relates the daily wastewater load and the available sludge mass.
How to calculate Operation Time given Sludge Feed Rate for Dewatering Facility?
The Operation Time given Sludge Feed Rate for Dewatering Facility is defined as the duration during which a particular environmental engineering system or process is actively functioning to achieve its intended purpose, when we have prior information of digested sludge and sludge feed rate is calculated using Operation Time = (Digested Sludge/Volumetric Sludge Feed Rate). To calculate Operation Time given Sludge Feed Rate for Dewatering Facility, you need Digested Sludge (Ds) & Volumetric Sludge Feed Rate (Sv). With our tool, you need to enter the respective value for Digested Sludge & Volumetric Sludge Feed Rate and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!