Operation Factor Solution

STEP 0: Pre-Calculation Summary
Formula Used
Operation Factor = Working Time/Total Time
OF = T/Tt
This formula uses 3 Variables
Variables Used
Operation Factor - Operation Factor the ratio of the duration during which the plant is in actual service, to the total duration of the period of time considered.
Working Time - (Measured in Second) - Working Time refers to the total duration for which a power plant is in working state.
Total Time - (Measured in Second) - Total Time refers to the total duration for which a plant is operating.
STEP 1: Convert Input(s) to Base Unit
Working Time: 6 Hour --> 21600 Second (Check conversion ​here)
Total Time: 10 Hour --> 36000 Second (Check conversion ​here)
STEP 2: Evaluate Formula
Substituting Input Values in Formula
OF = T/Tt --> 21600/36000
Evaluating ... ...
OF = 0.6
STEP 3: Convert Result to Output's Unit
0.6 --> No Conversion Required
FINAL ANSWER
0.6 <-- Operation Factor
(Calculation completed in 00.004 seconds)

Credits

Creator Image
Created by Parminder Singh
Chandigarh University (CU), Punjab
Parminder Singh has created this Calculator and 100+ more calculators!
Verifier Image
Verified by Aman Dhussawat
GURU TEGH BAHADUR INSTITUTE OF TECHNOLOGY (GTBIT), NEW DELHI
Aman Dhussawat has verified this Calculator and 100+ more calculators!

Power Plant Operational Factors Calculators

Unit Generated per Annum
​ LaTeX ​ Go Units Generated = Maximum Demand*Load Factor*8760
Demand Factor
​ LaTeX ​ Go Demand Factor = Maximum Demand/Connected Load
Load Factor given Average Load and Maximum Demand
​ LaTeX ​ Go Load Factor = Average Load/Maximum Demand
Average Load for Load Curve
​ LaTeX ​ Go Average Load = Load Curve Area/24

Operation Factor Formula

​LaTeX ​Go
Operation Factor = Working Time/Total Time
OF = T/Tt

What is responsibility factor?

Responsibility factor is often used in guiding demand side management. Utilities often get charged for its contribution to the peak of independent system operator. To avoid a high charge, a utility has to reduce the responsibility factor. This can be done by implementing various programs that help shift the peak. Similarly, responsibility factor is also used in rate making. A customer with high peak demand may not get high demand charge if the peak occurs during off-peak period of the utility system load.

How to Calculate Operation Factor?

Operation Factor calculator uses Operation Factor = Working Time/Total Time to calculate the Operation Factor, The Operation Factor formula is defined as the ratio of the duration during which the plant is in actual service, to the total duration of the period of time considered. Operation Factor is denoted by OF symbol.

How to calculate Operation Factor using this online calculator? To use this online calculator for Operation Factor, enter Working Time (T) & Total Time (Tt) and hit the calculate button. Here is how the Operation Factor calculation can be explained with given input values -> 0.6 = 21600/36000.

FAQ

What is Operation Factor?
The Operation Factor formula is defined as the ratio of the duration during which the plant is in actual service, to the total duration of the period of time considered and is represented as OF = T/Tt or Operation Factor = Working Time/Total Time. Working Time refers to the total duration for which a power plant is in working state & Total Time refers to the total duration for which a plant is operating.
How to calculate Operation Factor?
The Operation Factor formula is defined as the ratio of the duration during which the plant is in actual service, to the total duration of the period of time considered is calculated using Operation Factor = Working Time/Total Time. To calculate Operation Factor, you need Working Time (T) & Total Time (Tt). With our tool, you need to enter the respective value for Working Time & Total Time and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.