Observed Runoff Volume at Terminal Gauging Station given Yield of Catchment Solution

STEP 0: Pre-Calculation Summary
Formula Used
Observed Flow Volume = Yield of Catchment-Abstraction in Time-Change in Storage Volumes
Ro = Y-Ab-ΔSv
This formula uses 4 Variables
Variables Used
Observed Flow Volume - (Measured in Cubic Meter per Second) - Observed Flow Volume is the recorded the quantity of water that would have flowed in a river past a particular point in a particular period.
Yield of Catchment - Yield of Catchment at a time period by influenced by water balance equation.
Abstraction in Time - Abstraction in Time in time for irrigation, water supply and industrial use and inclusive of evaporation losses in surface water bodies on the stream.
Change in Storage Volumes - Change in Storage Volumes of water storage bodies on the stream is the difference of water incoming and outgoing.
STEP 1: Convert Input(s) to Base Unit
Yield of Catchment: 186 --> No Conversion Required
Abstraction in Time: 115 --> No Conversion Required
Change in Storage Volumes: 20 --> No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
Ro = Y-Ab-ΔSv --> 186-115-20
Evaluating ... ...
Ro = 51
STEP 3: Convert Result to Output's Unit
51 Cubic Meter per Second --> No Conversion Required
FINAL ANSWER
51 Cubic Meter per Second <-- Observed Flow Volume
(Calculation completed in 00.004 seconds)

Credits

Creator Image
Created by Mithila Muthamma PA
Coorg Institute of Technology (CIT), Coorg
Mithila Muthamma PA has created this Calculator and 2000+ more calculators!
Verifier Image
Verified by Chandana P Dev
NSS College of Engineering (NSSCE), Palakkad
Chandana P Dev has verified this Calculator and 1700+ more calculators!

Yield of Catchment Calculators

Observed Runoff Volume at Terminal Gauging Station given Yield of Catchment
​ LaTeX ​ Go Observed Flow Volume = Yield of Catchment-Abstraction in Time-Change in Storage Volumes
Volume of Return Flow given Yield of Catchment
​ LaTeX ​ Go Volume of Return Flow = Yield of Catchment-Natural Flow Volume
Yield of Catchment by Water Balance Equation
​ LaTeX ​ Go Yield of Catchment = Natural Flow Volume+Volume of Return Flow
Natural Flow given Yield of Catchment
​ LaTeX ​ Go Natural Flow Volume = Yield of Catchment-Volume of Return Flow

Observed Runoff Volume at Terminal Gauging Station given Yield of Catchment Formula

​LaTeX ​Go
Observed Flow Volume = Yield of Catchment-Abstraction in Time-Change in Storage Volumes
Ro = Y-Ab-ΔSv

What is Water Balance Analysis?

The Water Balance Analysis reveals the percentages of precipitation made up by surface flow, evapotranspiration, groundwater recharge and the change of soil storage, all of which are considered useful to the further understanding of the hydrological processes.

What is a Catchment and Catchment Yield?

Catchments are areas of land where runoff collects in a specific zone. This movement is caused by water moving from areas of high energy to low energy due to the influence of gravity.
The Yield Coefficient or the proportion of rainfall that runs off. Only a relatively small proportion of the rainfall received in the catchment area runs off into watercourses or to fill dams. This is then multiplied by the catchment area and the average annual rainfall to determine the Catchment Yield.

How to Calculate Observed Runoff Volume at Terminal Gauging Station given Yield of Catchment?

Observed Runoff Volume at Terminal Gauging Station given Yield of Catchment calculator uses Observed Flow Volume = Yield of Catchment-Abstraction in Time-Change in Storage Volumes to calculate the Observed Flow Volume, The Observed Runoff Volume at Terminal Gauging Station given Yield of Catchment formula is defined as the recorded flow of water occurring on the ground surface when excess rainwater, stormwater, meltwater, or other sources, can no longer sufficiently rapidly infiltrate in soil. Observed Flow Volume is denoted by Ro symbol.

How to calculate Observed Runoff Volume at Terminal Gauging Station given Yield of Catchment using this online calculator? To use this online calculator for Observed Runoff Volume at Terminal Gauging Station given Yield of Catchment, enter Yield of Catchment (Y), Abstraction in Time (Ab) & Change in Storage Volumes (ΔSv) and hit the calculate button. Here is how the Observed Runoff Volume at Terminal Gauging Station given Yield of Catchment calculation can be explained with given input values -> 51 = 186-115-20.

FAQ

What is Observed Runoff Volume at Terminal Gauging Station given Yield of Catchment?
The Observed Runoff Volume at Terminal Gauging Station given Yield of Catchment formula is defined as the recorded flow of water occurring on the ground surface when excess rainwater, stormwater, meltwater, or other sources, can no longer sufficiently rapidly infiltrate in soil and is represented as Ro = Y-Ab-ΔSv or Observed Flow Volume = Yield of Catchment-Abstraction in Time-Change in Storage Volumes. Yield of Catchment at a time period by influenced by water balance equation, Abstraction in Time in time for irrigation, water supply and industrial use and inclusive of evaporation losses in surface water bodies on the stream & Change in Storage Volumes of water storage bodies on the stream is the difference of water incoming and outgoing.
How to calculate Observed Runoff Volume at Terminal Gauging Station given Yield of Catchment?
The Observed Runoff Volume at Terminal Gauging Station given Yield of Catchment formula is defined as the recorded flow of water occurring on the ground surface when excess rainwater, stormwater, meltwater, or other sources, can no longer sufficiently rapidly infiltrate in soil is calculated using Observed Flow Volume = Yield of Catchment-Abstraction in Time-Change in Storage Volumes. To calculate Observed Runoff Volume at Terminal Gauging Station given Yield of Catchment, you need Yield of Catchment (Y), Abstraction in Time (Ab) & Change in Storage Volumes (ΔSv). With our tool, you need to enter the respective value for Yield of Catchment, Abstraction in Time & Change in Storage Volumes and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!