Non-Productive Time in Turning Solution

STEP 0: Pre-Calculation Summary
Formula Used
Non-Productive Time = ((Basic Setup Time+Number of Tools Used*Setup Time Per Tool)/Batch Size)+Loading And Unloading Time+(Tool Positioning Time Per Operation*Number of Operations)
NPT = ((ts+Nt*tst)/Nb)+tln+(tpt*n0)
This formula uses 8 Variables
Variables Used
Non-Productive Time - (Measured in Second) - Non-Productive Time (NPT) refers to the time during which a machine is not actively engaged in producing parts.
Basic Setup Time - (Measured in Second) - Basic Setup Time is the basic time required to load/unload the workpiece and position the tool for production for one component.
Number of Tools Used - The Number of Tools Used is the total number of tools used for manufacturing a batch of products.
Setup Time Per Tool - (Measured in Second) - Setup Time Per Tool is defined as the amount of time taken in setting up the tool while machining.
Batch Size - Batch Size is the count of similar kinds of products to be manufactured.
Loading And Unloading Time - (Measured in Second) - Loading And Unloading Time is the time required to load/unload the workpiece before the start of machine operation.
Tool Positioning Time Per Operation - (Measured in Second) - Tool Positioning Time Per Operation is defined as the time taken in changing the tool before the start of operation.
Number of Operations - The Number of Operations is defined as the total number of operations done in a batch.
STEP 1: Convert Input(s) to Base Unit
Basic Setup Time: 20.5 Minute --> 1230 Second (Check conversion ​here)
Number of Tools Used: 4 --> No Conversion Required
Setup Time Per Tool: 10 Minute --> 600 Second (Check conversion ​here)
Batch Size: 3 --> No Conversion Required
Loading And Unloading Time: 30 Second --> 30 Second No Conversion Required
Tool Positioning Time Per Operation: 1.5 Minute --> 90 Second (Check conversion ​here)
Number of Operations: 5 --> No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
NPT = ((ts+Nt*tst)/Nb)+tln+(tpt*n0) --> ((1230+4*600)/3)+30+(90*5)
Evaluating ... ...
NPT = 1690
STEP 3: Convert Result to Output's Unit
1690 Second -->28.1666666666667 Minute (Check conversion ​here)
FINAL ANSWER
28.1666666666667 28.16667 Minute <-- Non-Productive Time
(Calculation completed in 00.004 seconds)

Credits

Creator Image
Created by Parul Keshav
National Institute of Technology (NIT), Srinagar
Parul Keshav has created this Calculator and 300+ more calculators!
Verifier Image
Verified by Rajat Vishwakarma
University Institute of Technology RGPV (UIT - RGPV), Bhopal
Rajat Vishwakarma has verified this Calculator and 400+ more calculators!

Turning Operation Calculators

Diameter of Workpiece given Constant for Cylindrical Turning
​ LaTeX ​ Go Diameter of Workpiece = Constant For Machining Condition*Feed/(pi*Length of Cut)
Turning Length given Constant for Cylindrical Turning
​ LaTeX ​ Go Length of Cut = Constant For Machining Condition*Feed/(pi*Diameter of Workpiece)
Feed given Constant for Cylindrical Turning
​ LaTeX ​ Go Feed = pi*Diameter of Workpiece*Length of Cut/Constant For Machining Condition
Constant for given Cylindrical Turning
​ LaTeX ​ Go Constant For Machining Condition = pi*Diameter of Workpiece*Length of Cut/Feed

Non-Productive Time in Turning Formula

​LaTeX ​Go
Non-Productive Time = ((Basic Setup Time+Number of Tools Used*Setup Time Per Tool)/Batch Size)+Loading And Unloading Time+(Tool Positioning Time Per Operation*Number of Operations)
NPT = ((ts+Nt*tst)/Nb)+tln+(tpt*n0)

What is the difference between turning and facing operations?

In the turning operation, the tool generally reduces the diameter of the cylindrical workpiece, which can be done by cutting into the part for some depth and move the tool parallel to the axis of the part. While facing operation reduces the length of the piece, the tool is moved perpendicular to the axis of the part.

How to Calculate Non-Productive Time in Turning?

Non-Productive Time in Turning calculator uses Non-Productive Time = ((Basic Setup Time+Number of Tools Used*Setup Time Per Tool)/Batch Size)+Loading And Unloading Time+(Tool Positioning Time Per Operation*Number of Operations) to calculate the Non-Productive Time, The Non-Productive Time in Turning is the total time wasted in setting up the machine or workpiece for a particular process. Non-Productive Time is denoted by NPT symbol.

How to calculate Non-Productive Time in Turning using this online calculator? To use this online calculator for Non-Productive Time in Turning, enter Basic Setup Time (ts), Number of Tools Used (Nt), Setup Time Per Tool (tst), Batch Size (Nb), Loading And Unloading Time (tln), Tool Positioning Time Per Operation (tpt) & Number of Operations (n0) and hit the calculate button. Here is how the Non-Productive Time in Turning calculation can be explained with given input values -> 0.469444 = ((1230+4*600)/3)+30+(90*5).

FAQ

What is Non-Productive Time in Turning?
The Non-Productive Time in Turning is the total time wasted in setting up the machine or workpiece for a particular process and is represented as NPT = ((ts+Nt*tst)/Nb)+tln+(tpt*n0) or Non-Productive Time = ((Basic Setup Time+Number of Tools Used*Setup Time Per Tool)/Batch Size)+Loading And Unloading Time+(Tool Positioning Time Per Operation*Number of Operations). Basic Setup Time is the basic time required to load/unload the workpiece and position the tool for production for one component, The Number of Tools Used is the total number of tools used for manufacturing a batch of products, Setup Time Per Tool is defined as the amount of time taken in setting up the tool while machining, Batch Size is the count of similar kinds of products to be manufactured, Loading And Unloading Time is the time required to load/unload the workpiece before the start of machine operation, Tool Positioning Time Per Operation is defined as the time taken in changing the tool before the start of operation & The Number of Operations is defined as the total number of operations done in a batch.
How to calculate Non-Productive Time in Turning?
The Non-Productive Time in Turning is the total time wasted in setting up the machine or workpiece for a particular process is calculated using Non-Productive Time = ((Basic Setup Time+Number of Tools Used*Setup Time Per Tool)/Batch Size)+Loading And Unloading Time+(Tool Positioning Time Per Operation*Number of Operations). To calculate Non-Productive Time in Turning, you need Basic Setup Time (ts), Number of Tools Used (Nt), Setup Time Per Tool (tst), Batch Size (Nb), Loading And Unloading Time (tln), Tool Positioning Time Per Operation (tpt) & Number of Operations (n0). With our tool, you need to enter the respective value for Basic Setup Time, Number of Tools Used, Setup Time Per Tool, Batch Size, Loading And Unloading Time, Tool Positioning Time Per Operation & Number of Operations and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.