Maximum Rainfall Intensity given Peak Rate of Runoff Solution

STEP 0: Pre-Calculation Summary
Formula Used
Intensity of Rainfall in Burkli Zeigler = 455*Peak Rate of Runoff for Burkli Zeigler/(Runoff Coefficient for Burkli Zeigler*sqrt(Slope of the ground*Drainage Area))
IBZ = 455*QBZ/(K'*sqrt(So*AD))
This formula uses 1 Functions, 5 Variables
Functions Used
sqrt - A square root function is a function that takes a non-negative number as an input and returns the square root of the given input number., sqrt(Number)
Variables Used
Intensity of Rainfall in Burkli Zeigler - (Measured in Centimeter per Hour) - Intensity of Rainfall in Burkli Zeigler refers to the amount of rain that falls over a specific period, usually measured in millimeters per hour (mm/hr) or inches per hour.
Peak Rate of Runoff for Burkli Zeigler - (Measured in Cubic Meter per Second) - Peak Rate of Runoff for Burkli Zeigler is the maximum rate of discharge during the period of runoff caused by a storm.
Runoff Coefficient for Burkli Zeigler - Runoff Coefficient for Burkli Zeigler is a dimensionless coefficient relating the amount of runoff to the amount of precipitation received.
Slope of the ground - Slope of the ground is defined in terms of meter per unit thousands of meter.
Drainage Area - (Measured in Hectare) - Drainage Area is the total surface area, where the water from rain which is not absorbed into the ground flows over the ground surface, back into streams, to finally reach that point.
STEP 1: Convert Input(s) to Base Unit
Peak Rate of Runoff for Burkli Zeigler: 1.34 Cubic Meter per Second --> 1.34 Cubic Meter per Second No Conversion Required
Runoff Coefficient for Burkli Zeigler: 251878.2 --> No Conversion Required
Slope of the ground: 0.045 --> No Conversion Required
Drainage Area: 30 Hectare --> 30 Hectare No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
IBZ = 455*QBZ/(K'*sqrt(So*AD)) --> 455*1.34/(251878.2*sqrt(0.045*30))
Evaluating ... ...
IBZ = 0.00208333317556983
STEP 3: Convert Result to Output's Unit
5.78703659880509E-09 Meter per Second -->0.00208333317556983 Centimeter per Hour (Check conversion ​here)
FINAL ANSWER
0.00208333317556983 0.002083 Centimeter per Hour <-- Intensity of Rainfall in Burkli Zeigler
(Calculation completed in 00.020 seconds)

Credits

Creator Image
Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2100+ more calculators!
Verifier Image
Verified by Ishita Goyal
Meerut Institute of Engineering and Technology (MIET), Meerut
Ishita Goyal has verified this Calculator and 2600+ more calculators!

Burkli Ziegler Formula Calculators

Peak Rate of Runoff from Burkli-Ziegler Formula
​ LaTeX ​ Go Peak Rate of Runoff for Burkli Zeigler = ((Runoff Coefficient for Burkli Zeigler*Intensity of Rainfall in Burkli Zeigler*Drainage Area)/455)*sqrt(Slope of the ground/Drainage Area)
Drainage Area for Peak Rate of Runoff
​ LaTeX ​ Go Drainage Area = ((Peak Rate of Runoff for Burkli Zeigler*455)/(Runoff Coefficient for Burkli Zeigler*Intensity of Rainfall in Burkli Zeigler*sqrt(Slope of the ground)))^2
Runoff Coefficient for Peak Rate of Runoff
​ LaTeX ​ Go Runoff Coefficient for Burkli Zeigler = (455*Peak Rate of Runoff for Burkli Zeigler)/(Intensity of Rainfall in Burkli Zeigler*sqrt(Slope of the ground*Drainage Area))
Maximum Rainfall Intensity given Peak Rate of Runoff
​ LaTeX ​ Go Intensity of Rainfall in Burkli Zeigler = 455*Peak Rate of Runoff for Burkli Zeigler/(Runoff Coefficient for Burkli Zeigler*sqrt(Slope of the ground*Drainage Area))

Maximum Rainfall Intensity given Peak Rate of Runoff Formula

​LaTeX ​Go
Intensity of Rainfall in Burkli Zeigler = 455*Peak Rate of Runoff for Burkli Zeigler/(Runoff Coefficient for Burkli Zeigler*sqrt(Slope of the ground*Drainage Area))
IBZ = 455*QBZ/(K'*sqrt(So*AD))

What is Maximum Rainfall Intensity ?

Maximum Rainfall Intensity is determined as the average rainfall rate in mm/h or mm/min for specific rainfall duration and a selected frequency.

How to Calculate Maximum Rainfall Intensity given Peak Rate of Runoff?

Maximum Rainfall Intensity given Peak Rate of Runoff calculator uses Intensity of Rainfall in Burkli Zeigler = 455*Peak Rate of Runoff for Burkli Zeigler/(Runoff Coefficient for Burkli Zeigler*sqrt(Slope of the ground*Drainage Area)) to calculate the Intensity of Rainfall in Burkli Zeigler, The Maximum Rainfall Intensity given Peak Rate of Runoff formula is defined as the highest amount of rainfall that can occur within a specified time period, typically measured in millimeters per hour (mm/h) or inches per hour (in/h). Intensity of Rainfall in Burkli Zeigler is denoted by IBZ symbol.

How to calculate Maximum Rainfall Intensity given Peak Rate of Runoff using this online calculator? To use this online calculator for Maximum Rainfall Intensity given Peak Rate of Runoff, enter Peak Rate of Runoff for Burkli Zeigler (QBZ), Runoff Coefficient for Burkli Zeigler (K'), Slope of the ground (So) & Drainage Area (AD) and hit the calculate button. Here is how the Maximum Rainfall Intensity given Peak Rate of Runoff calculation can be explained with given input values -> 749.9999 = 455*1.34/(251878.2*sqrt(0.045*300000)).

FAQ

What is Maximum Rainfall Intensity given Peak Rate of Runoff?
The Maximum Rainfall Intensity given Peak Rate of Runoff formula is defined as the highest amount of rainfall that can occur within a specified time period, typically measured in millimeters per hour (mm/h) or inches per hour (in/h) and is represented as IBZ = 455*QBZ/(K'*sqrt(So*AD)) or Intensity of Rainfall in Burkli Zeigler = 455*Peak Rate of Runoff for Burkli Zeigler/(Runoff Coefficient for Burkli Zeigler*sqrt(Slope of the ground*Drainage Area)). Peak Rate of Runoff for Burkli Zeigler is the maximum rate of discharge during the period of runoff caused by a storm, Runoff Coefficient for Burkli Zeigler is a dimensionless coefficient relating the amount of runoff to the amount of precipitation received, Slope of the ground is defined in terms of meter per unit thousands of meter & Drainage Area is the total surface area, where the water from rain which is not absorbed into the ground flows over the ground surface, back into streams, to finally reach that point.
How to calculate Maximum Rainfall Intensity given Peak Rate of Runoff?
The Maximum Rainfall Intensity given Peak Rate of Runoff formula is defined as the highest amount of rainfall that can occur within a specified time period, typically measured in millimeters per hour (mm/h) or inches per hour (in/h) is calculated using Intensity of Rainfall in Burkli Zeigler = 455*Peak Rate of Runoff for Burkli Zeigler/(Runoff Coefficient for Burkli Zeigler*sqrt(Slope of the ground*Drainage Area)). To calculate Maximum Rainfall Intensity given Peak Rate of Runoff, you need Peak Rate of Runoff for Burkli Zeigler (QBZ), Runoff Coefficient for Burkli Zeigler (K'), Slope of the ground (So) & Drainage Area (AD). With our tool, you need to enter the respective value for Peak Rate of Runoff for Burkli Zeigler, Runoff Coefficient for Burkli Zeigler, Slope of the ground & Drainage Area and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!