How to Calculate Maximum Demand given Load Factor?
Maximum Demand given Load Factor calculator uses Maximum Demand = Average Load/Load Factor to calculate the Maximum Demand, Maximum Demand given Load Factor is defined as the maximum raise in demand. It is generally measured in MW. Maximum Demand is denoted by Max Demand symbol.
How to calculate Maximum Demand given Load Factor using this online calculator? To use this online calculator for Maximum Demand given Load Factor, enter Average Load (Avg Load) & Load Factor (Load Factor) and hit the calculate button. Here is how the Maximum Demand given Load Factor calculation can be explained with given input values -> 1.7 = 1105000/0.65.