How to Calculate Loading and Unloading Time given Non-productive Time in Turning?
Loading and Unloading Time given Non-productive Time in Turning calculator uses Loading And Unloading Time = Non-Productive Time-((Basic Setup Time+Number of Tools Used*Setup Time Per Tool)/Batch Size)-(Tool Positioning Time Per Operation*Number of Operations) to calculate the Loading And Unloading Time, The Loading and Unloading Time given Non-productive Time in Turning is the time required to load/unload the workpiece before the start of machine operation. Loading And Unloading Time is denoted by tln symbol.
How to calculate Loading and Unloading Time given Non-productive Time in Turning using this online calculator? To use this online calculator for Loading and Unloading Time given Non-productive Time in Turning, enter Non-Productive Time (NPT), Basic Setup Time (ts), Number of Tools Used (Nt), Setup Time Per Tool (tst), Batch Size (Nb), Tool Positioning Time Per Operation (tpt) & Number of Operations (n0) and hit the calculate button. Here is how the Loading and Unloading Time given Non-productive Time in Turning calculation can be explained with given input values -> 0.008372 = 1690.14-((1230+4*600)/3)-(90*5).