Load or Unload or Setup Time given Total Non-Productive Time Solution

STEP 0: Pre-Calculation Summary
Formula Used
Setup Time = Non Productive Time/Batch Size
ts = NPT/Nb
This formula uses 3 Variables
Variables Used
Setup Time - (Measured in Second) - Setup Time of each component is the time required to load/unload the workpiece and position the tool for production for one component.
Non Productive Time - (Measured in Second) - Non Productive Time is the total time wasted in setting up the machine or workpiece for a particular process.
Batch Size - Batch Size is the count of similar kinds of products to be manufactured.
STEP 1: Convert Input(s) to Base Unit
Non Productive Time: 108 Second --> 108 Second No Conversion Required
Batch Size: 2 --> No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
ts = NPT/Nb --> 108/2
Evaluating ... ...
ts = 54
STEP 3: Convert Result to Output's Unit
54 Second --> No Conversion Required
FINAL ANSWER
54 Second <-- Setup Time
(Calculation completed in 00.004 seconds)

Credits

Creator Image
Created by Kumar Siddhant
Indian Institute of Information Technology, Design and Manufacturing (IIITDM), Jabalpur
Kumar Siddhant has created this Calculator and 400+ more calculators!
Verifier Image
Verified by Parul Keshav
National Institute of Technology (NIT), Srinagar
Parul Keshav has verified this Calculator and 400+ more calculators!

Total Production Time Calculators

Total Machining Time or Total Machine Time
​ LaTeX ​ Go Total Machining Time = Batch Size*Machining Time
Load or Unload or Setup Time given Total Non-Productive Time
​ LaTeX ​ Go Setup Time = Non Productive Time/Batch Size
Size of Batch using Total Non-Productive Time
​ LaTeX ​ Go Batch Size = Non Productive Time/Setup Time
Total Non-Productive Time
​ LaTeX ​ Go Non Productive Time = Batch Size*Setup Time

Load or Unload or Setup Time given Total Non-Productive Time Formula

​LaTeX ​Go
Setup Time = Non Productive Time/Batch Size
ts = NPT/Nb

Managing Non-Productive Time

The reduction of non-productive time is one of the key elements to remain competitive in a fabricating environment. This is usually done by:
1. Control front end processing time
2. Analyze total cycle time
3. Maintain machine cycle time
4. Reduce total order turnaround

How to Calculate Load or Unload or Setup Time given Total Non-Productive Time?

Load or Unload or Setup Time given Total Non-Productive Time calculator uses Setup Time = Non Productive Time/Batch Size to calculate the Setup Time, The Load or Unload or Setup Time given Total Non-Productive Time is a method to determine the maximum time available to set up each component when demand and the maximum time that can be spared is known. Setup Time is denoted by ts symbol.

How to calculate Load or Unload or Setup Time given Total Non-Productive Time using this online calculator? To use this online calculator for Load or Unload or Setup Time given Total Non-Productive Time, enter Non Productive Time (NPT) & Batch Size (Nb) and hit the calculate button. Here is how the Load or Unload or Setup Time given Total Non-Productive Time calculation can be explained with given input values -> 600 = 108/2.

FAQ

What is Load or Unload or Setup Time given Total Non-Productive Time?
The Load or Unload or Setup Time given Total Non-Productive Time is a method to determine the maximum time available to set up each component when demand and the maximum time that can be spared is known and is represented as ts = NPT/Nb or Setup Time = Non Productive Time/Batch Size. Non Productive Time is the total time wasted in setting up the machine or workpiece for a particular process & Batch Size is the count of similar kinds of products to be manufactured.
How to calculate Load or Unload or Setup Time given Total Non-Productive Time?
The Load or Unload or Setup Time given Total Non-Productive Time is a method to determine the maximum time available to set up each component when demand and the maximum time that can be spared is known is calculated using Setup Time = Non Productive Time/Batch Size. To calculate Load or Unload or Setup Time given Total Non-Productive Time, you need Non Productive Time (NPT) & Batch Size (Nb). With our tool, you need to enter the respective value for Non Productive Time & Batch Size and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!