Load Given Production of Scrap by Machines Solution

STEP 0: Pre-Calculation Summary
Formula Used
Load in Scraper Production = (Production Required in Scraper Production/Trips per Hour)
L = (Ps/f)
This formula uses 3 Variables
Variables Used
Load in Scraper Production - (Measured in Cubic Meter) - Load in Scraper Production is the volume of scrap produced in every trip.
Production Required in Scraper Production - (Measured in Cubic Meter per Second) - Production Required in Scraper Production is the amount of scrap produced.
Trips per Hour - (Measured in Hertz) - Trips per Hour means the total transfer occured in a hour.
STEP 1: Convert Input(s) to Base Unit
Production Required in Scraper Production: 75 Cubic Meter per Hour --> 0.0208333333333333 Cubic Meter per Second (Check conversion ​here)
Trips per Hour: 4 Revolution per Hour --> 0.00111111111111111 Hertz (Check conversion ​here)
STEP 2: Evaluate Formula
Substituting Input Values in Formula
L = (Ps/f) --> (0.0208333333333333/0.00111111111111111)
Evaluating ... ...
L = 18.75
STEP 3: Convert Result to Output's Unit
18.75 Cubic Meter --> No Conversion Required
FINAL ANSWER
18.75 Cubic Meter <-- Load in Scraper Production
(Calculation completed in 00.004 seconds)

Credits

Creator Image
Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2100+ more calculators!
Verifier Image
Verified by Mithila Muthamma PA
Coorg Institute of Technology (CIT), Coorg
Mithila Muthamma PA has verified this Calculator and 700+ more calculators!

Scraper Production Calculators

Trips per Hour given Production of Scrap by Machines
​ LaTeX ​ Go Trips per Hour = (Production Required in Scraper Production/Load in Scraper Production)
Load Given Production of Scrap by Machines
​ LaTeX ​ Go Load in Scraper Production = (Production Required in Scraper Production/Trips per Hour)
Production of Scrap by Machines
​ LaTeX ​ Go Production Required in Scraper Production = (Load in Scraper Production*Trips per Hour)
Trips per Hour for Excavating Scrap
​ LaTeX ​ Go Trips per Hour = (Working Time in Scraper Production/Cycle Time)

Load Given Production of Scrap by Machines Formula

​LaTeX ​Go
Load in Scraper Production = (Production Required in Scraper Production/Trips per Hour)
L = (Ps/f)

What is Scrap?

Scrap means waste that either has no economic value or only the value of its basic material content recoverable through recycling. In ERPNext, at the end of manufacturing process, scrap items are accounted in the scrap warehouses.

How to Calculate Load Given Production of Scrap by Machines?

Load Given Production of Scrap by Machines calculator uses Load in Scraper Production = (Production Required in Scraper Production/Trips per Hour) to calculate the Load in Scraper Production, The Load Given Production of Scrap by Machines is defined as the volume of load when we have prior information of production and trips. Load in Scraper Production is denoted by L symbol.

How to calculate Load Given Production of Scrap by Machines using this online calculator? To use this online calculator for Load Given Production of Scrap by Machines, enter Production Required in Scraper Production (Ps) & Trips per Hour (f) and hit the calculate button. Here is how the Load Given Production of Scrap by Machines calculation can be explained with given input values -> 18.75 = (0.0208333333333333/0.00111111111111111).

FAQ

What is Load Given Production of Scrap by Machines?
The Load Given Production of Scrap by Machines is defined as the volume of load when we have prior information of production and trips and is represented as L = (Ps/f) or Load in Scraper Production = (Production Required in Scraper Production/Trips per Hour). Production Required in Scraper Production is the amount of scrap produced & Trips per Hour means the total transfer occured in a hour.
How to calculate Load Given Production of Scrap by Machines?
The Load Given Production of Scrap by Machines is defined as the volume of load when we have prior information of production and trips is calculated using Load in Scraper Production = (Production Required in Scraper Production/Trips per Hour). To calculate Load Given Production of Scrap by Machines, you need Production Required in Scraper Production (Ps) & Trips per Hour (f). With our tool, you need to enter the respective value for Production Required in Scraper Production & Trips per Hour and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!