Length of Pipe Hanging in Well given Effective Tension Solution

STEP 0: Pre-Calculation Summary
Formula Used
Length of Pipe Hanging in Well = ((Effective Tension/((Mass Density of Steel-Density of Drilling Mud)*[g]*Cross Section Area of Steel in Pipe)+Coordinate measured Downward from Top))
LWell = ((Te/((ρs-ρm)*[g]*As)+z))
This formula uses 1 Constants, 6 Variables
Constants Used
[g] - Gravitational acceleration on Earth Value Taken As 9.80665
Variables Used
Length of Pipe Hanging in Well - (Measured in Meter) - Length of Pipe Hanging in Well is essential in calculating all other values required in drilling.
Effective Tension - (Measured in Newton) - Effective Tension when buoyant force acts in a direction opposite to the gravity force.
Mass Density of Steel - (Measured in Kilogram per Cubic Meter) - Mass Density of Steel varies based on the alloying constituents but usually ranges between 7,750 and 8,050 kg/m3.
Density of Drilling Mud - (Measured in Kilogram per Cubic Meter) - Density of Drilling Mud considering a steel drilling pipe hanging in an oil well.
Cross Section Area of Steel in Pipe - (Measured in Square Meter) - Cross Section Area of Steel in Pipe is the extent of a surface or plane figure as measured in square units.
Coordinate measured Downward from Top - Coordinate measured Downward from Top depends on tension on a Vertical Drill String.
STEP 1: Convert Input(s) to Base Unit
Effective Tension: 402.22 Kilonewton --> 402220 Newton (Check conversion ​here)
Mass Density of Steel: 7750 Kilogram per Cubic Meter --> 7750 Kilogram per Cubic Meter No Conversion Required
Density of Drilling Mud: 1440 Kilogram per Cubic Meter --> 1440 Kilogram per Cubic Meter No Conversion Required
Cross Section Area of Steel in Pipe: 0.65 Square Meter --> 0.65 Square Meter No Conversion Required
Coordinate measured Downward from Top: 6 --> No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
LWell = ((Te/((ρsm)*[g]*As)+z)) --> ((402220/((7750-1440)*[g]*0.65)+6))
Evaluating ... ...
LWell = 16.0000062217233
STEP 3: Convert Result to Output's Unit
16.0000062217233 Meter --> No Conversion Required
FINAL ANSWER
16.0000062217233 16.00001 Meter <-- Length of Pipe Hanging in Well
(Calculation completed in 00.004 seconds)

Credits

Creator Image
Created by Mithila Muthamma PA
Coorg Institute of Technology (CIT), Coorg
Mithila Muthamma PA has created this Calculator and 2000+ more calculators!
Verifier Image
Verified by M Naveen
National Institute of Technology (NIT), Warangal
M Naveen has verified this Calculator and 900+ more calculators!

Hydrostatics Calculators

Coordinate measured Downward from Top given Tension on Vertical Drill String
​ LaTeX ​ Go Coordinate measured Downward from Top = -((Tension on Vertical Drill String/(Mass Density of Steel*[g]*Cross Section Area of Steel in Pipe))-Length of Pipe Hanging in Well)
Cross Section Area of Steel in Pipe given Tension on Vertical Drill String
​ LaTeX ​ Go Cross Section Area of Steel in Pipe = Tension on Vertical Drill String/(Mass Density of Steel*[g]*(Length of Pipe Hanging in Well-Coordinate measured Downward from Top))
Mass Density of Steel for Tension on Vertical Drill String
​ LaTeX ​ Go Mass Density of Steel = Tension on Vertical Drill String/([g]*Cross Section Area of Steel in Pipe*(Length of Pipe Hanging in Well-Coordinate measured Downward from Top))
Tension on Vertical Drill String
​ LaTeX ​ Go Tension on Vertical Drill String = Mass Density of Steel*[g]*Cross Section Area of Steel in Pipe*(Length of Pipe Hanging in Well-Coordinate measured Downward from Top)

Length of Pipe Hanging in Well given Effective Tension Formula

​LaTeX ​Go
Length of Pipe Hanging in Well = ((Effective Tension/((Mass Density of Steel-Density of Drilling Mud)*[g]*Cross Section Area of Steel in Pipe)+Coordinate measured Downward from Top))
LWell = ((Te/((ρs-ρm)*[g]*As)+z))

What is Buoyancy?

Buoyancy is the force that causes objects to float. It is the force exerted on an object that is partly or wholly immersed in a fluid. Buoyancy is caused by the differences in pressure acting on opposite sides of an object immersed in a static fluid. It is also known as the buoyant force

How to Calculate Length of Pipe Hanging in Well given Effective Tension?

Length of Pipe Hanging in Well given Effective Tension calculator uses Length of Pipe Hanging in Well = ((Effective Tension/((Mass Density of Steel-Density of Drilling Mud)*[g]*Cross Section Area of Steel in Pipe)+Coordinate measured Downward from Top)) to calculate the Length of Pipe Hanging in Well, The Length of Pipe Hanging in Well given Effective Tension for when the buoyant force caused by the mud is treated as a distributed force concluding, that there is a distributed buoyant force acting on the entire body equal to the weight of drilling mud displaced by the drill string. Length of Pipe Hanging in Well is denoted by LWell symbol.

How to calculate Length of Pipe Hanging in Well given Effective Tension using this online calculator? To use this online calculator for Length of Pipe Hanging in Well given Effective Tension, enter Effective Tension (Te), Mass Density of Steel s), Density of Drilling Mud m), Cross Section Area of Steel in Pipe (As) & Coordinate measured Downward from Top (z) and hit the calculate button. Here is how the Length of Pipe Hanging in Well given Effective Tension calculation can be explained with given input values -> 16.00001 = ((402220/((7750-1440)*[g]*0.65)+6)).

FAQ

What is Length of Pipe Hanging in Well given Effective Tension?
The Length of Pipe Hanging in Well given Effective Tension for when the buoyant force caused by the mud is treated as a distributed force concluding, that there is a distributed buoyant force acting on the entire body equal to the weight of drilling mud displaced by the drill string and is represented as LWell = ((Te/((ρsm)*[g]*As)+z)) or Length of Pipe Hanging in Well = ((Effective Tension/((Mass Density of Steel-Density of Drilling Mud)*[g]*Cross Section Area of Steel in Pipe)+Coordinate measured Downward from Top)). Effective Tension when buoyant force acts in a direction opposite to the gravity force, Mass Density of Steel varies based on the alloying constituents but usually ranges between 7,750 and 8,050 kg/m3, Density of Drilling Mud considering a steel drilling pipe hanging in an oil well, Cross Section Area of Steel in Pipe is the extent of a surface or plane figure as measured in square units & Coordinate measured Downward from Top depends on tension on a Vertical Drill String.
How to calculate Length of Pipe Hanging in Well given Effective Tension?
The Length of Pipe Hanging in Well given Effective Tension for when the buoyant force caused by the mud is treated as a distributed force concluding, that there is a distributed buoyant force acting on the entire body equal to the weight of drilling mud displaced by the drill string is calculated using Length of Pipe Hanging in Well = ((Effective Tension/((Mass Density of Steel-Density of Drilling Mud)*[g]*Cross Section Area of Steel in Pipe)+Coordinate measured Downward from Top)). To calculate Length of Pipe Hanging in Well given Effective Tension, you need Effective Tension (Te), Mass Density of Steel s), Density of Drilling Mud m), Cross Section Area of Steel in Pipe (As) & Coordinate measured Downward from Top (z). With our tool, you need to enter the respective value for Effective Tension, Mass Density of Steel, Density of Drilling Mud, Cross Section Area of Steel in Pipe & Coordinate measured Downward from Top and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
How many ways are there to calculate Length of Pipe Hanging in Well?
In this formula, Length of Pipe Hanging in Well uses Effective Tension, Mass Density of Steel, Density of Drilling Mud, Cross Section Area of Steel in Pipe & Coordinate measured Downward from Top. We can use 3 other way(s) to calculate the same, which is/are as follows -
  • Length of Pipe Hanging in Well = (Tension on Vertical Drill String/(Mass Density of Steel*[g]*Cross Section Area of Steel in Pipe))+Coordinate measured Downward from Top
  • Length of Pipe Hanging in Well = Vertical Force at Bottom end of Drill String/(Density of Drilling Mud*[g]*Cross Section Area of Steel in Pipe)
  • Length of Pipe Hanging in Well = (Lower Section of Drill String Length*Mass Density of Steel)/Density of Drilling Mud
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!