What is Constant Rate Drying Period?
The constant rate drying period is a stage in the drying process where the rate of moisture removal from the material is constant and is determined by the drying conditions, such as temperature, humidity, and airflow. During this period, the moisture on the surface of the material is rapidly removed, resulting in a steep decline in the moisture content of the material.
How to Calculate Initial Moisture Content based on Final Moisture Content for Constant Rate Period?
Initial Moisture Content based on Final Moisture Content for Constant Rate Period calculator uses Initial Moisture Content for Constant Rate Period = ((Drying Surface Area*Constant Rate Drying Time*Rate of Constant Drying Period)/Dry Weight of Solid)+Final Moisture Content for Constant Rate Period to calculate the Initial Moisture Content for Constant Rate Period, The Initial Moisture Content based on Final Moisture Content for Constant Rate Period formula is defined as the Initial Moisture Content present based on the specific drying conditions for the constant rate drying period with Final Moisture Content. Initial Moisture Content for Constant Rate Period is denoted by Xi(Constant) symbol.
How to calculate Initial Moisture Content based on Final Moisture Content for Constant Rate Period using this online calculator? To use this online calculator for Initial Moisture Content based on Final Moisture Content for Constant Rate Period, enter Drying Surface Area (A), Constant Rate Drying Time (tc), Rate of Constant Drying Period (Nc), Dry Weight of Solid (WS) & Final Moisture Content for Constant Rate Period (Xf(Constant)) and hit the calculate button. Here is how the Initial Moisture Content based on Final Moisture Content for Constant Rate Period calculation can be explained with given input values -> 0.53 = ((0.1*190*2)/100)+0.15.