Fundamental Period for other Buildings Solution

STEP 0: Pre-Calculation Summary
Formula Used
Fundamental Period = 0.02*Height of Building^(3/4)
T = 0.02*hn^(3/4)
This formula uses 2 Variables
Variables Used
Fundamental Period - (Measured in Second) - Fundamental Period is the time taken for one complete oscillation (back-and-forth) by the building.
Height of Building - (Measured in Meter) - The Height of Building is the height above the basic to the highest level of the building.
STEP 1: Convert Input(s) to Base Unit
Height of Building: 32 Foot --> 9.75360000003901 Meter (Check conversion ​here)
STEP 2: Evaluate Formula
Substituting Input Values in Formula
T = 0.02*hn^(3/4) --> 0.02*9.75360000003901^(3/4)
Evaluating ... ...
T = 0.110383383338835
STEP 3: Convert Result to Output's Unit
0.110383383338835 Second --> No Conversion Required
FINAL ANSWER
0.110383383338835 0.110383 Second <-- Fundamental Period
(Calculation completed in 00.004 seconds)

Credits

Creator Image
Created by Mridul Sharma
Indian Institute of Information Technology (IIIT), Bhopal
Mridul Sharma has created this Calculator and 200+ more calculators!
Verifier Image
Verified by Chandana P Dev
NSS College of Engineering (NSSCE), Palakkad
Chandana P Dev has verified this Calculator and 1700+ more calculators!

Seismic Loads Calculators

Seismic Response Coefficient given Fundamental Period
​ LaTeX ​ Go Seismic Response Coefficient = 1.2*Seismic Coefficient for Short Period Structures/(Response Modification Factor*Fundamental Period^(2/3))
Total Lateral Force Acting in Direction of each of Principal Axis
​ LaTeX ​ Go Lateral Force = Seismic Response Coefficient*Total Dead Load
Seismic Response Coefficient given Base Shear
​ LaTeX ​ Go Seismic Response Coefficient = Lateral Force/Total Dead Load
Total Dead Load given Base Shear
​ LaTeX ​ Go Total Dead Load = Lateral Force/Seismic Response Coefficient

Fundamental Period for other Buildings Formula

​LaTeX ​Go
Fundamental Period = 0.02*Height of Building^(3/4)
T = 0.02*hn^(3/4)

What is the Fundamental Period of a Structure?

Depending on mass and stiffness, the fundamental period is a global characteristic describing the behavior of building under seismic loads. Usually, they are height-depend relationships setting up considering the total height of buildings or their number of storeys

How to Calculate Fundamental Period for other Buildings?

Fundamental Period for other Buildings calculator uses Fundamental Period = 0.02*Height of Building^(3/4) to calculate the Fundamental Period, The Fundamental Period for other Buildings is defined as the fundamental period for all other buildings except reinforced concrete frames, steel frames and steel eccentrically braced frames when we have a prior info of the height of the building. Fundamental Period is denoted by T symbol.

How to calculate Fundamental Period for other Buildings using this online calculator? To use this online calculator for Fundamental Period for other Buildings, enter Height of Building (hn) and hit the calculate button. Here is how the Fundamental Period for other Buildings calculation can be explained with given input values -> 0.110383 = 0.02*9.75360000003901^(3/4).

FAQ

What is Fundamental Period for other Buildings?
The Fundamental Period for other Buildings is defined as the fundamental period for all other buildings except reinforced concrete frames, steel frames and steel eccentrically braced frames when we have a prior info of the height of the building and is represented as T = 0.02*hn^(3/4) or Fundamental Period = 0.02*Height of Building^(3/4). The Height of Building is the height above the basic to the highest level of the building.
How to calculate Fundamental Period for other Buildings?
The Fundamental Period for other Buildings is defined as the fundamental period for all other buildings except reinforced concrete frames, steel frames and steel eccentrically braced frames when we have a prior info of the height of the building is calculated using Fundamental Period = 0.02*Height of Building^(3/4). To calculate Fundamental Period for other Buildings, you need Height of Building (hn). With our tool, you need to enter the respective value for Height of Building and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
How many ways are there to calculate Fundamental Period?
In this formula, Fundamental Period uses Height of Building. We can use 3 other way(s) to calculate the same, which is/are as follows -
  • Fundamental Period = (1.2*Seismic Coefficient for Short Period Structures/(Response Modification Factor*Seismic Response Coefficient))^(3/2)
  • Fundamental Period = 0.035*Height of Building^(3/4)
  • Fundamental Period = 0.03*Height of Building^(3/4)
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!