First Estimate of Pumping Rate Solution

STEP 0: Pre-Calculation Summary
Formula Used
First Estimate of the Pumping Rate = 2.7*Transmissivity*Drawdown Across One Log Cycle
Qe = 2.7*T*Δs
This formula uses 3 Variables
Variables Used
First Estimate of the Pumping Rate - (Measured in Cubic Meter per Second) - The First Estimate of the Pumping Rate refers to the preliminary calculation used to determine the amount of water that can be pumped from a well.
Transmissivity - (Measured in Square Meter per Second) - Transmissivity is the rate at which groundwater flows horizontally through an aquifer or the degree to which a medium allows something, in particular electromagnetic radiation, to pass through it.
Drawdown Across One Log Cycle - The Drawdown Across One Log Cycle is referred as change in water level (or hydraulic head) in an aquifer due to pumping from a well.
STEP 1: Convert Input(s) to Base Unit
Transmissivity: 11 Square Meter per Second --> 11 Square Meter per Second No Conversion Required
Drawdown Across One Log Cycle: 44.55 --> No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
Qe = 2.7*T*Δs --> 2.7*11*44.55
Evaluating ... ...
Qe = 1323.135
STEP 3: Convert Result to Output's Unit
1323.135 Cubic Meter per Second --> No Conversion Required
FINAL ANSWER
1323.135 Cubic Meter per Second <-- First Estimate of the Pumping Rate
(Calculation completed in 00.020 seconds)

Credits

Creator Image
Created by Mithila Muthamma PA
Coorg Institute of Technology (CIT), Coorg
Mithila Muthamma PA has created this Calculator and 2000+ more calculators!
Verifier Image
Verified by Chandana P Dev
NSS College of Engineering (NSSCE), Palakkad
Chandana P Dev has verified this Calculator and 1700+ more calculators!

Well Field Design Calculators

Distance from Pumping Well
​ LaTeX ​ Go Distance from Pumping Well to Point Intersection = sqrt(2.25*Transmissivity*Time/Storage Coefficient (Well-Field Design))
Storage Coefficient given Distance from Pumping Well
​ LaTeX ​ Go Storage Coefficient (Well-Field Design) = (2.25*Transmissivity*Time)/(Distance from Pumping Well to Point Intersection^2)
Transmissivity given Distance from Pumping Well
​ LaTeX ​ Go Transmissivity = Distance from Pumping Well to Point Intersection^2*Storage Coefficient (Well-Field Design)/(2.25*Time)
First Estimate of Pumping Rate
​ LaTeX ​ Go First Estimate of the Pumping Rate = 2.7*Transmissivity*Drawdown Across One Log Cycle

First Estimate of Pumping Rate Formula

​LaTeX ​Go
First Estimate of the Pumping Rate = 2.7*Transmissivity*Drawdown Across One Log Cycle
Qe = 2.7*T*Δs

What is Pumping Rate?

Pumping Rate is the actual (or maximum desired, if constraints are to be applied) volumetric pumping rate (negative for withdrawal or positive for injection) at the well .

How to Calculate First Estimate of Pumping Rate?

First Estimate of Pumping Rate calculator uses First Estimate of the Pumping Rate = 2.7*Transmissivity*Drawdown Across One Log Cycle to calculate the First Estimate of the Pumping Rate, The First Estimate of Pumping Rate formula is defined as the estimate to provide sufficient pressure to overcome the operating pressure of the system to move fluid at a required flow rate. First Estimate of the Pumping Rate is denoted by Qe symbol.

How to calculate First Estimate of Pumping Rate using this online calculator? To use this online calculator for First Estimate of Pumping Rate, enter Transmissivity (T) & Drawdown Across One Log Cycle (Δs) and hit the calculate button. Here is how the First Estimate of Pumping Rate calculation can be explained with given input values -> 1323.135 = 2.7*11*44.55.

FAQ

What is First Estimate of Pumping Rate?
The First Estimate of Pumping Rate formula is defined as the estimate to provide sufficient pressure to overcome the operating pressure of the system to move fluid at a required flow rate and is represented as Qe = 2.7*T*Δs or First Estimate of the Pumping Rate = 2.7*Transmissivity*Drawdown Across One Log Cycle. Transmissivity is the rate at which groundwater flows horizontally through an aquifer or the degree to which a medium allows something, in particular electromagnetic radiation, to pass through it & The Drawdown Across One Log Cycle is referred as change in water level (or hydraulic head) in an aquifer due to pumping from a well.
How to calculate First Estimate of Pumping Rate?
The First Estimate of Pumping Rate formula is defined as the estimate to provide sufficient pressure to overcome the operating pressure of the system to move fluid at a required flow rate is calculated using First Estimate of the Pumping Rate = 2.7*Transmissivity*Drawdown Across One Log Cycle. To calculate First Estimate of Pumping Rate, you need Transmissivity (T) & Drawdown Across One Log Cycle (Δs). With our tool, you need to enter the respective value for Transmissivity & Drawdown Across One Log Cycle and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!