Final Moisture Content based on Initial to Final Moisture Content for Falling Rate Period Solution

STEP 0: Pre-Calculation Summary
Formula Used
Final Moisture Content for Falling Rate Period = ((Initial Moisture Content for Falling Rate Period-Equilibrium Moisture Content)/(exp((Drying Surface Area*Falling Rate Drying Time*Rate of Constant Drying Period)/(Dry Weight of Solid*(Initial Moisture Content for Falling Rate Period-Equilibrium Moisture Content)))))+Equilibrium Moisture Content
Xf(Falling) = ((Xi(Falling)-XEq)/(exp((A*tf*Nc)/(WS*(Xi(Falling)-XEq)))))+XEq
This formula uses 1 Functions, 7 Variables
Functions Used
exp - n an exponential function, the value of the function changes by a constant factor for every unit change in the independent variable., exp(Number)
Variables Used
Final Moisture Content for Falling Rate Period - The Final Moisture Content for Falling Rate Period is defined as the ratio of the weight of moisture to the weight of dry solid present after the completion of the drying process.
Initial Moisture Content for Falling Rate Period - The Initial Moisture Content for Falling Rate Period is defined as the ratio of the weight of moisture to the weight of dry solid present initially in the wet solid for drying operation.
Equilibrium Moisture Content - The Equilibrium Moisture Content is defined as the ratio of the weight of moisture in equilibrium with the solid to the weight of dry solid.
Drying Surface Area - (Measured in Square Meter) - The Drying Surface Area is the total area in the drying mass transfer operation i.e. exposed in contact with the drying medium.
Falling Rate Drying Time - (Measured in Second) - The Falling rate drying time is the time taken for drying operation in the falling rate period.
Rate of Constant Drying Period - (Measured in Kilogram per Second per Square Meter) - The Rate of Constant Drying Period is the rate of drying that takes place for a given set of drying conditions in the constant rate period.
Dry Weight of Solid - (Measured in Kilogram) - The Dry Weight of Solid is the weight of dry solid present in the system in the drying mass transfer operation.
STEP 1: Convert Input(s) to Base Unit
Initial Moisture Content for Falling Rate Period: 0.1 --> No Conversion Required
Equilibrium Moisture Content: 0.05 --> No Conversion Required
Drying Surface Area: 0.1 Square Meter --> 0.1 Square Meter No Conversion Required
Falling Rate Drying Time: 37 Second --> 37 Second No Conversion Required
Rate of Constant Drying Period: 2 Kilogram per Second per Square Meter --> 2 Kilogram per Second per Square Meter No Conversion Required
Dry Weight of Solid: 100 Kilogram --> 100 Kilogram No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
Xf(Falling) = ((Xi(Falling)-XEq)/(exp((A*tf*Nc)/(WS*(Xi(Falling)-XEq)))))+XEq --> ((0.1-0.05)/(exp((0.1*37*2)/(100*(0.1-0.05)))))+0.05
Evaluating ... ...
Xf(Falling) = 0.0613818844191906
STEP 3: Convert Result to Output's Unit
0.0613818844191906 --> No Conversion Required
FINAL ANSWER
0.0613818844191906 0.061382 <-- Final Moisture Content for Falling Rate Period
(Calculation completed in 00.020 seconds)

Credits

Creator Image
Created by Vaibhav Mishra
DJ Sanghvi College of Engineering (DJSCE), Mumbai
Vaibhav Mishra has created this Calculator and 300+ more calculators!
Verifier Image
Verified by Prerana Bakli
University of Hawaiʻi at Mānoa (UH Manoa), Hawaii, USA
Prerana Bakli has verified this Calculator and 1600+ more calculators!

Drying from Initial to Final Moisture Calculators

Drying Surface Area based on Initial to Final Moisture Content for Falling Rate Period
​ LaTeX ​ Go Drying Surface Area = (Dry Weight of Solid/Falling Rate Drying Time)*((Initial Moisture Content for Falling Rate Period-Equilibrium Moisture Content)/Rate of Constant Drying Period)*(ln((Initial Moisture Content for Falling Rate Period-Equilibrium Moisture Content)/(Final Moisture Content for Falling Rate Period-Equilibrium Moisture Content)))
Falling Rate Drying Time from Initial to Final Moisture
​ LaTeX ​ Go Falling Rate Drying Time = (Dry Weight of Solid/Drying Surface Area)*((Initial Moisture Content for Falling Rate Period-Equilibrium Moisture Content)/Rate of Constant Drying Period)*(ln((Initial Moisture Content for Falling Rate Period-Equilibrium Moisture Content)/(Final Moisture Content for Falling Rate Period-Equilibrium Moisture Content)))
Drying Surface Area based on Initial to Final Weight of Moisture for Falling Rate Period
​ LaTeX ​ Go Drying Surface Area = ((Initial Weight of Moisture for Falling Rate Period-Equilibrium Weight of Moisture)/(Falling Rate Drying Time*Rate of Constant Drying Period))*(ln((Initial Weight of Moisture for Falling Rate Period-Equilibrium Weight of Moisture)/(Final Weight of Moisture for Falling Rate Period-Equilibrium Weight of Moisture)))
Falling Rate Drying Time from Initial to Final Weight of Moisture
​ LaTeX ​ Go Falling Rate Drying Time = ((Initial Weight of Moisture for Falling Rate Period-Equilibrium Weight of Moisture)/(Drying Surface Area*Rate of Constant Drying Period))*(ln((Initial Weight of Moisture for Falling Rate Period-Equilibrium Weight of Moisture)/(Final Weight of Moisture for Falling Rate Period-Equilibrium Weight of Moisture)))

Important Formulas in Drying Mass Transfer Operation Calculators

Constant Drying Time from Initial to Critical Moisture Content
​ LaTeX ​ Go Constant Rate Drying Time = Dry Weight of Solid*((Initial Moisture Content for Constant Rate Period-Critical Moisture Content))/((Drying Surface Area*Rate of Constant Drying Period))
Critical Moisture Content based on Initial Moisture Content for Constant Rate Period
​ LaTeX ​ Go Critical Moisture Content = Initial Moisture Content for Constant Rate Period-((Drying Surface Area*Constant Rate Drying Time*Rate of Constant Drying Period)/Dry Weight of Solid)
Constant Drying Time from Initial to Critical Weight of Moisture
​ LaTeX ​ Go Constant Rate Drying Time = (Initial Weight of Moisture for Constant Rate-Critical Weight of Moisture)/(Drying Surface Area*Rate of Constant Drying Period)
Total Drying Time based on Constant Drying Time and Falling Drying Time
​ LaTeX ​ Go Total Drying Time = Constant Rate Drying Time+Falling Rate Drying Time

Final Moisture Content based on Initial to Final Moisture Content for Falling Rate Period Formula

​LaTeX ​Go
Final Moisture Content for Falling Rate Period = ((Initial Moisture Content for Falling Rate Period-Equilibrium Moisture Content)/(exp((Drying Surface Area*Falling Rate Drying Time*Rate of Constant Drying Period)/(Dry Weight of Solid*(Initial Moisture Content for Falling Rate Period-Equilibrium Moisture Content)))))+Equilibrium Moisture Content
Xf(Falling) = ((Xi(Falling)-XEq)/(exp((A*tf*Nc)/(WS*(Xi(Falling)-XEq)))))+XEq

What is Falling Rate Period Drying?

The falling rate drying period is a stage in the drying process where the rate of moisture removal from the material decreases over time as the internal moisture content of the material is reduced. During this period, the drying rate is typically controlled by the rate of moisture diffusion within the material, which is slower than the rate of heat and mass transfer at the surface of the material. In this stage, the moisture content of the material decreases more slowly than during the constant rate drying period, as the remaining moisture is located deeper within the material and must diffuse to the surface before it can be removed. The length of the falling rate period depends on the properties of the material being dried, such as its porosity, particle size, and moisture distribution.

How to Calculate Final Moisture Content based on Initial to Final Moisture Content for Falling Rate Period?

Final Moisture Content based on Initial to Final Moisture Content for Falling Rate Period calculator uses Final Moisture Content for Falling Rate Period = ((Initial Moisture Content for Falling Rate Period-Equilibrium Moisture Content)/(exp((Drying Surface Area*Falling Rate Drying Time*Rate of Constant Drying Period)/(Dry Weight of Solid*(Initial Moisture Content for Falling Rate Period-Equilibrium Moisture Content)))))+Equilibrium Moisture Content to calculate the Final Moisture Content for Falling Rate Period, The Final Moisture Content based on Initial to Final Moisture Content for Falling Rate Period formula is defined as the final moisture content that can be attained from the specified initial moisture content based on the drying conditions in falling rate period. Final Moisture Content for Falling Rate Period is denoted by Xf(Falling) symbol.

How to calculate Final Moisture Content based on Initial to Final Moisture Content for Falling Rate Period using this online calculator? To use this online calculator for Final Moisture Content based on Initial to Final Moisture Content for Falling Rate Period, enter Initial Moisture Content for Falling Rate Period (Xi(Falling)), Equilibrium Moisture Content (XEq), Drying Surface Area (A), Falling Rate Drying Time (tf), Rate of Constant Drying Period (Nc) & Dry Weight of Solid (WS) and hit the calculate button. Here is how the Final Moisture Content based on Initial to Final Moisture Content for Falling Rate Period calculation can be explained with given input values -> 0.061382 = ((0.1-0.05)/(exp((0.1*37*2)/(100*(0.1-0.05)))))+0.05.

FAQ

What is Final Moisture Content based on Initial to Final Moisture Content for Falling Rate Period?
The Final Moisture Content based on Initial to Final Moisture Content for Falling Rate Period formula is defined as the final moisture content that can be attained from the specified initial moisture content based on the drying conditions in falling rate period and is represented as Xf(Falling) = ((Xi(Falling)-XEq)/(exp((A*tf*Nc)/(WS*(Xi(Falling)-XEq)))))+XEq or Final Moisture Content for Falling Rate Period = ((Initial Moisture Content for Falling Rate Period-Equilibrium Moisture Content)/(exp((Drying Surface Area*Falling Rate Drying Time*Rate of Constant Drying Period)/(Dry Weight of Solid*(Initial Moisture Content for Falling Rate Period-Equilibrium Moisture Content)))))+Equilibrium Moisture Content. The Initial Moisture Content for Falling Rate Period is defined as the ratio of the weight of moisture to the weight of dry solid present initially in the wet solid for drying operation, The Equilibrium Moisture Content is defined as the ratio of the weight of moisture in equilibrium with the solid to the weight of dry solid, The Drying Surface Area is the total area in the drying mass transfer operation i.e. exposed in contact with the drying medium, The Falling rate drying time is the time taken for drying operation in the falling rate period, The Rate of Constant Drying Period is the rate of drying that takes place for a given set of drying conditions in the constant rate period & The Dry Weight of Solid is the weight of dry solid present in the system in the drying mass transfer operation.
How to calculate Final Moisture Content based on Initial to Final Moisture Content for Falling Rate Period?
The Final Moisture Content based on Initial to Final Moisture Content for Falling Rate Period formula is defined as the final moisture content that can be attained from the specified initial moisture content based on the drying conditions in falling rate period is calculated using Final Moisture Content for Falling Rate Period = ((Initial Moisture Content for Falling Rate Period-Equilibrium Moisture Content)/(exp((Drying Surface Area*Falling Rate Drying Time*Rate of Constant Drying Period)/(Dry Weight of Solid*(Initial Moisture Content for Falling Rate Period-Equilibrium Moisture Content)))))+Equilibrium Moisture Content. To calculate Final Moisture Content based on Initial to Final Moisture Content for Falling Rate Period, you need Initial Moisture Content for Falling Rate Period (Xi(Falling)), Equilibrium Moisture Content (XEq), Drying Surface Area (A), Falling Rate Drying Time (tf), Rate of Constant Drying Period (Nc) & Dry Weight of Solid (WS). With our tool, you need to enter the respective value for Initial Moisture Content for Falling Rate Period, Equilibrium Moisture Content, Drying Surface Area, Falling Rate Drying Time, Rate of Constant Drying Period & Dry Weight of Solid and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
How many ways are there to calculate Final Moisture Content for Falling Rate Period?
In this formula, Final Moisture Content for Falling Rate Period uses Initial Moisture Content for Falling Rate Period, Equilibrium Moisture Content, Drying Surface Area, Falling Rate Drying Time, Rate of Constant Drying Period & Dry Weight of Solid. We can use 1 other way(s) to calculate the same, which is/are as follows -
  • Final Moisture Content for Falling Rate Period = ((Critical Moisture Content-Equilibrium Moisture Content)/(exp((Drying Surface Area*Falling Rate Drying Time*Rate of Constant Drying Period)/(Dry Weight of Solid*(Critical Moisture Content-Equilibrium Moisture Content)))))+Equilibrium Moisture Content
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!