Depth after Dredging given Transport Ratio Solution

STEP 0: Pre-Calculation Summary
Formula Used
Depth after Dredging = Depth before Dredging/Transport Ratio^(2/5)
d2 = d1/tr^(2/5)
This formula uses 3 Variables
Variables Used
Depth after Dredging - (Measured in Meter) - Depth after Dredging is the new depth of a water body after the removal of accumulated sediment from the bottom or banks of bodies of water, including rivers, lakes, or streams is completed.
Depth before Dredging - (Measured in Meter) - Depth before Dredging refers to the original depth of a water body before the process of dredging is carried out and is determined through a thorough site assessment.
Transport Ratio - Transport Ratio is a relationship between the quantity of transported materials and the carrying medium, indicating the impact of the transported material within the transporting substance.
STEP 1: Convert Input(s) to Base Unit
Depth before Dredging: 5 Meter --> 5 Meter No Conversion Required
Transport Ratio: 3.58 --> No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
d2 = d1/tr^(2/5) --> 5/3.58^(2/5)
Evaluating ... ...
d2 = 3.00204220558816
STEP 3: Convert Result to Output's Unit
3.00204220558816 Meter --> No Conversion Required
FINAL ANSWER
3.00204220558816 3.002042 Meter <-- Depth after Dredging
(Calculation completed in 00.020 seconds)

Credits

Creator Image
Created by Mithila Muthamma PA
Coorg Institute of Technology (CIT), Coorg
Mithila Muthamma PA has created this Calculator and 2000+ more calculators!
Verifier Image
Verified by Chandana P Dev
NSS College of Engineering (NSSCE), Palakkad
Chandana P Dev has verified this Calculator and 1700+ more calculators!

Methods to Predict Channel Shoaling Calculators

Density of Water given Water Surface Slope
​ LaTeX ​ Go Density of Water = (Coefficient Eckman*Shear Stress at the Water Surface)/(Water Surface Slope*[g]*Eckman Constant Depth)
Transport Ratio
​ LaTeX ​ Go Transport Ratio = (Depth before Dredging/Depth after Dredging)^(5/2)
Depth before Dredging given Transport Ratio
​ LaTeX ​ Go Depth before Dredging = Depth after Dredging*Transport Ratio^(2/5)
Depth after Dredging given Transport Ratio
​ LaTeX ​ Go Depth after Dredging = Depth before Dredging/Transport Ratio^(2/5)

Depth after Dredging given Transport Ratio Formula

​LaTeX ​Go
Depth after Dredging = Depth before Dredging/Transport Ratio^(2/5)
d2 = d1/tr^(2/5)

What is Ocean Dynamics?

The Ocean Dynamics define and describe the motion of water within the oceans. Ocean temperature and motion fields can be separated into three distinct layers: mixed (surface) layer, upper ocean (above the thermocline), and deep ocean. Ocean dynamics has traditionally been investigated by sampling from instruments in situ.

What is Dredging?

Dredging is the act of removing silt and other material from the bottom of bodies of water. It is a routine necessity in waterways around the world because sedimentation—the natural process of sand and silt washing downstream—gradually fills channels and harbors.

How to Calculate Depth after Dredging given Transport Ratio?

Depth after Dredging given Transport Ratio calculator uses Depth after Dredging = Depth before Dredging/Transport Ratio^(2/5) to calculate the Depth after Dredging, The Depth after Dredging given Transport Ratio formula is defined as the new depth of a water body after the removal of accumulated sediment from the bottom or banks of bodies of water, including rivers, lakes, or streams is completed given the relationship between the quantity of transported materials and the carrying medium. Depth after Dredging is denoted by d2 symbol.

How to calculate Depth after Dredging given Transport Ratio using this online calculator? To use this online calculator for Depth after Dredging given Transport Ratio, enter Depth before Dredging (d1) & Transport Ratio (tr) and hit the calculate button. Here is how the Depth after Dredging given Transport Ratio calculation can be explained with given input values -> 2.626528 = 5/3.58^(2/5).

FAQ

What is Depth after Dredging given Transport Ratio?
The Depth after Dredging given Transport Ratio formula is defined as the new depth of a water body after the removal of accumulated sediment from the bottom or banks of bodies of water, including rivers, lakes, or streams is completed given the relationship between the quantity of transported materials and the carrying medium and is represented as d2 = d1/tr^(2/5) or Depth after Dredging = Depth before Dredging/Transport Ratio^(2/5). Depth before Dredging refers to the original depth of a water body before the process of dredging is carried out and is determined through a thorough site assessment & Transport Ratio is a relationship between the quantity of transported materials and the carrying medium, indicating the impact of the transported material within the transporting substance.
How to calculate Depth after Dredging given Transport Ratio?
The Depth after Dredging given Transport Ratio formula is defined as the new depth of a water body after the removal of accumulated sediment from the bottom or banks of bodies of water, including rivers, lakes, or streams is completed given the relationship between the quantity of transported materials and the carrying medium is calculated using Depth after Dredging = Depth before Dredging/Transport Ratio^(2/5). To calculate Depth after Dredging given Transport Ratio, you need Depth before Dredging (d1) & Transport Ratio (tr). With our tool, you need to enter the respective value for Depth before Dredging & Transport Ratio and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!