Efficiency Factor using Compaction Production by Compaction Equipment Solution

STEP 0: Pre-Calculation Summary
Formula Used
Efficiency Factor = (Production due to Compaction*Number of Passes)/(16*Width of Roller*Roller Speed*Lift Thickness*Pay Ratio)
E = (y*P)/(16*W*S*L*PR)
This formula uses 7 Variables
Variables Used
Efficiency Factor - The Efficiency Factor is a dimensionless parameter used to relate the strength or stiffness of improved soil (after treatment) to its original, untreated state.
Production due to Compaction - (Measured in Cubic Meter per Second) - Production due to Compaction is the exertion of force on something so that it becomes denser.
Number of Passes - Number of Passes is the number of times a compactor (such as a vibratory roller or a plate compactor) passes over a specific area of soil or aggregate during compaction.
Width of Roller - (Measured in Meter) - Width of Roller is the physical width of the roller used in compaction processes, such as those employed in soil and pavement construction.
Roller Speed - (Measured in Meter per Second) - Roller Speed is the velocity at which a compaction roller moves over soil or other materials during the compaction process.
Lift Thickness - (Measured in Meter) - Lift Thickness is the depth of a compacted layer of fill material placed during construction. This term is important in the compaction process, where fill material is often placed in layers.
Pay Ratio - (Measured in Cubic Meter) - Pay Ratio is the ratio between the effective stress and the total stress in soil mechanics.
STEP 1: Convert Input(s) to Base Unit
Production due to Compaction: 297.59 Cubic Meter per Hour --> 0.0826638888888889 Cubic Meter per Second (Check conversion ​here)
Number of Passes: 5 --> No Conversion Required
Width of Roller: 2.89 Meter --> 2.89 Meter No Conversion Required
Roller Speed: 3 Kilometer per Hour --> 0.833333333333333 Meter per Second (Check conversion ​here)
Lift Thickness: 7.175 Millimeter --> 0.007175 Meter (Check conversion ​here)
Pay Ratio: 2.99 Cubic Meter --> 2.99 Cubic Meter No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
E = (y*P)/(16*W*S*L*PR) --> (0.0826638888888889*5)/(16*2.89*0.833333333333333*0.007175*2.99)
Evaluating ... ...
E = 0.499984065832587
STEP 3: Convert Result to Output's Unit
0.499984065832587 --> No Conversion Required
FINAL ANSWER
0.499984065832587 0.499984 <-- Efficiency Factor
(Calculation completed in 00.020 seconds)

Credits

Creator Image
Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2100+ more calculators!
Verifier Image
Verified by Ishita Goyal
Meerut Institute of Engineering and Technology (MIET), Meerut
Ishita Goyal has verified this Calculator and 2600+ more calculators!

Compaction Equipment Calculators

Thickness of Lift given Compaction Production by Compaction Equipment
​ LaTeX ​ Go Lift Thickness = (Production due to Compaction*Number of Passes)/(16*Width of Roller*Roller Speed*Efficiency Factor*Pay Ratio)
Width of Roller given Compaction Production by Compaction Equipment
​ LaTeX ​ Go Width of Roller = (Production due to Compaction*Number of Passes)/(16*Roller Speed*Lift Thickness*Pay Ratio*Efficiency Factor)
Speed of Roller given Compaction Production by Compaction Equipment
​ LaTeX ​ Go Roller Speed = (Production due to Compaction*Number of Passes)/(16*Width of Roller*Lift Thickness*Pay Ratio*Efficiency Factor)
Compaction Production by Compaction Equipment
​ LaTeX ​ Go Production due to Compaction = (16*Width of Roller*Roller Speed*Lift Thickness*Efficiency Factor*Pay Ratio)/Number of Passes

Efficiency Factor using Compaction Production by Compaction Equipment Formula

​LaTeX ​Go
Efficiency Factor = (Production due to Compaction*Number of Passes)/(16*Width of Roller*Roller Speed*Lift Thickness*Pay Ratio)
E = (y*P)/(16*W*S*L*PR)

What is Efficiency Factor?

The efficiency factor is the relationship between the allowance time and the time taken, in the form of percentage.The efficiency factor is an extremely simple to use and readily comprehensible index, the prerequisite being exact time management for maintaining the allowed times.

How to Calculate Efficiency Factor using Compaction Production by Compaction Equipment?

Efficiency Factor using Compaction Production by Compaction Equipment calculator uses Efficiency Factor = (Production due to Compaction*Number of Passes)/(16*Width of Roller*Roller Speed*Lift Thickness*Pay Ratio) to calculate the Efficiency Factor, The Efficiency Factor using Compaction Production by Compaction Equipment formula is defined as the relationship between the allowance time and the time taken, in the form of percentage. Efficiency Factor is denoted by E symbol.

How to calculate Efficiency Factor using Compaction Production by Compaction Equipment using this online calculator? To use this online calculator for Efficiency Factor using Compaction Production by Compaction Equipment, enter Production due to Compaction (y), Number of Passes (P), Width of Roller (W), Roller Speed (S), Lift Thickness (L) & Pay Ratio (PR) and hit the calculate button. Here is how the Efficiency Factor using Compaction Production by Compaction Equipment calculation can be explained with given input values -> 0.469742 = (0.0826638888888889*5)/(16*2.89*0.833333333333333*0.007175*2.99).

FAQ

What is Efficiency Factor using Compaction Production by Compaction Equipment?
The Efficiency Factor using Compaction Production by Compaction Equipment formula is defined as the relationship between the allowance time and the time taken, in the form of percentage and is represented as E = (y*P)/(16*W*S*L*PR) or Efficiency Factor = (Production due to Compaction*Number of Passes)/(16*Width of Roller*Roller Speed*Lift Thickness*Pay Ratio). Production due to Compaction is the exertion of force on something so that it becomes denser, Number of Passes is the number of times a compactor (such as a vibratory roller or a plate compactor) passes over a specific area of soil or aggregate during compaction, Width of Roller is the physical width of the roller used in compaction processes, such as those employed in soil and pavement construction, Roller Speed is the velocity at which a compaction roller moves over soil or other materials during the compaction process, Lift Thickness is the depth of a compacted layer of fill material placed during construction. This term is important in the compaction process, where fill material is often placed in layers & Pay Ratio is the ratio between the effective stress and the total stress in soil mechanics.
How to calculate Efficiency Factor using Compaction Production by Compaction Equipment?
The Efficiency Factor using Compaction Production by Compaction Equipment formula is defined as the relationship between the allowance time and the time taken, in the form of percentage is calculated using Efficiency Factor = (Production due to Compaction*Number of Passes)/(16*Width of Roller*Roller Speed*Lift Thickness*Pay Ratio). To calculate Efficiency Factor using Compaction Production by Compaction Equipment, you need Production due to Compaction (y), Number of Passes (P), Width of Roller (W), Roller Speed (S), Lift Thickness (L) & Pay Ratio (PR). With our tool, you need to enter the respective value for Production due to Compaction, Number of Passes, Width of Roller, Roller Speed, Lift Thickness & Pay Ratio and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!