Dry Sludge Feed given Polymer Feed Rate of Dry Polymer Solution

STEP 0: Pre-Calculation Summary
Formula Used
Dry Sludge Feed = (2000*Polymer Feed Rate)/Polymer Dosage
S = (2000*P)/Dp
This formula uses 3 Variables
Variables Used
Dry Sludge Feed - (Measured in Kilogram per Second) - Dry Sludge Feed is defined as semi-solid material that is produced as a by-product during sewage treatment.
Polymer Feed Rate - (Measured in Kilogram per Second) - Polymer Feed Rate is defined in terms of weight of polymer per unit time.
Polymer Dosage - Polymer Dosage refers to the amount of polymer added to a solution or system to achieve a desired result, typically related to water or wastewater treatment processes.
STEP 1: Convert Input(s) to Base Unit
Polymer Feed Rate: 0.765 Pound per Hour --> 9.63883786271325E-05 Kilogram per Second (Check conversion ​here)
Polymer Dosage: 20 --> No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
S = (2000*P)/Dp --> (2000*9.63883786271325E-05)/20
Evaluating ... ...
S = 0.00963883786271325
STEP 3: Convert Result to Output's Unit
0.00963883786271325 Kilogram per Second -->76.5 Pound per Hour (Check conversion ​here)
FINAL ANSWER
76.5 Pound per Hour <-- Dry Sludge Feed
(Calculation completed in 00.020 seconds)

Credits

Creator Image
Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2100+ more calculators!
Verifier Image
Verified by Ishita Goyal
Meerut Institute of Engineering and Technology (MIET), Meerut
Ishita Goyal has verified this Calculator and 2600+ more calculators!

Polymer Feed Rate Calculators

Polymer Feed Rate as Volumetric Flow Rate
​ LaTeX ​ Go Volumetric Polymer Feed Rate = (Polymer Feed Rate/(8.34*Specific Gravity of Polymer*Percent Polymer Concentration))
Dry Sludge Feed given Polymer Feed Rate of Dry Polymer
​ LaTeX ​ Go Dry Sludge Feed = (2000*Polymer Feed Rate)/Polymer Dosage
Polymer Dosage when Polymer Feed Rate of Dry Polymer
​ LaTeX ​ Go Polymer Dosage = (2000*Polymer Feed Rate)/Dry Sludge Feed
Polymer Feed Rate of Dry Polymer
​ LaTeX ​ Go Polymer Feed Rate = (Polymer Dosage*Dry Sludge Feed)/2000

Dry Sludge Feed given Polymer Feed Rate of Dry Polymer Formula

​LaTeX ​Go
Dry Sludge Feed = (2000*Polymer Feed Rate)/Polymer Dosage
S = (2000*P)/Dp

What is Dry Polymer ?

The Dry Polymers are diluted with a day tank and low speed. mixer; polymer is added with an eductor and funnel. Most dry polymers require 1 to 4 hours of solution aging.

How to Calculate Dry Sludge Feed given Polymer Feed Rate of Dry Polymer?

Dry Sludge Feed given Polymer Feed Rate of Dry Polymer calculator uses Dry Sludge Feed = (2000*Polymer Feed Rate)/Polymer Dosage to calculate the Dry Sludge Feed, The Dry Sludge Feed given Polymer Feed Rate of Dry Polymer is defined as the semi-solid material that is produced as a by-product during sewage treatment, when we have prior information of polymer feed rate and polymer dosage. Dry Sludge Feed is denoted by S symbol.

How to calculate Dry Sludge Feed given Polymer Feed Rate of Dry Polymer using this online calculator? To use this online calculator for Dry Sludge Feed given Polymer Feed Rate of Dry Polymer, enter Polymer Feed Rate (P) & Polymer Dosage (Dp) and hit the calculate button. Here is how the Dry Sludge Feed given Polymer Feed Rate of Dry Polymer calculation can be explained with given input values -> 607153.1 = (2000*9.63883786271325E-05)/20.

FAQ

What is Dry Sludge Feed given Polymer Feed Rate of Dry Polymer?
The Dry Sludge Feed given Polymer Feed Rate of Dry Polymer is defined as the semi-solid material that is produced as a by-product during sewage treatment, when we have prior information of polymer feed rate and polymer dosage and is represented as S = (2000*P)/Dp or Dry Sludge Feed = (2000*Polymer Feed Rate)/Polymer Dosage. Polymer Feed Rate is defined in terms of weight of polymer per unit time & Polymer Dosage refers to the amount of polymer added to a solution or system to achieve a desired result, typically related to water or wastewater treatment processes.
How to calculate Dry Sludge Feed given Polymer Feed Rate of Dry Polymer?
The Dry Sludge Feed given Polymer Feed Rate of Dry Polymer is defined as the semi-solid material that is produced as a by-product during sewage treatment, when we have prior information of polymer feed rate and polymer dosage is calculated using Dry Sludge Feed = (2000*Polymer Feed Rate)/Polymer Dosage. To calculate Dry Sludge Feed given Polymer Feed Rate of Dry Polymer, you need Polymer Feed Rate (P) & Polymer Dosage (Dp). With our tool, you need to enter the respective value for Polymer Feed Rate & Polymer Dosage and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!