Detention Time given Volume of Each Grit Chamber Solution

STEP 0: Pre-Calculation Summary
Formula Used
Detention Time = Volume of Grit Chamber/Peak Flow Rate
Td = VT/Qp
This formula uses 3 Variables
Variables Used
Detention Time - (Measured in Second) - The Detention Time refers to the duration that wastewater or another fluid remains in a treatment process or tank, typically measured in hours, to allow for adequate treatment or settling.
Volume of Grit Chamber - (Measured in Cubic Meter) - The Volume of Grit Chamber refers to the total capacity of the chamber to hold wastewater and allow grit to settle, typically measured in cubic meters (m³).
Peak Flow Rate - (Measured in Cubic Meter per Second) - The Peak Flow Rate refers to the highest flow rate of wastewater or fluid entering a treatment system during a specific period, typically measured in (m³/s) or (gpm).
STEP 1: Convert Input(s) to Base Unit
Volume of Grit Chamber: 45 Cubic Meter --> 45 Cubic Meter No Conversion Required
Peak Flow Rate: 0.25 Cubic Meter per Second --> 0.25 Cubic Meter per Second No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
Td = VT/Qp --> 45/0.25
Evaluating ... ...
Td = 180
STEP 3: Convert Result to Output's Unit
180 Second -->3 Minute (Check conversion ​here)
FINAL ANSWER
3 Minute <-- Detention Time
(Calculation completed in 00.004 seconds)

Credits

Creator Image
Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2100+ more calculators!
Verifier Image
Verified by Ishita Goyal
Meerut Institute of Engineering and Technology (MIET), Meerut
Ishita Goyal has verified this Calculator and 2600+ more calculators!

Design of an Aerated Grit Chamber Calculators

Width of Grit Chamber
​ LaTeX ​ Go Width of Grit Chamber = (Selected Width Ratio*Depth of Grit Chamber)
Volume of Each Grit Chamber
​ LaTeX ​ Go Volume of Grit Chamber = (Peak Flow Rate*Detention Time)
Peak Flow Rate given Volume of Each Grit Chamber
​ LaTeX ​ Go Peak Flow Rate = Volume of Grit Chamber/Detention Time
Detention Time given Volume of Each Grit Chamber
​ LaTeX ​ Go Detention Time = Volume of Grit Chamber/Peak Flow Rate

Detention Time given Volume of Each Grit Chamber Formula

​LaTeX ​Go
Detention Time = Volume of Grit Chamber/Peak Flow Rate
Td = VT/Qp

What is Detention Time ?

Detention time is the length of time water is retained in a vessel or basin or the period from the time the water enters a settling basin until it flows out the other end. When calculating unit process detention times, we are calculating the length of time it takes the water to flow through that unit process.

How to Calculate Detention Time given Volume of Each Grit Chamber?

Detention Time given Volume of Each Grit Chamber calculator uses Detention Time = Volume of Grit Chamber/Peak Flow Rate to calculate the Detention Time, The Detention Time given Volume of Each Grit Chamber formula is defined as the duration that wastewater or another fluid remains in a treatment process or tank, typically measured in hours, to allow for adequate treatment or settling. Detention Time is denoted by Td symbol.

How to calculate Detention Time given Volume of Each Grit Chamber using this online calculator? To use this online calculator for Detention Time given Volume of Each Grit Chamber, enter Volume of Grit Chamber (VT) & Peak Flow Rate (Qp) and hit the calculate button. Here is how the Detention Time given Volume of Each Grit Chamber calculation can be explained with given input values -> 0.0007 = 45/0.25.

FAQ

What is Detention Time given Volume of Each Grit Chamber?
The Detention Time given Volume of Each Grit Chamber formula is defined as the duration that wastewater or another fluid remains in a treatment process or tank, typically measured in hours, to allow for adequate treatment or settling and is represented as Td = VT/Qp or Detention Time = Volume of Grit Chamber/Peak Flow Rate. The Volume of Grit Chamber refers to the total capacity of the chamber to hold wastewater and allow grit to settle, typically measured in cubic meters (m³) & The Peak Flow Rate refers to the highest flow rate of wastewater or fluid entering a treatment system during a specific period, typically measured in (m³/s) or (gpm).
How to calculate Detention Time given Volume of Each Grit Chamber?
The Detention Time given Volume of Each Grit Chamber formula is defined as the duration that wastewater or another fluid remains in a treatment process or tank, typically measured in hours, to allow for adequate treatment or settling is calculated using Detention Time = Volume of Grit Chamber/Peak Flow Rate. To calculate Detention Time given Volume of Each Grit Chamber, you need Volume of Grit Chamber (VT) & Peak Flow Rate (Qp). With our tool, you need to enter the respective value for Volume of Grit Chamber & Peak Flow Rate and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.