Demand Factor Solution

STEP 0: Pre-Calculation Summary
Formula Used
Demand Factor = Maximum Demand/Connected Load
Demand Factor = Max Demand/Connected Load
This formula uses 3 Variables
Variables Used
Demand Factor - Demand Factor is the ratio of maximum demand to connected load.
Maximum Demand - (Measured in Watt) - Maximum Demand is defined as the peak power consumption of the load connected.
Connected Load - (Measured in Watt) - Connected Load is defined as the total load connected to the plant at any point of time.
STEP 1: Convert Input(s) to Base Unit
Maximum Demand: 1700 Kilowatt --> 1700000 Watt (Check conversion ​here)
Connected Load: 3600 Kilowatt --> 3600000 Watt (Check conversion ​here)
STEP 2: Evaluate Formula
Substituting Input Values in Formula
Demand Factor = Max Demand/Connected Load --> 1700000/3600000
Evaluating ... ...
Demand Factor = 0.472222222222222
STEP 3: Convert Result to Output's Unit
0.472222222222222 --> No Conversion Required
FINAL ANSWER
0.472222222222222 0.472222 <-- Demand Factor
(Calculation completed in 00.004 seconds)

Credits

Creator Image
Created by Prahalad Singh
Jaipur Engineering College and Research Centre (JECRC), Jaipur
Prahalad Singh has created this Calculator and 100+ more calculators!
Verifier Image
Verified by Payal Priya
Birsa Institute of Technology (BIT), Sindri
Payal Priya has verified this Calculator and 1900+ more calculators!

Power Plant Operational Factors Calculators

Unit Generated per Annum
​ LaTeX ​ Go Units Generated = Maximum Demand*Load Factor*8760
Demand Factor
​ LaTeX ​ Go Demand Factor = Maximum Demand/Connected Load
Load Factor given Average Load and Maximum Demand
​ LaTeX ​ Go Load Factor = Average Load/Maximum Demand
Average Load for Load Curve
​ LaTeX ​ Go Average Load = Load Curve Area/24

Demand Factor Formula

​LaTeX ​Go
Demand Factor = Maximum Demand/Connected Load
Demand Factor = Max Demand/Connected Load

What is the realtion between the Demand Factor and System Capacity?

The lower the demand factor, the less system capacity required to serve the connected load. The value of the demand Factor is less than equal to 1 .

How to Calculate Demand Factor?

Demand Factor calculator uses Demand Factor = Maximum Demand/Connected Load to calculate the Demand Factor, The Demand Factor formula is defined as the ratio of maximum demand to the total load connected across the system. Demand Factor is denoted by Demand Factor symbol.

How to calculate Demand Factor using this online calculator? To use this online calculator for Demand Factor, enter Maximum Demand (Max Demand) & Connected Load (Connected Load) and hit the calculate button. Here is how the Demand Factor calculation can be explained with given input values -> 0.472222 = 1700000/3600000.

FAQ

What is Demand Factor?
The Demand Factor formula is defined as the ratio of maximum demand to the total load connected across the system and is represented as Demand Factor = Max Demand/Connected Load or Demand Factor = Maximum Demand/Connected Load. Maximum Demand is defined as the peak power consumption of the load connected & Connected Load is defined as the total load connected to the plant at any point of time.
How to calculate Demand Factor?
The Demand Factor formula is defined as the ratio of maximum demand to the total load connected across the system is calculated using Demand Factor = Maximum Demand/Connected Load. To calculate Demand Factor, you need Maximum Demand (Max Demand) & Connected Load (Connected Load). With our tool, you need to enter the respective value for Maximum Demand & Connected Load and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.