Cycle Time given Trips per Hour for Excavating Scrap Solution

STEP 0: Pre-Calculation Summary
Formula Used
Cycle Time = (Working Time in Scraper Production/Trips per Hour)
Ct = (WT/f)
This formula uses 3 Variables
Variables Used
Cycle Time - (Measured in Second) - Cycle Time is the time taken to complete one trip.
Working Time in Scraper Production - Working Time in Scraper Production is the ratio of time which is expressed in hr/hr.
Trips per Hour - (Measured in Hertz) - Trips per Hour means the total transfer occured in a hour.
STEP 1: Convert Input(s) to Base Unit
Working Time in Scraper Production: 22.8 --> No Conversion Required
Trips per Hour: 4 Revolution per Hour --> 0.00111111111111111 Hertz (Check conversion ​here)
STEP 2: Evaluate Formula
Substituting Input Values in Formula
Ct = (WT/f) --> (22.8/0.00111111111111111)
Evaluating ... ...
Ct = 20520
STEP 3: Convert Result to Output's Unit
20520 Second -->5.70000000000001 Hour (Check conversion ​here)
FINAL ANSWER
5.70000000000001 5.7 Hour <-- Cycle Time
(Calculation completed in 00.004 seconds)

Credits

Creator Image
Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2100+ more calculators!
Verifier Image
Verified by Ishita Goyal
Meerut Institute of Engineering and Technology (MIET), Meerut
Ishita Goyal has verified this Calculator and 2600+ more calculators!

Scraper Production Calculators

Trips per Hour given Production of Scrap by Machines
​ LaTeX ​ Go Trips per Hour = (Production Required in Scraper Production/Load in Scraper Production)
Load Given Production of Scrap by Machines
​ LaTeX ​ Go Load in Scraper Production = (Production Required in Scraper Production/Trips per Hour)
Production of Scrap by Machines
​ LaTeX ​ Go Production Required in Scraper Production = (Load in Scraper Production*Trips per Hour)
Trips per Hour for Excavating Scrap
​ LaTeX ​ Go Trips per Hour = (Working Time in Scraper Production/Cycle Time)

Cycle Time given Trips per Hour for Excavating Scrap Formula

​LaTeX ​Go
Cycle Time = (Working Time in Scraper Production/Trips per Hour)
Ct = (WT/f)

What is Cycle Time?

Cycle Time is the amount of time a team spends actually working on producing an item, up until the product is ready for shipment. It is the time it takes to complete one task.

How to Calculate Cycle Time given Trips per Hour for Excavating Scrap?

Cycle Time given Trips per Hour for Excavating Scrap calculator uses Cycle Time = (Working Time in Scraper Production/Trips per Hour) to calculate the Cycle Time, The Cycle Time given Trips per Hour For Excavating Scrap is defined as the amount of time actually required to complete the work. Cycle Time is denoted by Ct symbol.

How to calculate Cycle Time given Trips per Hour for Excavating Scrap using this online calculator? To use this online calculator for Cycle Time given Trips per Hour for Excavating Scrap, enter Working Time in Scraper Production (WT) & Trips per Hour (f) and hit the calculate button. Here is how the Cycle Time given Trips per Hour for Excavating Scrap calculation can be explained with given input values -> 0.001583 = (22.8/0.00111111111111111).

FAQ

What is Cycle Time given Trips per Hour for Excavating Scrap?
The Cycle Time given Trips per Hour For Excavating Scrap is defined as the amount of time actually required to complete the work and is represented as Ct = (WT/f) or Cycle Time = (Working Time in Scraper Production/Trips per Hour). Working Time in Scraper Production is the ratio of time which is expressed in hr/hr & Trips per Hour means the total transfer occured in a hour.
How to calculate Cycle Time given Trips per Hour for Excavating Scrap?
The Cycle Time given Trips per Hour For Excavating Scrap is defined as the amount of time actually required to complete the work is calculated using Cycle Time = (Working Time in Scraper Production/Trips per Hour). To calculate Cycle Time given Trips per Hour for Excavating Scrap, you need Working Time in Scraper Production (WT) & Trips per Hour (f). With our tool, you need to enter the respective value for Working Time in Scraper Production & Trips per Hour and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.