Constant Drying Time based on Total Drying Time and Falling Drying Time Solution

STEP 0: Pre-Calculation Summary
Formula Used
Constant Rate Drying Time = Total Drying Time-Falling Rate Drying Time
tc = t-tf
This formula uses 3 Variables
Variables Used
Constant Rate Drying Time - (Measured in Second) - The Constant Rate Drying Time is the time taken for drying operation in the constant rate period.
Total Drying Time - (Measured in Second) - The Total Drying Time is the time taken for complete drying operation i.e. a sum of drying times in constant and falling rate period.
Falling Rate Drying Time - (Measured in Second) - The Falling rate drying time is the time taken for drying operation in the falling rate period.
STEP 1: Convert Input(s) to Base Unit
Total Drying Time: 227 Second --> 227 Second No Conversion Required
Falling Rate Drying Time: 37 Second --> 37 Second No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
tc = t-tf --> 227-37
Evaluating ... ...
tc = 190
STEP 3: Convert Result to Output's Unit
190 Second --> No Conversion Required
FINAL ANSWER
190 Second <-- Constant Rate Drying Time
(Calculation completed in 00.020 seconds)

Credits

Creator Image
Created by Vaibhav Mishra
DJ Sanghvi College of Engineering (DJSCE), Mumbai
Vaibhav Mishra has created this Calculator and 300+ more calculators!
Verifier Image
Verified by Prerana Bakli
University of Hawaiʻi at Mānoa (UH Manoa), Hawaii, USA
Prerana Bakli has verified this Calculator and 1600+ more calculators!

Drying Time Calculators

Total Drying Time based on Constant Drying Time and Falling Drying Time
​ LaTeX ​ Go Total Drying Time = Constant Rate Drying Time+Falling Rate Drying Time
Constant Drying Time based on Total Drying Time and Falling Drying Time
​ LaTeX ​ Go Constant Rate Drying Time = Total Drying Time-Falling Rate Drying Time
Falling Drying Time based on Constant Drying Time and Total Drying Time
​ LaTeX ​ Go Falling Rate Drying Time = Total Drying Time-Constant Rate Drying Time

Constant Drying Time based on Total Drying Time and Falling Drying Time Formula

​LaTeX ​Go
Constant Rate Drying Time = Total Drying Time-Falling Rate Drying Time
tc = t-tf

What is Drying Mass Transfer operation?

Drying is a mass transfer operation that involves the removal of moisture or other volatile solvents from a solid material. The process of drying is used in a variety of industries, including food processing, pharmaceuticals, chemicals, and textiles. In drying, heat is applied to the material to increase its temperature, which causes the moisture or solvent to evaporate. The evaporated moisture is then removed from the material using a drying medium, such as air, which carries away the moisture as it flows over the surface of the material. There are several types of drying techniques, including convection drying, which uses hot air to remove moisture; radiation drying, which uses infrared radiation to heat the material and remove moisture; and vacuum drying, which removes moisture by creating a low-pressure environment.

How to Calculate Constant Drying Time based on Total Drying Time and Falling Drying Time?

Constant Drying Time based on Total Drying Time and Falling Drying Time calculator uses Constant Rate Drying Time = Total Drying Time-Falling Rate Drying Time to calculate the Constant Rate Drying Time, The Constant Drying Time based on Total Drying Time and Falling Drying Time formula is defined as time taken to dry a solid from its critical moisture content to final moisture content in falling rate period, as a difference between total time taken for drying to the constant rate period drying time. Constant Rate Drying Time is denoted by tc symbol.

How to calculate Constant Drying Time based on Total Drying Time and Falling Drying Time using this online calculator? To use this online calculator for Constant Drying Time based on Total Drying Time and Falling Drying Time, enter Total Drying Time (t) & Falling Rate Drying Time (tf) and hit the calculate button. Here is how the Constant Drying Time based on Total Drying Time and Falling Drying Time calculation can be explained with given input values -> 190 = 227-37.

FAQ

What is Constant Drying Time based on Total Drying Time and Falling Drying Time?
The Constant Drying Time based on Total Drying Time and Falling Drying Time formula is defined as time taken to dry a solid from its critical moisture content to final moisture content in falling rate period, as a difference between total time taken for drying to the constant rate period drying time and is represented as tc = t-tf or Constant Rate Drying Time = Total Drying Time-Falling Rate Drying Time. The Total Drying Time is the time taken for complete drying operation i.e. a sum of drying times in constant and falling rate period & The Falling rate drying time is the time taken for drying operation in the falling rate period.
How to calculate Constant Drying Time based on Total Drying Time and Falling Drying Time?
The Constant Drying Time based on Total Drying Time and Falling Drying Time formula is defined as time taken to dry a solid from its critical moisture content to final moisture content in falling rate period, as a difference between total time taken for drying to the constant rate period drying time is calculated using Constant Rate Drying Time = Total Drying Time-Falling Rate Drying Time. To calculate Constant Drying Time based on Total Drying Time and Falling Drying Time, you need Total Drying Time (t) & Falling Rate Drying Time (tf). With our tool, you need to enter the respective value for Total Drying Time & Falling Rate Drying Time and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!