Burden given Stemming at Top of Borehole Solution

STEP 0: Pre-Calculation Summary
Formula Used
Burden = (Stemming at Top of Borehole-(Overburden/2))/0.7
B = (S-(OB/2))/0.7
This formula uses 3 Variables
Variables Used
Burden - (Measured in Meter) - Burden is the distance from the blast hole to the nearest perpendicular free face.
Stemming at Top of Borehole - (Measured in Meter) - Stemming at Top of Borehole involves preventing soil or fluid influx during drilling operations to maintain stability.
Overburden - (Measured in Meter) - Overburden is the material that lies above an area that lends itself to economical exploitation, such as the rock, soil, and ecosystem.
STEP 1: Convert Input(s) to Base Unit
Stemming at Top of Borehole: 11.3 Foot --> 3.44424000001378 Meter (Check conversion ​here)
Overburden: 3.02 Foot --> 0.920496000003682 Meter (Check conversion ​here)
STEP 2: Evaluate Formula
Substituting Input Values in Formula
B = (S-(OB/2))/0.7 --> (3.44424000001378-(0.920496000003682/2))/0.7
Evaluating ... ...
B = 4.26284571430277
STEP 3: Convert Result to Output's Unit
4.26284571430277 Meter -->13.9857142857143 Foot (Check conversion ​here)
FINAL ANSWER
13.9857142857143 13.98571 Foot <-- Burden
(Calculation completed in 00.021 seconds)

Credits

Creator Image
Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2100+ more calculators!
Verifier Image
Verified by Ishita Goyal
Meerut Institute of Engineering and Technology (MIET), Meerut
Ishita Goyal has verified this Calculator and 2600+ more calculators!

Parameters of Vibration Control in Blasting Calculators

Frequency of Vibration given Acceleration of Particles
​ LaTeX ​ Go Frequency of Vibration = sqrt(Acceleration of Particles/(4*(pi)^2*Amplitude of Vibration))
Amplitude of Vibrations using Velocity of Particle
​ LaTeX ​ Go Amplitude of Vibration = (Velocity of Particle/(2*pi*Frequency of Vibration))
Frequency of Vibration given Velocity of Particle
​ LaTeX ​ Go Frequency of Vibration = (Velocity of Particle/(2*pi*Amplitude of Vibration))
Frequency of Vibrations caused by Blasting
​ LaTeX ​ Go Frequency of Vibration = (Velocity of Vibration/Wavelength of Vibration)

Burden given Stemming at Top of Borehole Formula

​LaTeX ​Go
Burden = (Stemming at Top of Borehole-(Overburden/2))/0.7
B = (S-(OB/2))/0.7

What is Burden?

The burden is the distance from a single row to the face of the excavation, or between rows in the usual case where rows are fired in sequence.

How to Calculate Burden given Stemming at Top of Borehole?

Burden given Stemming at Top of Borehole calculator uses Burden = (Stemming at Top of Borehole-(Overburden/2))/0.7 to calculate the Burden, The Burden given Stemming at Top of Borehole is defined as the distance from the blast hole to the nearest perpendicular free face. Burden is denoted by B symbol.

How to calculate Burden given Stemming at Top of Borehole using this online calculator? To use this online calculator for Burden given Stemming at Top of Borehole, enter Stemming at Top of Borehole (S) & Overburden (OB) and hit the calculate button. Here is how the Burden given Stemming at Top of Borehole calculation can be explained with given input values -> 45.93176 = (3.44424000001378-(0.920496000003682/2))/0.7.

FAQ

What is Burden given Stemming at Top of Borehole?
The Burden given Stemming at Top of Borehole is defined as the distance from the blast hole to the nearest perpendicular free face and is represented as B = (S-(OB/2))/0.7 or Burden = (Stemming at Top of Borehole-(Overburden/2))/0.7. Stemming at Top of Borehole involves preventing soil or fluid influx during drilling operations to maintain stability & Overburden is the material that lies above an area that lends itself to economical exploitation, such as the rock, soil, and ecosystem.
How to calculate Burden given Stemming at Top of Borehole?
The Burden given Stemming at Top of Borehole is defined as the distance from the blast hole to the nearest perpendicular free face is calculated using Burden = (Stemming at Top of Borehole-(Overburden/2))/0.7. To calculate Burden given Stemming at Top of Borehole, you need Stemming at Top of Borehole (S) & Overburden (OB). With our tool, you need to enter the respective value for Stemming at Top of Borehole & Overburden and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
How many ways are there to calculate Burden?
In this formula, Burden uses Stemming at Top of Borehole & Overburden. We can use 2 other way(s) to calculate the same, which is/are as follows -
  • Burden = (3.15*Diameter of Explosive)*(Specific Gravity of Explosive/Specific Gravity of Rock)^(1/3)
  • Burden = (Blasting Space)^2/Length of Borehole
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!