Average Production Cost of each component Solution

STEP 0: Pre-Calculation Summary
Formula Used
Average Production Cost = Cost of a Tool*(Setup Time+Machining Time)+(Number of Tools Used/Batch Size)*((Cost of a Tool*Tool Changing Time)+Cost of a Tool)
ca = Ct*(ts+tm)+(Nt/Nb)*((Ct*T)+Ct)
This formula uses 7 Variables
Variables Used
Average Production Cost - Average production cost involves accounting for various factors, including material costs, labor, machine operating costs, tool costs, overhead, and other related expenses.
Cost of a Tool - Cost of a tool is a multifaceted consideration that includes the initial purchase price, maintenance costs, tool life, and the impact on overall production costs.
Setup Time - (Measured in Second) - Setup Time of each component is the time required to load/unload the workpiece and position the tool for production for one component.
Machining Time - (Measured in Second) - Machining time refers to the total time required to complete a specific machining operation on a workpiece.
Number of Tools Used - The Number of Tools Used is the total number of tools used for manufacturing a batch of products.
Batch Size - Batch size refers to the number of identical parts produced in a single production run or cycle.
Tool Changing Time - (Measured in Second) - Tool changing time referred to as tool change time, is the duration required to remove a used tool and replace it with a new one.
STEP 1: Convert Input(s) to Base Unit
Cost of a Tool: 80 --> No Conversion Required
Setup Time: 0.45 Minute --> 27 Second (Check conversion ​here)
Machining Time: 1.15 Minute --> 69 Second (Check conversion ​here)
Number of Tools Used: 3 --> No Conversion Required
Batch Size: 2 --> No Conversion Required
Tool Changing Time: 0.2 Minute --> 12 Second (Check conversion ​here)
STEP 2: Evaluate Formula
Substituting Input Values in Formula
ca = Ct*(ts+tm)+(Nt/Nb)*((Ct*T)+Ct) --> 80*(27+69)+(3/2)*((80*12)+80)
Evaluating ... ...
ca = 9240
STEP 3: Convert Result to Output's Unit
9240 --> No Conversion Required
FINAL ANSWER
9240 <-- Average Production Cost
(Calculation completed in 00.020 seconds)

Credits

Creator Image
Created by Kumar Siddhant
Indian Institute of Information Technology, Design and Manufacturing (IIITDM), Jabalpur
Kumar Siddhant has created this Calculator and 400+ more calculators!
Verifier Image
Verified by Parul Keshav
National Institute of Technology (NIT), Srinagar
Parul Keshav has verified this Calculator and 400+ more calculators!

Average Production Cost Calculators

Total Non-Productive Time using Average Production Cost
​ LaTeX ​ Go Non Productive Time = (Batch Size*(Production Cost of Each Component-Cost of a Tool*Machining Time)-(Cost of a Tool*Number of Tools Used*Time to Change One Tool)-(Number of Tools Used*Cost of a Tool))/Cost of a Tool
Setup Time for Each Product given Average Production Cost
​ LaTeX ​ Go Setup Time = (Production Cost of Each Component-Cost of a Tool*Machining Time-(Number of Tools Used/Batch Size)*(Cost of a Tool*Time to Change One Tool+Cost of a Tool))/Cost of a Tool
Number of Tools used given Average Production Cost
​ LaTeX ​ Go Number of Tools Used = Batch Size*(Production Cost of Each Component-Cost of a Tool*(Setup Time+Machining Time))/(Cost of a Tool*Time to Change One Tool+Cost of a Tool)
Number of Tools used given Average Production Time
​ LaTeX ​ Go Number of Tools Used = Batch Size*(Average Production Time-(Setup Time+Machining Time))/Time to Change One Tool

Average Production Cost of each component Formula

​LaTeX ​Go
Average Production Cost = Cost of a Tool*(Setup Time+Machining Time)+(Number of Tools Used/Batch Size)*((Cost of a Tool*Tool Changing Time)+Cost of a Tool)
ca = Ct*(ts+tm)+(Nt/Nb)*((Ct*T)+Ct)

Components of Average Production Cost

1) Material Cost: The cost of raw materials used for the parts.
2) Labor Cost: Wages and benefits for the operators and other direct labor involved.
3) Machine Operating Cost: Includes depreciation, maintenance, and energy costs associated with running the machines.
4) Tooling Cost: The cost of tools, including their purchase, maintenance, and replacement.
5) Overhead Cost: Indirect costs such as utilities, rent, and administrative expenses.
6) Setup and Changeover Costs: Time and resources spent on preparing machines and tools for production.
7) Quality Control and Inspection Costs: Ensuring parts meet quality standards.
8) Non-Productive Time Costs: Time when the machine is not producing parts, including tool changes and machine downtime.

How to Calculate Average Production Cost of each component?

Average Production Cost of each component calculator uses Average Production Cost = Cost of a Tool*(Setup Time+Machining Time)+(Number of Tools Used/Batch Size)*((Cost of a Tool*Tool Changing Time)+Cost of a Tool) to calculate the Average Production Cost, The Average Production Cost of each component is defined as the total cost of producing a single component from scratch including all necessary operations and processes. The reason for this is the extended costs such as the cost of tools and operating costs etc. This makes the Average Production Cost becomes quite higher for a single product than when measured over batch size. Average Production Cost is denoted by ca symbol.

How to calculate Average Production Cost of each component using this online calculator? To use this online calculator for Average Production Cost of each component, enter Cost of a Tool (Ct), Setup Time (ts), Machining Time (tm), Number of Tools Used (Nt), Batch Size (Nb) & Tool Changing Time (T) and hit the calculate button. Here is how the Average Production Cost of each component calculation can be explained with given input values -> 9240 = 80*(27+69)+(3/2)*((80*12)+80).

FAQ

What is Average Production Cost of each component?
The Average Production Cost of each component is defined as the total cost of producing a single component from scratch including all necessary operations and processes. The reason for this is the extended costs such as the cost of tools and operating costs etc. This makes the Average Production Cost becomes quite higher for a single product than when measured over batch size and is represented as ca = Ct*(ts+tm)+(Nt/Nb)*((Ct*T)+Ct) or Average Production Cost = Cost of a Tool*(Setup Time+Machining Time)+(Number of Tools Used/Batch Size)*((Cost of a Tool*Tool Changing Time)+Cost of a Tool). Cost of a tool is a multifaceted consideration that includes the initial purchase price, maintenance costs, tool life, and the impact on overall production costs, Setup Time of each component is the time required to load/unload the workpiece and position the tool for production for one component, Machining time refers to the total time required to complete a specific machining operation on a workpiece, The Number of Tools Used is the total number of tools used for manufacturing a batch of products, Batch size refers to the number of identical parts produced in a single production run or cycle & Tool changing time referred to as tool change time, is the duration required to remove a used tool and replace it with a new one.
How to calculate Average Production Cost of each component?
The Average Production Cost of each component is defined as the total cost of producing a single component from scratch including all necessary operations and processes. The reason for this is the extended costs such as the cost of tools and operating costs etc. This makes the Average Production Cost becomes quite higher for a single product than when measured over batch size is calculated using Average Production Cost = Cost of a Tool*(Setup Time+Machining Time)+(Number of Tools Used/Batch Size)*((Cost of a Tool*Tool Changing Time)+Cost of a Tool). To calculate Average Production Cost of each component, you need Cost of a Tool (Ct), Setup Time (ts), Machining Time (tm), Number of Tools Used (Nt), Batch Size (Nb) & Tool Changing Time (T). With our tool, you need to enter the respective value for Cost of a Tool, Setup Time, Machining Time, Number of Tools Used, Batch Size & Tool Changing Time and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.