Average Daily Load using Peak Discharge in Circular Settling Tanks Solution

STEP 0: Pre-Calculation Summary
Formula Used
Average Daily Load = (Peak Discharge/Peaking Factor)
Qd = (Qp/f)
This formula uses 3 Variables
Variables Used
Average Daily Load - (Measured in Cubic Meter per Second) - Average Daily Load is the total amount of a substance, such as pollutants or nutrients, entering a system per day, averaged over a specified period, typically measured in kilograms per day (kg/day).
Peak Discharge - (Measured in Cubic Meter per Second) - Peak Discharge is the maximum volume flow rate passing a particular location during an event.
Peaking Factor - The Peaking Factor is the ratio of the peak flow rate to the average flow rate used to determine the tank's capacity to handle high-flow periods.
STEP 1: Convert Input(s) to Base Unit
Peak Discharge: 37.5 Million Liters per Day --> 0.434027777777778 Cubic Meter per Second (Check conversion ​here)
Peaking Factor: 2.5 --> No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
Qd = (Qp/f) --> (0.434027777777778/2.5)
Evaluating ... ...
Qd = 0.173611111111111
STEP 3: Convert Result to Output's Unit
0.173611111111111 Cubic Meter per Second -->15 Million Liters per Day (Check conversion ​here)
FINAL ANSWER
15 Million Liters per Day <-- Average Daily Load
(Calculation completed in 00.020 seconds)

Credits

Creator Image
Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2100+ more calculators!
Verifier Image
Verified by Ishita Goyal
Meerut Institute of Engineering and Technology (MIET), Meerut
Ishita Goyal has verified this Calculator and 2600+ more calculators!

Design of a Circular Settling Tank Calculators

Design Surface Loading Rate given Surface Area of Circular Settling Tank
​ LaTeX ​ Go Surface Loading Rate = (Peak Discharge/Surface Area)
Peak Discharge given Surface Area of Circular Settling Tank
​ LaTeX ​ Go Peak Discharge = (Surface Area*Surface Loading Rate)
Surface Area of Circular Settling Tank
​ LaTeX ​ Go Surface Area = (Peak Discharge/Surface Loading Rate)
Peak Discharge in Circular Settling Tanks
​ LaTeX ​ Go Peak Discharge = Average Daily Load*Peaking Factor

Average Daily Load using Peak Discharge in Circular Settling Tanks Formula

​LaTeX ​Go
Average Daily Load = (Peak Discharge/Peaking Factor)
Qd = (Qp/f)

What is Average Daily Demand?

Average Daily Demand (ADD) - The total volume of water delivered to the system over a year divided by 365 days. The average use in a single day expressed in gallons per day.

How to Calculate Average Daily Load using Peak Discharge in Circular Settling Tanks?

Average Daily Load using Peak Discharge in Circular Settling Tanks calculator uses Average Daily Load = (Peak Discharge/Peaking Factor) to calculate the Average Daily Load, The Average Daily Load using Peak Discharge in Circular Settling Tanks is defined as the customer's average daily consumption of water in mld. Average Daily Load is denoted by Qd symbol.

How to calculate Average Daily Load using Peak Discharge in Circular Settling Tanks using this online calculator? To use this online calculator for Average Daily Load using Peak Discharge in Circular Settling Tanks, enter Peak Discharge (Qp) & Peaking Factor (f) and hit the calculate button. Here is how the Average Daily Load using Peak Discharge in Circular Settling Tanks calculation can be explained with given input values -> 1.6 = (37.5/2.5).

FAQ

What is Average Daily Load using Peak Discharge in Circular Settling Tanks?
The Average Daily Load using Peak Discharge in Circular Settling Tanks is defined as the customer's average daily consumption of water in mld and is represented as Qd = (Qp/f) or Average Daily Load = (Peak Discharge/Peaking Factor). Peak Discharge is the maximum volume flow rate passing a particular location during an event & The Peaking Factor is the ratio of the peak flow rate to the average flow rate used to determine the tank's capacity to handle high-flow periods.
How to calculate Average Daily Load using Peak Discharge in Circular Settling Tanks?
The Average Daily Load using Peak Discharge in Circular Settling Tanks is defined as the customer's average daily consumption of water in mld is calculated using Average Daily Load = (Peak Discharge/Peaking Factor). To calculate Average Daily Load using Peak Discharge in Circular Settling Tanks, you need Peak Discharge (Qp) & Peaking Factor (f). With our tool, you need to enter the respective value for Peak Discharge & Peaking Factor and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!